SUSPENDED CEILING MATCHED WITH CONTRACTOR) MARINA PLAZA, LEVEL 10
MIN.100
SUPPORT CEILING PAINT
SUSPENDED CEILING
SUPPORT
(AS PER PRODUCER) 15 FINISH COLOR) OFFICES 1004/1006, DUBAI UAE
(AS PER PRODUCER) 15 t +971 4 3825200
LIFT DOOR (AS PER
CONTRACTOR) P.O. BOX NO. 112955, DUBAI UAE
15 1515
www.perkinswill.com
PLASTERBOARD METAL PROFILE (AS
PLASTERBOARD (AS PER RCP PER CONTRACTOR)
MIN.150
PLASTERBOARD
(CEILING FINISH PLAN) FOR DETAIL IN STRUCTURE & MEP
AS PER RC PLAN
AS PER RC PLAN) GRILLE (AS PER MEP) TILE ON ADHESIVE GUESTROOM LIFT
(CEILING FINISH AS
AS PER RC PLAN
35 (85) 15
50 (100)
C LED STRIP
(AS PER LIGHTING PLAN)
AS PER RCP PLAN I61-04 C
(AS PER LIGHTING GOLD & DIAMOND PARK, BUILDING 4
PLAN) PLASTER
UNIT 130, SHEIKH ZAYED RD. DUBAI UAE
50
TILES ON RIGID INSULATION (AS PER
TILES ON t: +971 4 341 6686 P.O. BOX NO. 38349
50
ADHESIVE ADHESIVE ARCHITECTURAL DESIGN)
PLASTERBOARD PLASTERBOARD MR
(CEILING FINISH AS
PLASTERBOARD
(CEILING FINISH AS
PER RC PLAN) CORNER SUSPENDED CEILING
SUPPORT
CORNER PROTECTION
PROFILE (TO BE TAPED
RC SLAB (REFER TO
STRUCTURAL DRAWINGS) ARCHITECT OF RECORD
SUSPENDED CEILING PROTECTION
PER RC PLAN) CORNER PROTECTION (AS PER PRODUCER) AND SPACKLED)
SUPPORT PROFILE (TO BE
SUSPENDED CEILING PROFILE (TO BE TAPED
(AS PER PRODUCER) TAPED AND
SUPPORT AND SPACKLED)
SPACKLED)
(AS PER PRODUCER)
TYPICAL CEILING DETAIL - FACADE MULLION TYPICAL CEILING COVE DETAIL 01 - WET AREA TYPICAL CEILING COVE DETAIL 02 - WET AREA TYPICAL LIFT ENTRANCE DETAIL
1 1:5
2 1:5
3 1:5
4 1:5
ALBONIAN CONSULTANT ENGINEERS
25TH FLOOR JULPHAR TOWERS
NOTE: ALL APARTMENTS & APARTMENT CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF MASONRY WALL OR CONCRETE COLUMN CAN BE USED (AS PER DAFAN AL NAKHEEL, RAS AL KHAIMAH
ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC PLASTERBOARD LINING & SUPPORT CAN BE USED (AS PER DETAIL 7/I61-22) INSTEAD OF PLASTERBOARD LINING & SUPPORT t: +971 7 228 8641 P.O. BOX NO. 13085
REPORT). DETAIL 8/I61-22) INSTEAD OF MASONRY WALL OR CONCRETE
COLUMN SUPPORT (STRENGTHENING) FOR
CEILING HANGER
(AS PER
ALUMINUM
20-30
WRAPPED / MIRROR OR
BACKPAINTED GLASS ON
15 20-30
TIMBER / ACOUSTIC / FABRIC
WRAPPED / MIRROR OR HOTEL & RESORT
TRIM (COLOR PANELLING BACKPAINTED GLASS ON
PRODUCER) TO BE 30-20 30-20 PANELLING
MATCHED WITH MOUNTING
50 SUPPORT (AS PER MOUNTING
CEILING PAINT SUPPORT (AS PER
FINISH COLOR) CONTRACTOR)
CONTRACTOR)
ACCOUSTIC 15
INSULATION (AS PER
NOTE ABOVE)
MOUNTING SUPPORT (AS PER MOUNTING SUPPORT (AS PER
CONTRACTOR) CONTRACTOR)
10
10
PLASTERBOARD MR SHADOW GAP SHADOW GAP
TILE SKIRTING ON TIMBER SKIRTING ON
EQ
AS PER RCP PLAN
PLASTERBOARD ADHESIVE ADHESIVE
(AS PER RCP) GRILLE (AS PER MEP)
100
100
TILE ON ADHESIVE 35 15
RAK AMI HOTEL FZ LLC
CARPET ON ADHESIVE
AS PER RCP
35 15
DRYWALL (AS PER CEMENT SCREED CEMENT SCREED
AR/ID DESIGN) (SELF-LEVELED)
t: +971 07 2035004
35 (85) 15
35 (85) 15
50 (100)
50 (100)
www.almarjanisland.com
EQ
AS PER RCP PLAN
TYPICAL CEILING COVE DETAIL 01 TYPICAL CEILING COVE DETAIL 02 TYPICAL TILE SKIRTING & TIMBER PANELLING DETAIL TYPICAL TIMBER SKIRTING & WALL PANELLING DETAIL
5 1:5
6 1:5
7 1:5
8 1:5
B B
REFERENCE DRAWINGS
MASONRY OR CONCRETE WALL /
COLUMN CAN BE USED (AS PER DETAIL 1. GENERAL AND STANDARD DETAILS:- I00 SERIES.
