Atikokan Generating Station

Biomass Conversion Project Update


WPAC November 19, 2013

Brent Boyko
Director Biomass Business Development
Official Launch – Oct. 10, 2012

2 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Atikokan Generating Station
 Atikokan Generating Station (GS) is one
of two plants in OPG’s Northwest
Thermal operations.

 Located about 200 km west of Thunder


Bay, Ontario.

 Built in 1985, the Station has one


generating unit with the capacity to
produce just over 200 MW of electricity.

 At the mid point of a major biomass (wood pellets) conversion project.

 Extensive community and Aboriginal stakeholder outreach.

 Expected to be in service in mid 2014.


3 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Biomass Conversion Project - Facts

 New fuel handling and


storage system to ensure Atikokan Generating Station
safety.

 Modifications to furnace
and new Distributed
Controls System.

 10,000 tonnes of wood


pellets storage - two
5,000 tonnes silos.

 New truck receiving and


transfer house.

4 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Construction Design Strategy

 Receiving strategy: truck only.

 Storage: Silos (bulk) and Modified Bunkers (surge).

 Fuel Processing.

 Primary Air Cooler.

 Burner Replacement.

 Modification of Ash Handling.

5 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Receiving Strategy

 Truck delivery of pellets - 200 km radius.

 10 trucks/day, 35 tonne/truck, 5 days/week,


self-unloading.

 One unloader system on


to belt feeding storage.

 15 minutes unload time.

 Rejection capabilities.

 Capable of direct feed


from truck unloading
bypassing silos.

6 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Safety By Design
Dust Control

Explosion Panels

Spiral Chute

Belt Conveyor
from Silos Silo Discharge

7 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Storage

 Spiral chute reduces fuel drop.

 Gravity feed to unloading system (hopper bottom).

 Multi-level and location temperature monitoring and trending


of the storage silos.

 Aeration capability on the silos.

 Inert gas injection capability on the silos.

 Recycling/recirculation capabilities to cool pellets and reuse.

 Explosion panels.

8 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Storage … continued

9 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Fuel Processing
 Replace existing in-plant bunkers (750 tonnes capacity each) with
surge bins (45 tonnes each) to reduce the quantity of in-plant fuel.

 Ports on the surge bins to allow for injection of fire fighting media.

 Isolation valves above and below the mills to prevent migration of


any event.

 Modified Pulverizers to increase velocity and reduce classification.

 MPS 75 mills conducive to pellet grinding.

 Modifications proposed by Hitachi are field-tested (AmerCentrale –


Netherlands).

 AmerCentrale – 75% Biomass since 2011.

10 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Fuel Processing … continued

11 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Fuel Processing … continued

 Classifier Full Open:


– Pellets break into constituent particles on first pass.
– Mill testing and field experience shows that no
classification is required.

 Grinding Roller Track:


– No modifications
required.
– Grinding is not expected
to result in any
significant particle size
reduction.

12 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Fuel Processing … continued
 Nozzle Ring:
– Install 2 remaining rotating throats (3 mills already converted).

– Test trials at Atikokan showed lower mill pressure differential


on mills equipped with rotating throats (efficiency).

– Optimises the primary air conduction (air distribution between


the operating mills).

• Explosion Suppression:
– On the surge bins and mills.

– Dry chemical suppression system.

– Fully Automated.

– Installed on the mill and Pulverized Fuel Lines.


13 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Primary Air Cooler

 Include PA Cooler to temper the PA to required temperature and


avoid pre-ignition of fuel.

 Main difference is low moisture content of wood versus coal.

 Reduces heat losses


and avoids back-end
expansion problems.

 Improved efficiency
via heat transfer to
feedwater system.

14 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Burner Replacement
 New Doosan modified Mark III burners
being installed.

 Based on operating experience of


Mark III burners used in European
Biomass conversions.

 Full use of existing Gas Recirculation


Fan to achieve steam temperatures.

 Includes new Class I igniters and


flame scanners.

 No changes to boiler openings.

15 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Modification of Ash Handling

 New Drag-Chain conveyors to replace pneumatic conveying


system (fire prevention).

 Aggressive rapping strategy.

 Continuous evacuation of collection hoppers.

 Eliminate air in-leakage to reduce O2 (fire prevention).

16 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Health & Safety

VISION: Sustained Excellence in Health and Safety

 Conducted a third-party industrial hygiene study that


assessed hazards associated with handling wood dusts.

 Developing new housekeeping standard.

 Benchmarking industry best practices around wood pellet


inventory management and silo fire prevention and
management.

 Use of safe job planning tools and site Passport to Safety.

 Management field visibility. Conduct regular field visits.

17 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Health & Safety … continued

 Fire and Explosion Risk

• Regular cleaning of horizontal surfaces and conveyor systems


to prevent the accumulation of settled dust.
• Monitor temperature in storage to take appropriate action if
self-heating or auto ignition.
• Protect wood pellets from sources of heat and flame.
• Hot work permits with fire safety/suppression measures
required for all hot work.

 Worker Exposure Risk

• Maintain exposures below occupational limits (dust and off-


gassing products).
• Personal and area air monitoring to determine exposure
profiles and confirm adequacy of control methods.
18 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Atikokan GS Biomass Project
July 2012

19 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Truck Receiving & Transfer Tower
Oct. / Nov. 2012

20 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Project coming together – Dec. 2012

21 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Mar. 2013

22 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Transfer Tower & Silos – Apr. 2013

23 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Silos – May 2013

24 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Silos – May 2013

25 A G S B i o m a s s C o n v e r s i o n P r o j e c t
One of 15 new burners

26 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Surge Bin Modifications

27 P r e s e n t a t i o n T i t l e
Controls Console Demolition /
Replacement

28 A G S B i o m a s s C o n v e r s i o n P r o j e c t
June 2013

29 A G S B i o m a s s C o n v e r s i o n P r o j e c t
August 2013

30 A G S B i o m a s s C o n v e r s i o n P r o j e c t
August 2013

31 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Conveyor Gallery Lift in Progress -
August 2013

32 A G S B i o m a s s C o n v e r s i o n P r o j e c t
August 2013

33 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Dust Suppression / Vacuum System –
Sept. 2013

34 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Controls /Control Room
Commissioning Kick Off

35 A G S B i o m a s s C o n v e r s i o n P r o j e c t
Inside the Silo
Material Handling
 Silo bin bottom (51,000
cinder blocks)
 Installed West Silo Stair
Tower
 Electrical / mechanical
continues on transfer tower
Fuel & Combustion
 PA Cooler & Burners
Installed
 ash conveyors in place,
ready for “long drop chute”
 Electrical work underway
 Pulverizer mods completed
Controls Installation
 Installation tasks continued
 Final 1st Fire terminations
36
underway
A G S B i o m a s s C o n v e r s i o n P r o j e c t
Silo Cone

37 P r e s e n t a t i o n T i t l e
Burners Installed

38 P r e s e n t a t i o n T i t l e
First Fire - October 2013

39 P r e s e n t a t i o n T i t l e
Thank You!

40 P r e s e n t a t i o n T i t l e
Questions

Brent Boyko
Director of Business Development
Atikokan Generating Station
807-597-3522
Brent.boyko@opg.com