You are on page 1of 8

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/237345217

Economic Analysis and Application of Small Micro/Hydro Power Plants

Article · April 2009


DOI: 10.24084/repqj07.254

CITATIONS READS
3 3,572

1 author:

Sarala Prafulla Adhau


Yeshwantrao Chavan College of Engineering
12 PUBLICATIONS   100 CITATIONS   

SEE PROFILE

All content following this page was uploaded by Sarala Prafulla Adhau on 15 April 2015.

The user has requested enhancement of the downloaded file.


International Conference on Renewable Energies and Power
Quality (ICREPQ’09)
European Association for the
Development of Renewable Energies, Valencia (Spain), 15th to 17th April, 2009
Environment and Power Quality

Economic Analysis and Application of Small Micro/Hydro Power Plants


Mrs. Sarala P. Adhau1

e
ar
1
Department of Electrical Engineering
Y.C.C.E., Nagpur University

ftw
Hingna Road, Wanadongri, Nagpur (India)

Phone/Fax number: + 91 9923106766/+91 9422127122, e-mail: adhau_sp@yahoo.co.in

So
un
Abstract. This paper aims an objective to study Economic
G
overall energy picture of the world. These are the clean,
ad
Analysis of Mini hydel schemes. This study facilitates to take pollution free, eco-friendly energy sources. With the
effective measures for reducing the cost which are also given. advancement of technology it is possible to harness
Analysis of two mini hydel schemes, Bhimgarh small hydel and
ro

hydro electric power efficiently with heads as low as 2


Chargaon-Jatlapur Mini hydel project in India, constructed on meters [7]. An approach by which multiple micro scale
dam toe and canal fall respectively is given. Parameters like
hydro generating units can be planned over a catchment
B

cost of Civil work, by pass canal, intake structure and cross


regulation has been worked out. Cost benefit ratio and Annual area consisting of several potential installation sites so as
return is calculated. Estimate for electrical and mechanical to extract the maximum possible energy per unit
by

equipments is prepared. The constraints and problems arising in investment cost has already been given. [2]. As per
development of power hydel schemes are known. Comparing present power crisis small hydro, non-conventional plants
with other alternative sources of energy, economics of Non- may be planned to work during peak demand. Integrated
ne

Conventional energy schemes is given. Because of limited generation and distribution for rural area on fuel
availability of coal and other fossil fuels and for total upliftment availability, small hydro capacity on run-off the river
of country, growth of remote places is must. Whereas to shall improve the availability and reduce energy cost.
hi

transmit power to such places is very costly. This gives rise to


Pico-hydro Plant that does not require construction of dams and
Mini hydel schemes can be constructed on dam-toe, canal
considered as run off river. Hence, simplified model has been drops, and return canals of thermal power stations and
ac

demonstrated and working is been explained. The output has also in the flowing small river as well as small revolute
been tested and usefulness of research is highlighted. which are flowing usually nearby villages. Area required
for the construction work is small as canal already exists.
fM

