CW1-Core -1 check

The marked area require additional reinforcement at bottom than provided. The required R/F area is
about 700 mm2 to 1800 mm2 extra. This is checked with LLR 40% reduction.
If we add additional 2 m x 8 m x 500 mm raft above existing 1m raft then the requirement of the
reinforcement is 300mm2 to 1200mm2.
Reinforcement of SW1 at B2 to B1

Provided Pt-1.08- 112-T20

Required- 1.16- 14 t25+98 T20

Size =6500 x 500

Can we allow this increase in percentage? SW1 is connected with RW of same thickness from B2 to B1.

Also, if we increase length of sw1 by 350 in RCDC then it is safe with 112-T20 bars.

--All other walls/columns are Okay as conveyed by manoj. I need to check them.