You are on page 1of 1

Per Unit

,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100


1K 1K
Normalized (shifted) TCC
3-Phase (Sym) fault: 27,191kA @ 0,46kV
500
ML1.460:Q0 Faulted Bus: ML1-460 500
27,191 kA @ 0,46 kV SQOP File: Alimentador Principal
t1: 0,001 s, t2: 0,0344 s Data Rev: Base
300 300
Configuration: Normal
Date: 04-01-2020

100 100

50 TX1-BB-0,46 50

30 30

Cable40
10 10
21-1/C 4/0
5 5
ML1.460:Q0-BB

Seconds
Seconds

3 3

1 1

ML1.460:Q0
,5 ,5

,3 ,3

,1 ,1
ML1-460
,05 ,05

,03 ,03

,01 ,01
,005 ,01 ,03 ,05 ,1 ,3 ,5 1 3 5 10 30 50 100

Per Unit ETAP Star 12.6.0H

Consultoria e ingenieria ML1-0,46

Project: Estudio de Arco Colanta Date: 04-01-2020


Location: San Pedro de los milagros Fault: Phase(Normalized)
Engineer: Carlos A. Morales