It requires very small gestation period and such power


Key Words
stations can be ready for generation within 3 years, in
pd

contrast to the large hydro schemes. Small hydro power


Comparison, Economic Analysis, Financial aspects, plants are usually upto capacity of 15MW whereas mini
Measures, Model. hydro plants are above 100KW but below 1MW either
stand-alone scheme or more often feeding into the grid.
1. Introduction Micro hydro plants ranging from a few hundred Watts for
battery charging or food processing application upto
The bulk of our energy comes from coal, oil, and natural 100KW usually provided power for small community or
gas exhaustible resources that create pollution when rural industry in remote area away from the grid. Micro
burned and contribute to global warming. Renewable Hydro Power Schemes are already been constructed at
energy (RE) is non-polluting energy that comes from the deserted weir and contribution to approaching to
inexhaustible resources, such as wind, sunshine, and Directive EU for renewable energy sources has already
falling water. Due to increasing global interest on been done [3]. The objective of this paper is to present
conservation of environment, distributed generation of one of the major criteria which is cost that gives rise to
power is gaining attention. They do not encounter the economic analysis which has been done suggesting some
problems of population displacement and can improve measures to be taken to reduce the cost. Comparison with
other Non-Conventional energy sources based on
parameters of Site selection, Grid connection problems, This period is sensitive to inflation rates, interest rates on
operation, maintenance & control problem, economic borrowed capital and tariffs applied. Over the trading
consideration and impact on environment are also period the revenue and expenditure may be increased, to
presented. Cost benefit ratio and Annual return is also take account of inflation, but in later years the actual
calculated. Hydrological information is obtained from the sums of money may become difficult to relate to the
meteorology or irrigation department usually run by the present value on which basis the investment capital may
national government. This data gives a good overall be issued. For this reason, present worth, Net present
picture of annual rain patterns and likely fluctuations in value or discount cash flow methods are often employed.
precipitation and, therefore, flow patterns. The site The capital costs are minimized and revenue from energy
survey gives more detailed information of the site produced is maximized. The intake, penstock and
conditions to allow power calculation to be done and discharge pipe work at water treatment works may
design work to begin. Flow data should be gathered over already exists which reduces the capital cost of the

e
a period of at least one full year where possible, so as to scheme. To maximize the revenue from energy cells, the

ar
ascertain the fluctuation in river flow over the various plants should be operated at maximum capacity for the
seasons. The constraints and problems arising in longest possible periods of time, commanding the highest

ftw
development of power hydel schemes are known. As tariff for energy produced and sold to REC. The study is
there is limited availability of coal and other fossil fuels, done keeping in view the above facts.
hence for total upliftment of country, growth of remote
places is must. But to transmit power to such remote 3. Financial aspects of Micro Hydro Plants

So
places is very costly, which gives rise to Pico-hydro
power plants that does not require construction of dams Madhya Pradesh is one of the states in India, which has
and hence considered as run-off-river. The designed good potential for mini/micro hydel power development.

un
discharge is constant for canal drop project. But for run- This power can be developed through Irrigation canals,
off river project there are considerable changes in the Dam toe, return canals of thermal power stations etc.
discharge available as the river flow is seasonal. During The details of the both plants are given in Table I.

G
dry season, the flow rate is so slow, that existing stand-by Bhimgarh is a small hydro power station which is
(diesel generator) unit would have to be used to situated on Dam Toe with capacity of (2 X 1200 KW)
ad
supplement the available generation. But during wet whereas Chargaon Jatlapur is a mini power Station
period, flood occurs on the river as it is uncontrolled. The situated on Canal fall with capacity (1 X 800KW).
maximum water level below the falls, during the record
ro

flood is used as a reference to find standard project flood TABLE I


protection equipment. As a cheap, renewable source of COMPARISONS OF PLANTS AT THREE DIFFERENT SITE CONDITIONS
B

energy with negligible environmental impacts, micro- BASED ON DIFFERENT PAREMETERS


hydro power technologies have an important role to play
by

in future energy supply, particularly in developing Parameters Dam-Toe Irrigation Canal


countries. It is an attractive alternative to diesel (Bhimgarh) (Chargaon)
Turbine Type S-type full Kaplan Tubular (Semi -
technologies in rural and remote areas of developing
Kaplan)
countries as a means of achieving rural electrification. A
ne

Head and 10metre head, 18 12metre head,


demonstrating model with turbine, generator and discharge of cumecs discharge 8cumecs
mechanical coupling as major equipment has been Turbine discharge
hi

prepared and its working is explained. The output of the Generator Synchronous Synchronous
model has been tested. The demonstration model details 1200 KW, 3.3KV, 800 KW,
ac

promoting the incremental energy that can be supplied by 0.8p.f. 50 Hz 0.415KV, 0.8p.f.
hydro power can become a boon for local people in 50Hz
combination with other small scale local sources. With Switchyard 1500 KVA, 3.3 1500 KVA,
fM

these analysis results and suggestions new technologies Specification KV/ 0.415 KV/ 33
can be developed so that overall cost will reduce, 33 KV KV
Power House 13 x 9 x 7.472 7.48 x 4.3 x
efficiency will increase, and such schemes will be
pd

