The time elapsed from the point the machine fails to perform its function to the point it is
repaired and brought into operating condition is known as
(A) Down time
(B) Compromise
(C) Bridge
(D) In
9-The ____ goes on increasing with the increase in degree of maintenance efforts.
(A) Cost of down time
(B) Decreases
15-Total Productive maintenance (TPM) approach has the potential of providing almost a
seamless integration between
(A) Production and Quality
ANSWERS:
1-(D), 2-(C), 3-(D), 4-(B), 5-(A), 6-(D), 7-(B), 8-(D), 9-(C), 10-(B), 11-(A), 12-(A), 13-(B), 14-(C),
15-(C)
When applying failure mode and effect analysis (FMEA), the one
overriding factor is the potential for the occurrence of failure.
False
Your
Answer:
Preventive
maintenance
Your (PM)
Answer:
5%
Your
Answer:
4. Continually monitoring
performance for signs of need
of maintenance is known as:
Condition-
based
Your maintenance
Answer: (CBM)
Those
that have
Your Answer: their
source
inside the
operation.
Correct Those
Answer: that are
caused by
over-
promising
in product
or service
marketing
.
Two million to
one
Your
Answer:
True
Your Answer:
Correct False
Answer:
People errors
Your
Answer:
People
errors
Your Answer:
Correct Supplier
Answer: errors
False
Your
Answer:
The fault of
the customer,
Your but it is the
Answer: responsibility
of the
organisation
to educate
them to
ensure
failures do
not occur.
10%
Your Answer:
Correct 2.5%
Answer:
.855
Your Answer:
Correct .805
Answer:
Availabilit
y
Your Answer:
Correct Failure
Answer: rate
The failure
rate
Your
Answer: