You are on page 1of 10

LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

1 1 m2 Pembuatan gudang material kerja


Bahan
1,70000 Btg Kayu dolken 8 / 10 cm panjang 4 meter @ Rp. = Rp -
0,21000 M³ Kayu klas 1 usuk ukuran 4/6 ; 5/7 panjang 2 meter @ Rp. = Rp -
0,30000 Kg Paku usuk kayu 7 cm @ Rp. = Rp -
10,50000 Kg Semen portland @ Rp. = Rp -
0,03000 M³ Pasir beton @ Rp. = Rp -
0,05000 M³ Koral beton 1-3 cm @ Rp. = Rp -
1,50000 Lbr Seng plat BJLS 30 diameter 90 cm @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
1,00000 Oh Pekerja @ Rp. = Rp -
2,00000 Oh Tukang Kayu @ Rp. = Rp -
0,20000 Oh Kepala Tukang @ Rp. = Rp -
0,05000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

2 1 m2 Pembersihan Lapangan dan Peralatan


Upah
0,10000 Oh Pekerja @ Rp. = Rp -
0,05000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

3 SEWA SCAFOLDING
2,00000 bh Main Frame 190 cm @ Rp. = Rp -
2,00000 bh Crose Brase 190 cm @ Rp. = Rp -
4,00000 bh Join Pint @ Rp. = Rp -
1 unit scafolding = 1x @ Rp. = Rp -

1,00000 bh Cat Walk = Rp -


4,00000 bh Roller Catter / roda = Rp -
Sub total : = Rp -

4 1 m3 Galian Untuk Tanah Biasa sedalam 2 m


Upah
0,52600 Oh Pekerja @ Rp. = Rp -
0,05200 Oh Mandor = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

5 1 m3 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps


Bahan
1,10000 m3 Batu belah ( 15/20 ) @ Rp. = Rp -
61,00000 Kg Semen portland @ Rp. = Rp -
0,14700 m3 Kapur pasang @ Rp. = Rp -
0,49200 m3 Pasir pasang @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
1,50000 Oh Pekerja @ Rp. = Rp -
0,60000 Oh Tukang batu @ Rp. = Rp -
0,06000 Oh Kepala tukang @ Rp. = Rp -
0,07500 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
6 1 Kg Pembesian dengan besi polos
Bahan
1,05000 Kg Besi beton @ Rp. = Rp -
0,01500 Kg Kawat beton @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
0,00700 Oh Pekerja @ Rp. = Rp -
0,00700 Oh Tukang besi @ Rp. = Rp -
0,00070 Oh Kepala tukang @ Rp. = Rp -
0,00030 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

7 1 unit angkur
Bahan
1,00000 bh angkur 19 pj 60 @ Rp. = Rp -
Sub total : = Rp -
Upah
0,00600 Oh Pekerja @ Rp. = Rp -
0,06000 Oh Tukang besi @ Rp. = Rp -
0,00600 Oh Kepala tukang @ Rp. = Rp -
0,00030 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

8 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr


Bahan
232,00000 Kg Semen portland @ Rp. = Rp -
0,52000 m3 Pasir beton @ Rp. = Rp -
0,87000 m3 Koral beton @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
1,65000 Oh Pekerja @ Rp. = Rp -
0,25000 Oh Tukang batu @ Rp. = Rp -
0,02500 Oh Kepala tukang @ Rp. = Rp -
0,08000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

9 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


Bahan
70,00000 Bh Bata merah 5 x 11 x 22 cm @ Rp. = Rp -
14,37000 Kg Semen portland @ Rp. = Rp -
0,04000 m3 Pasir pasang @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,32000 Oh Pekerja @ Rp. = Rp -
0,10000 Oh Tukang batu @ Rp. = Rp -
0,01000 Oh Kepala tukang @ Rp. = Rp -
0,01500 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

10 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm


Bahan
6,48000 Kg Semen portland @ Rp. = Rp -
0,01900 m3 Pasir pasang @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,20000 Oh Pekerja @ Rp. = Rp -
0,15000 Oh Tukang batu @ Rp. = Rp -
0,01500 Oh Kepala tukang @ Rp. = Rp -
0,01000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

11 1 Kg Pekerjaan Besi Baja


Bahan
1,10000 Kg Baja profil @ Rp. = Rp -
0,08000 kg Meni besi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,00600 Oh Pekerja @ Rp. = Rp -
0,06000 Oh Tukang besi @ Rp. = Rp -
0,00600 Oh Kepala tukang @ Rp. = Rp -
0,00030 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

12 1 m2 Pasang atap spandex


Bahan
1,10000 Lbr Spandek @ Rp. = Rp -
0,05000 Kg paku sekrup @ Rp. = Rp -
Sub total : = Rp -
Upah Dibulatkan = Rp -
0,10000 Oh Pekerja @ Rp. = Rp -
0,05000 Oh Tukang kayu @ Rp. = Rp -
0,00500 Oh Kepala tukang @ Rp. = Rp -
0,00500 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

13 1 m' Pasang talang datar, seng bjls 28


Bahan
0,50000 Lbr Seng plat 3' x 6' bjls 28 @ Rp. = Rp -
0,01500 Kg Paku biasa 1/2" - 1" @ Rp. = Rp -
0,25000 BtG hollow 40.40 @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,15000 Oh Pekerja @ Rp. = Rp -
0,40000 Oh Tukang kayu @ Rp. = Rp -
0,02500 Oh Kepala tukang @ Rp. = Rp -
0,00125 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