Dimensions cubic metre 6.297 cubic


attractive especially for stand alone applications. It can metre
help to conserve the conventional energy sources like Average Annual 8.6108 MU 3.3116 MU
coal/oil and such others. This economic analysis and energy
demonstration model can be good reference for those generation
who are beginners in this area so that with these studies, Operating hours 106270 units in 205411 units in
they will get further insight in this very important area and units noted 1260.16 hours 940.85 hours
worldwide.
The above studies are summarized and financial aspects
are studied on two projects as given in Table II which are
2. Economic evolution on different site conditions [5], [6].
The preliminary expenditure includes expenditure
The most straight forward method of computing the incurred on previous investigation, detail survey for final
economic virtue of investment in mini hydro plant is to location, geological and geophysical survey, availability
consider the payback period in years that the net revenue of construction of access road, appointment of consultant
from the plant will take to recover the capital invested. including charges for preliminary design work or
devices, preliminary soil testing, preliminary expenditure The net energy generation after deduction of 1%
for Bhimgarh is 1.752 Lacs and for Chargaon is Rs. 1.25 Transmission losses and friction losses work out to
Lacs. 3.3116 MKWH. Hence cost per unit generation work out
to 93.0 paisa per unit.
TABLE II
COMPARISON OF DIFFERENET FINANCIAL PARAMETERS
B. Measures to reduce the costs
Parameters Bhimgarh Chargaon
(Dam Toe) ( Canal fall) Some measures are proposed to reduce the cost
(2X1200 KW) (1X 800 Kw) 1. The number of units should be limited to 2-3 to save
Capital outlay on E and 366.56 Lacs 148.25 Lacs the cost of Civil Engineering, cost of building, cost of
M equipments. Hydro-Mechanical equipments, duplication of control

e
Estimated Cost of Civil 123.00 Lacs 120.73 Lacs
system, cabling etc.

ar
Works
2. Instead of going for full Kaplan one can use semi
Total Outlay of Project 489.56 Lacs 268.98 Lacs
O and M charges at 1% 4.895 Lacs 2.69 Lacs
Kaplan where guide vanes are fixed and variation in

ftw
of total capital water is obtained from runner blade operation. So simpler
Annual Depreciation 11.197 Lacs 6.594 Lacs version of water level controllers can be used.
Interest charges @8% 39.164 Lacs 21.518 Lacs 3. There is ample scope for reducing Civil Engineering

So
of capital cost by minimizing the dimensions of Power House by
Total Annual fixed 55.256 Lacs 30.802 Lacs minimizing the dimensions of Power house, control
charges panels, panels for instrumentation and protection can be
Energy generation 8.6978 MKWH 3.345 MKWH accommodated in mezzanine floor to minimize the span

un
Transmission Loss @ 0.0869 MKWH 0.0334 of Power House. Layout can be simplified and the entire
1% to be deducted MKWH generating station in semi-underground arrangement
Total Energy 8.6108 MKWH 3.3116

G
should be done.
Generation per annum MKWH
4. Sizing should be prudently decided with subsystems to
Cost of Generation 64.17 paisa/unit 93.0
ad
paisa/unit
reduce to a minimum to make the scheme economical.
Cost of Installation 20398.33 33622.5 5. Induction Generator are economical than Synchronous
Generators with associated subsystems.
ro

Rs/KW Rs/KW
6. Standardization of Hydraulic Turbine with objective of
reducing cost is important. A limited number of machine
B

