SASEC PORT ACCESS ELEVATED HIGHWAY PROJECT

PROCUREMENT OF CIVIL WORKS FOR PORT ACCESS ELEVATED HIGHWAY


CONTRACT NO: RDA/ADB/OCB/PAEH/CW/01

ADDENDUM NO. 3
In accordance with clause 8.1 of the Instructions to Bidders, the following modifications to the Bidding Document
effects.

01. PART II
Section 6 – Employer’s Requirements, Section 6.1 – Scope of Works, 6.1.1 Introduction, page 6-4

Replace the parts as follows,

“Part 1: from 0+400 – 1+750 km.”


“Part 2: from 1+850 – 3+400 km.”
“Part 2A: from 1+750 - 1+850 km.”
“Part 3: from 4+200 – 5+270 less 4+870 – 4+900km”
“Part 4: from 0+000 – 0+400km.”
“Part 5: from 3+400 – 4+200 km and 4+870 – 4+900 km.”

02. PART III


Section 8 – Particular Conditions of Contract, Part A – Appendix to Tender

Clause 1.1.5.6, Page 8-2:

Replace the Section A, B, C, D and E with following,

Section A
“First phase of ground level road construction of Part 1 (0+400 – 1+750) and Part 3 (4+200 - 5+270 less
4+870 – 4+900)”

Section B
“Construction of Elevated structure of Part 1 (0+400 – 1+750) and first phase of ground level road construction
of Part 2 (1+850 – 3+400) and Part 2A (1+750 – 1+850)”

Section C
“Construction of Elevated structure of Part 3 (4+200 – 5+270 less 4+870 – 4+900 km)”

Section D
“Construction of Elevated structure of Part 2 (1+850 – 3+400) and Part 2A (1+750 – 1+850)
And second phase of ground level road construction of Part 1 (0+400 – 1+750), Part 2A (1+750 – 1+850)

Section E
“First phase of ground level road construction of Part 4 (0+000 – 0+400)”
Construction of Elevated structure of Part 4 (0+000 – 0+400km) and Part 5 (3+400 – 4+200 and 4+870 –
4+900) and Second phase of ground level road construction of Part 2, Part 3, Part 4 and Part 5, and finishing
all the assigned and ancillary works for Part 1, Part 2, Part 2A, Part 3, Part 4 and Part 5”
03. PART III
Section 8 – Particular Conditions of Contract, Part A – Appendix to Tender
Clause 1.1.5.6, Page 8-3,

Replace the Parts as follows,


“Part 1 0+400 – 1+750 km.”
“Part 2 1+850 – 3+400 km.”
“Part 2A 1+750 - 1+850 km.”
“Part 3 4+200 – 5+270 less 4+870 – 4+900km.”
“Part 4 0+000 – 0+400km.”
“Part 5 3+400 – 4+200 km and 4+870 – 4+900 km.”

04. PART III


Section 8 – Particular Conditions of Contract, Part A – Appendix to Tender

Clause 2.1, Page 8-3

Replace the Stage 1 and Stage 2 with the following,

“Stage 1 - Part 1, Part 2, Part 3 and Part 2A within 14 days from issue of Letter of Acceptance”

“Stage 2 - Part 5 and Part 4 within 24 months from Commencement Date”

“Delete the Stage 3 –


“Stage 3 - Part 5 within 24 months from Commencement Date”

05. PART II
Section 6 – Employer’s Requirements, Section 6.1 – Scope of Works, 6.1.2 Scope of Works, page 6-8,
Paragraph 26

Replace the wording “traffic monitoring CCTV cameras” with “poles for fixing monitoring cameras”

06. PART II

Section 6 – Employer’s Requirements, Section 6.1 – Scope of Works, 6.1.2 Scope of Works, page 6-9,

Add the following with paragraph 28, “Toll facility gantries shall be constructed by the PAEHP Contractor.
The sample gantry arrangement only for contractor’s reference is attached as Annex 18. The PAEHP
Contractor shall design the gantry to suit the PAEHP. The number of location for gantry will be one”

07. Part II
Section 6 – Employer’s Requirements,

“Add” attached “Alignment Layout of Port Access Elevated Highway - Drawings” with Annex No. 5.
08. Part II
Section 6 – Employer’s Requirements, Section 6.1 – Scope of Works, 6.1.3 Annexes to Scope of Works, page
6-14,

“Add” the following after last row of the table,


Annex No. 18 Sample Gantry Details

09. PART II
Section 6- Employers Requirements (ER):
“Add” the attached drawing as Annex No. 18, attached as “Annex 18 - Sample Gantry Details”