7/I61-22) INSTEAD OF PLASTERBOARD 2. KEYPLANS:- I10 SERIES.
WALL (AS PER AR/ID DESIGN) MASONRY WALL (AS PER AR DESIGN) 3. PLANS & SECTIONAL ELEVATIONS:- I44 SERIES.
LINING & SUPPORT
4. JOINERY UNIT DETAILS:- I50 SERIES.
TIMBER BATTENS 5. WET AREAS:- I52 SERIES.
SUPPORT (STRENGTHENING) FOR ALUMINUM TRIM (COLOR TO BE ALUMINUM TRIM (COLOR TO BE MATCHED WITH
6. ID DETAILS:- I61 SERIES.
PANELLING (AS PER CONTRACTOR) MATCHED WITH CEILING PAINT FINISH CEILING PAINT FINISH COLOR) 7. DOOR AND PARTITIONS DETAILS:- I62 SERIES.
CEILING HANGER COLOR) WALL (AS PER AR DESIGN) 8. SCHEDULES:- I64 SERIES.
CEILING HANGER
(AS PER PRODUCER) (AS PER PRODUCER)
PLASTERBOARD LINING ON 30 20
SUBSTRUCTURE OR DRYWALL (AS CEILING HANGER
(AS PER PRODUCER) METAL SHEET ON MDF
PER ID DESIGN) BACKING (CONTROL SUSPENDED CEILING SUPPORT
PANEL AS PER (AS PER PRODUCER)
SUSPENDED CEILING
ALUMINUM TRIM
(COLOR TO BE MATCHED
SUPPORT
(AS PER PRODUCER)
CONTRACTOR)
PLASTERBOARD (CEILING KEYPLAN
WITH CEILING COLOR) FINISH AS PER RC PLAN)
MOUNTING
SUPPORT (AS PER
PLASTER
CONTRACTOR)
MIN.100
CURTAIN RAIL
SUPPORT (AS PER
AS PER RCP
SHADOW GAP
10
PLASTERBOARD CONTRACTOR)
(CEILING FINISH AS TILE SKIRTING ON
PER RC PLAN) 15 15 LED STRIP
ADHESIVE (AS PER LIGHTING
AS PER RCP
100
PLASTERBOARD 150 VARIES (AS PER RCP) (FF AS PER FFP) 150 AS PER RCP AS PER RCP
(CEILING TYPE & FINISH 35 15 CEMENT SCREED
LED STRIP CURTAIN RAIL
AS PER RC PLAN) (SELF-LEVELED)
(AS PER LIGHTING (AS PER PRODUCER)
35 (85) 15
50 (100)
SUSPENDED CEILING PLAN) CURTAIN
SUPPORT PLASTER
50
50
TYPICAL PANELLING CEILING DETAIL CEILING DETAIL - MIRROR & COVE SKIRTING & WALL DETAIL - LIFT CONTROL PANEL CEILING DETAIL - SPA RECEPTION
9 1:5
10 1:5
11 1:5
12 1:5
5
TITLE
25
150-250 (VARIES)
SUSPENDED CEILING LED STRIP
PLASTERBOARD (AS PER SUBSTRUCTURE
METAL PROFILE SUPPORT
(AS PER
AS PER RCP
(AS PER RCP) LIGHTING PLAN)
25
MEP)
50
TIMBER BATTENS
ON TIMBER
PLASTERBOARD CORNER PLASTERBOARD BOARD SHEET NUMBER
(AS PER RC PLAN) PROTECTION (CEILING FINISH AS
PROFILE (TO BE PER RC PLAN)
SUSPENDED CEILING TAPED AND SUSPENDED CEILING
SUPPORT SPACKLED)
I61-05
CORNER PROTECTION SUPPORT
(AS PER PRODUCER) PROFILE (TO BE TAPED CORNER PROTECTION
(AS PER PRODUCER)
FACADE CURTAIN WALL AND SPACKLED) PROFILE (TO BE TAPED
(AS PER ARCH. DESIGN) AND SPACKLED)
GUESTROOM CORRIDOR CEILING DETAIL - FACADE MULLION WALL FINISHING TRANSITION DETAIL - ADD TYPICAL CEILING COVE DETAIL - FACADE MULLION TYPICAL LIFT LOBBY CEILING COVE DETAIL
13 1:5
14 1:5
15 1:5
16 1:5