Miscellaneous Expenditure includes Electrification in


colony, water supply purification and distribution, sizes to cover a range of application are desirable. This
sewerage disposal and storm water drainage work and means that such standard machine do not always
by

internal roads, maintenance and service of equipments, precisely match site requirements which is a greater or
technical records, and preparation of project report, lesser capacity than desired may be available. Simple
publicity information, transportation and Inspection design with standard size and parts to reduce production
ne

vehicle. For Dam toe type development, the cost of cost and time of delivery. Turbines can be standardized
generation as well as cost of installation is less as by considering possible widespread production of
compared to canal fall development. So the percentage components and service [4].
hi

returns for Dam toe is more and the pay back period is 7. Manufacturers of Hydro-Mechanical equipments
less. should continue standardizing the equipments.
ac

8. Elimination of guide vanes and adoption of electronic


A. Cost benefit ratio and Annual Return load controller devices may reduce the cost.
fM

9. Harnessing low head falls in irrigation system is


Percentage return for Bhimgarh is calculated as 15.18% desirable by standardize design as source of energy.
while considering 1.05 Rs. / unit as revenue rate. The net 9. Special subsidy and liberal term loan if given to
pd

energy generation after deduction of 1% Transmission explore Micro Hydro Plant (MHP) generation, it will be
losses and friction losses worked out to be 8.6108
highly economical for rural industry and remote areas.
MKWH. For Chargaon the percentage return is
calculated as 9.55% while considering rupees 1.05
C. Reduction in time and civil work consideration
revenue rate. The break even period for project is 9 years
and total cost of the project is wiped out in 32 years. The
Annual fixed charge consists of the four heads as below. The cost of civil construction and time can be reduced as
a) Operation and maintenance charges as 1% of total given below.
cost. a) Installation of prepackaged Turbine, pre assembled at
b) Annual depreciation calculated as per Indian the workshop to reduce time and cost of assembly at site.
Electricity Act, 1948. b) Use of siphons penstocks.
c) Interest rate @ 8% of total cost and c) Use of machines designed to withstand full run away
d) 0.5% generation reserves fund on total cost. speeds continuously to reduce the cost of safety devices.
The Annual total cost fixed charge worked out to Rupees d) Adoption of low specific speed machine to enable
30.802 Lacs. higher setting above tail water level and thereby reducing
the excavation, civil work cost and erection time. systems can be analyzed by traditional present value
e) Reduction in spillway capacity by using turbines in analysis because of their capital intensity and long life. It
sluicing mode. is required that all expenditure and income be recorded at
their point of occurrence in time. Present value is given
D. Protection and Control by (1).

Small hydro plant controls are required for unit start, unit n Qt
shut down, unit synchronizing, unit loading and control, P= ∑ (1)
electrical and mechanical protection, emergency shut t = 1 (1 + r )t
down etc.
Low cost automation is important for many hydel
Where, Qt = Expenditure in period t

e
schemes. Unit starting and synchronizing can be manual.
But emergency shut down must be full proof to avoid r = rate of discount.

ar
damage. Control of induction generators grid connected All the cost and prices may vary over time. The best
unit is easy synchronization. Speed and voltage control starting point is always to leave inflation out of the

ftw
are automatically taken care of. Generators are less in picture so that the real rate of interest can be used as a
cost. Automation costs are very low. Large scale discount factor.
installation of these units on existing irrigation canals can

So
be highly economical. G. Economics of Grid connected systems.
In isolated areas local grids can be formed and smaller
units can be induction generator type and can be We assume that in the grid, demand and supply are

un
controlled from a manned control mini hydro station balanced originally. When the renewable energy sources
where the synchronous generators are installed. are made available additionally whenever it flows, some
of the conventional generators have to be reduced. In this

G
E. Hybrid system development and Utilization for better way they will automatically serve the back up function
economy. for the capital renewable energy sources. The system
ad
cost, before renewable energy is made available
A major cause of low productivity and very low benefit comprises capital cost, fuel cost, Operation and
ro

cost ratios of isolated small hydro plants has been the maintenance cost. If renewable energy sources are added,
very low utilization of power generated from the flowing the system cost will be increased by the capital cost and
the operation and maintenance cost of the renewable
B

water. Hybrid development of mini hydel in integration


with other renewable and decentralized integrated energy energy generator. On the other hand, some of the fuel
systems is very promising and could meet our entire rural cost of the conventional generators will be reduced.
by

energy demands. Hydel energy can hybridized with solar


and bio mass energy which is other renewable energy H. Environmental cost
sources available in rural area to produce value added
ne

commodities like gases and liquid fuels, fertilizers and Environmental damages from the use of conventional
food processing system rural material based industries sources of energy should be included in a proper
hi

such as soap, insecticides and oil extraction system etc. economic evaluation of the cost and benefits of energy
systems. Empirical evidence on the cost of environment
ac

F. Economics of stand alone system. damage is difficult in attributing damages to a specific


source, time problem and the problem of valuing factors
Non conventional energy sources without a capacity for which there are no market crisis. All such factors are
fM

feature in a stand alone system will require a back up of difficult to measure. The price for environment thus
some sort if the service required is time dependent [8]. expresses that it is not available in unlimited amounts.
pd

This will increase the cost of system. So from economic Setting a price for the environment implies limiting
reasoning, it seems that alternative sources of this type in quantitative use for environmental factors. This effect is
stand alone system are best suited for services where time brought about by a cost of reduction in the capital cost
does not play a crucial role. In order to bring down the for Renewable energy sources. This is very important for
cost of alternative energy generation, some back up the design of system of subsidy for Renewable energy
systems, which can take over some of the loads at the sources. Any system of promoting renewable energy
time when alternate sources does not flow adequately should give incentives to reduce the cost of production
could be brought in. The capacity of the source could be for the capital equipment required.
determined by minimum load required by the demand
site so that alternative sources would be responsible for I. Energy/Economy Interaction
rest. In stand alone system, the back up ratio should be
100% as the back up is necessary to assure the system Energy/ Economy Interaction models are designed to
against zero flow situations. Thus the back up cost is analyze the effects/ changes in the economy environment
generally very high. It is possible to reduce the cost by on the whole economy. Environmental restructuring of
integrating some kind of storage in the system. Energy the economy is basically a problem of all those sectors
that have high demand for energy. Renewable energy available varies over a large range of turbine speed also
constitutes a very small fraction of energy supply and varies in a highly non linear manner.
thus also of economic value connected to energy. In these 3. Operation, Maintenance and Control Problems:
models, there is no difference between renewable energy Operation of MHP is smooth, maintenance free and easy
and other energies regarding their economy impact. to operate whereas for wind power station there is
problem of noise pollution, teething troubles, poor
J. Constraints and problem in development of mini hydel performance due to O and M problems. The development
schemes of appropriate instrumentation for signal conditioner,
computer interfacing mechanism and software for
The major constraints and problems in the development different aspects of system operation is a major
of mini / micro hydro power plants on irrigation work are challenge. The major problem noticed in wave energy

e
enumerated below. was the pulsed pattern of input power with regular
a) High capital cost of generating equipments and civil periodicity as the sea wave. Problems related to Biogas

ar
works. are handling of effluent slurry, gas forming
b) Equipments availability especially in ultra low head methanogenic bacteria, accumulation of volatile fatty

ftw
range. acids and drop in Ph and failure of digester, leakage of
c) High cost of control especially for governing and gas from gas holder.
speed regulation. 4. Economic Consideration: Table III gives rough

So
d) High cost of operation and management. impression of relative costs among energy alternatives.
e) Unstable operation of isolated system due to low 5. Impact on Environment: Wind, Solar, and MHP are
inertia. clean, pollution free, environment friendly sources. But

un
f) Low utilization (load) factor. WECS create noise pollution. MHP does not disturb the
Improvement of technical and economics viability of low ecological balance and also regime of rivers. Biomass
head small hydro requires reduction of capital and energy stations are not very clean and they have to meet

G
maintenance costs of equipment. Some pertinent factors the stringent standards of pollution control regulation.
in this regard are Standardization, speed regulation, However, under the surroundings, the extra expanded
ad
development of pre packaged and pre assembled unit, capacity has been already studied and the energy
development of micro processor based controls for structure has been adjusted to promote the renewable
ro

unattended operation and remote control and technology wind and small hydro energy instead of low efficient
development for tapping ultra low head or flowing water generation [8].
B

energy.
K. Comparison with other Non-Conventional Energy TABLE III
by

Sources RELATIVE COSTS AMONG ENERGY ALTERNATIVES

MHP are compared with other non-conventional energy Name of Plant Investment Fuel cost Power cost
ne

sources based on following Parameters: Cost US $ US cent US cent per


1. Site Selection: MHP are to be situated in hilly areas per KW per KW KWh
Micro Hydro 1500 None 5.0
where there are natural falls, on the canal drops or at the
hi

Diesel 800 11.0 13.2


dam-toe, long range studies are not required for such site
Steam Coal fired 1000 2.7 5.2
selection. Wind energy conversion system should be
ac

Steam Oil fired 800 5.5 7.5


located preferably in the areas where the wind are strong Steam Wood fired 1500 5.0 10.0
and persistent, where daily wind flow is variable but Wind Energy 5000 - None 30 - 100
fM

monthly and annual average speed should be remarkably 15000


constant from year to year. Similarly energy harvesting Solar PV 20000-- None 100 - 300
by wave energy is very much site specific. Biomass
pd

including Storage 30000


Plants are situated considering the distance, minimum battery
gradient, open space, water table, and distance from
wells, space requirement, and availability of water and
material source for biogas generation. For solar energy, 4. Environmental Cost Benefit Calculations
the location should have large flat area free from trees
and tall buildings. Renewable energy sources help to reduce greenhouse gas
2. Grid connection Problems: In MHP input power is emissions and natural habitat disturbances associated
almost constant. Quantum of power fed to the grid with conventional energy production. These types of
remains constant in a season. Operation of grid connected energy sources have received increasing attention as
mini hydel station is smooth, but for other energy alternative means of meeting global energy demands
conversion systems, operation in grid connected mode while maintaining a healthy environment for future
faces many problems like production of harmonics, generations. Governments have recognized the
abnormalities in voltage and frequency etc. In wave environmental benefits of renewable, and provided
energy due to seasonal variations of sea waves, the power subsidies to stimulate their growth against the less costly
conventional energy sources, such as thermal and nuclear shows the Demonstrating Model developed and tested in
plants in electric power systems. The Clean Development Laboratory.
Mechanism (CDM) under the Kyoto Protocol to United
Nations Framework Convention on Climate Change
(UNFCCC) provides an opportunity for the Indian power
sector to earn revenue through the reduction of
greenhouse gas emissions (GHG), particularly carbon
dioxide (CO ). India has tremendous potential for CDM
2
projects. Power generation based on higher efficiency
technologies such as supercritical boiler technology,
integrated gasification combined cycle, and renovation

e
and modernization of old thermal power plants, co-

ar
generation along with renewable energy sources are some
of the potential candidates for CDM in the power sector.

ftw
Project developers wishing to benefit from the CDM
must use an approved methodology to quantify their
FIG. 2 FULL VIEW OF DEMONSTRATING MODEL
emission reductions.
Emission reductions from CDM projects in the power

So
The major equipments in the model are
sector can be calculated based on the net electricity 1. Turbine
generated by the project and the difference between the 2. Generator
emissions factors (CO /MWh) of the baseline and the 3. Mechanical Coupling.

un
2
project activity. The baseline emission factor reflects the Model Specification:
carbon intensity of the displaced amount of grid Turbine: 8 inch

G
electricity. This baseline emission factor can be derived Turbine Blades: 10
from the data provided in the CO Database [3]. Shaft (steel): 8mm Ø
ad
2
Baseline carbon dioxide emissions, developed by Central Magnet (Circular): 1.5 inch diameter
Electricity Authority would provide direction to help Winding wire gauge: No.37
Winding coil: Inner diameter 2 cm
ro

industry to come up with new CDM project concepts to


further consolidate and reinforce the efforts to save the : Outer diameter 3 cm
Bearing SKF: 608z
B

global environment.
Magnets and Winding disc (Acrylic disc): 5 inch
5. Demonstration Model diameter
by

Turbine input nozzle: 0.5 mm


There are villages in remote areas, far from one another 0.75 inch
and far away from urban centers. The power transmission Figure 3 gives a view of the Turbine used
ne

and distribution is not commercially viable. For such


villages, micro Hydro Power Plant is the right thing. For Working of the Model:
High Pressure water having sufficient head is allowed to
hi

the total upliftment of the country, growth of remote


places (especially villages) is a must. Micro-hydro run through the turbine blades resulting in its rotation. As
turbine is mechanically coupled with generator through a
ac

systems are particularly suitable as remote area power


supplies (RAPS) for rural and isolated communities, as Common shaft so that an electro motive force will be
an economically viable alternative to extending the induced in the coil. Thus rotation of turbine brings about
fM

electricity grid. However to transmit power to such the generation of electric power. The Model Output was
remote areas is very costly. This fact gives rise to a tested in Laboratory and Output was found to be 1.8V.
pd

special type of power plant, a Pico-hydro power plant. A


pico-hydro power plant is a plant whose generation
capacity is upto 3KW. The major difference between
high capacity and Pico-hydro plant is that the later does
not require any construction of dams and hence it is
considered as run-off-river plant.
In view of the above facts, the demonstration model is
developed which gives clear idea about working of MHP.
It has been developed with an objective to create
awareness about the present need in the rural areas. It is a
simplified, easy to operate and handle, very economically
developed model. Such models can be developed in large Fig. 3 Generator used in the Demonstrating Model
numbers by small educational institutes, organizations
and research centers and demonstrated in nearby rural There are very good future prospects for these Pico-
areas for implementation of MHP worldwide. Fig. 2 hydro plants. This type of development is very useful for
remote places where the cost of transmission will be very References
high.
[1] Miroljub D. Jevti, Development a micro hydro Power
6. Conclusion Scheme at the weir at Black Timok, Original scientific
paper UDC: 621.311.213 BIBLID: 0354-9836, 11 (2007),
4, pp 179-186.
Though it is observed that the Cost/ KW is high as [2] S.Roy, Optimal Planning of Generating Units over Micro
compared to Large Hydro Projects and Micro/Pico Hydro Hydro Resources within a Catchment area by, Senior
Plant supplies power to very limited locality, a village Member IEEE.
can have its own micro Hydro Power Plant (HPP). The [3] CO2Baseline Database for the Indian Power Sector, User
Panchayat can build, operate and maintain the HPP and Guide Draft, Version 1.0, Government of India, Ministry
of Power Central Electricity Authority Sewa Bhawan, R.K.
village houses can consume the electricity. The small Puran, New Delhi-66.

e
villages can become self reliant in power. If all the canal [4] M.P.Garg. Economics of Mini Hydro power,” Indian

ar
drops, small revolute are tapped effectively, most of the journal of power and river valley development, Sept-
power and low voltage problems can be removed in the Oct.1984, pp 435-439.

ftw
small villages. With these analysis results and [5] MPEB Technical Report on Bhimgarh hydro plant
suggestions new technologies can be developed so that [6] MPEB Technical Report on Chargaon hydro plant
[7] L.Cai, G.H. Cheng and Z.Xu, Member, IEEE. "Capacity
overall cost will reduce, efficiency will increase, and Expansion and restructuring with Intermittent Wind and

So
such schemes will be attractive especially for stand alone Small Hydro Energy," presented at the Conference
applications. Unlike PV or wind systems, hydro systems Transmission and Distribution , China, 2005.
generate electricity continuously, as long as the water is [8] W.Pfaffenberger, ‘ Modeling the economics of renewable
flowing, and will typically be the most cost-effective energy Projects’ SESI Journal 7, 1997, pp 1-15

un
renewable energy approach.

G
ad
ro
B
by
ne
hi
ac n
st
ts
a
fM
io
at
ic
bl
pu
ew
Vi
pd

You might also like