14 1 m2 Pasang lantaiGRANIT 60 x 60 cm
Bahan
1,05000 M2 GRANIT 60 x 60 Cm @ Rp. = Rp -
1,06250 Kg Semen portland @ Rp. = Rp -
0,00275 Kg Kapur bubuk @ Rp. = Rp -
0,04200 m3 Pasir pasang @ Rp. = Rp -
0,20000 Kg Semen warna @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,22000 Oh Pekerja @ Rp. = Rp -
0,10000 Oh Tukang batu @ Rp. = Rp -
0,01200 Oh Kepala tukang @ Rp. = Rp -
0,01250 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

15 1 M' Pasang Besi Hollow 100x50 mm Rangka Utama


1,10000 M1 Hollow 100x50mm @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

Upah 0,10400 Oh Pekerja @ Rp. = Rp -


0,10400 Oh Tukang besi @ Rp. = Rp -
0,00100 Oh Kepala tukang besi @ Rp. = Rp -
0,00005 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

16 1 m2 pasang kaca clear, tebal 10 mm


Bahan
1,10000 m2 Kaca clear 10 mm @ Rp. = Rp -
4,00000 m Karet penjepit kaca @ Rp. = Rp -
4,00000 m Sealent @ Rp. = Rp -
10,00000 % Perlengkapan @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
0,01500 Oh Pekerja @ Rp. = Rp -
0,15000 Oh Tukang kayu @ Rp. = Rp -
0,01500 Oh Kepala tukang @ Rp. = Rp -
0,00075 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

17 1 m2 pasang ACP
Bahan
1,1000 m2 acp @ Rp. = Rp -
1,0000 btg Hollow @ Rp. = Rp -
4,0000 m sealent @ Rp. = Rp -
0,2000 kg skrup @ Rp. Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,01500 Oh Pekerja @ Rp. = Rp -
0,15000 Oh Tukang kayu @ Rp. = Rp -
0,01500 Oh Kepala tukang @ Rp. = Rp -
0,00075 Oh Mandor @ Rp. = Rp -
Sub total : = Rp.
Dibulatkan = Rp.

18 1 m' Pasang talang dari PVC diameter 3".


Bahan 0,25000 Ljr lonjor PVC diameter 3" @ Rp. = Rp -
35,00000 % perlengkapan @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,07500 Oh Pekerja @ Rp. = Rp -
0,03500 Oh Tukang kayu @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

19 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )


Bahan
0,10000 Kg Plamir @ Rp. = Rp -
0,25000 Lbr Ampelas @ Rp. = Rp -
0,02000 Bh Kuwas / roll @ Rp. = Rp -
0,10000 Kg Cat dasar @ Rp. = Rp -
0,26000 Kg Cat penutup 2x @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,02000 Oh Pekerja @ Rp. = Rp -
0,06300 Oh Tukang cat @ Rp. = Rp -
0,00630 Oh Kepala tukang @ Rp. = Rp -
0,00250 Oh Mandor @ Rp. = Rp -
. Sub total : = Rp -
Dibulatkan = Rp -

20 1 m2 Pengecatan bidang besi


Bahan
0,20000 Kg Cat meni @ Rp. = Rp -
0,17000 Kg Cat dasar @ Rp. = Rp -
0,17000 Kg Cat penutup 2 x @ Rp. = Rp -
Sub total : = Rp -
Upah Dibulatkan = Rp -
0,07000 Oh Pekerja @ Rp. = Rp -
0,01125 Oh Tukang cat @ Rp. = Rp -
0,00400 Oh Kepala tukang @ Rp. = Rp -
0,00250 Oh Mandor @ Rp. = Rp -
. Sub total : = Rp -
Dibulatkan = Rp -

21 Pemasangan Motor rolling gril


Bahan
1,00000 Unit Motor rolling gril @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
1,01000 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,25000 Oh Tukang listrik @ Rp. = Rp -
0,02500 Oh Kepala tukang istrik @ Rp. = Rp -
0,08000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

22 Pasang rolling grill/m2


Bahan
1,00000 m2 Rollgrill set = Rp -
. Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,20000 Oh Pekerja @ Rp. = Rp -
0,20000 Oh Tukang kaca @ Rp. = Rp -
0,02298 Oh Kepala tukang @ Rp. = Rp -
0,0124050 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

23 M² Pasang paving blok


Bahan
1,10000 M² Paving block @ Rp. = Rp -
0,12100 M³ Pasir urug / tanah katel @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
0,32000 Oh Pekerja @ Rp. = Rp -
0,10000 Oh Tukang @ Rp. = Rp -
0,01000 Oh Kepala Tukang @ Rp. = Rp -
0,01500 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

24 Memasang 1 m' pipa PVC tipe D ø 4"


Bahan
1,20000 m' Pipa PVC 4' @ Rp. = Rp -
35,00000 % Perlengkapan @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -
Upah
0,08100 Oh Pekerja @ Rp. = Rp -
0,13500 Oh Tukang batu @ Rp. = Rp -
0,01350 Oh Kepala tukang @ Rp. = Rp -
0,00410 Oh Mandor @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -
25 Pemasangan kran air
Bahan
1,0000 Bh Kran air @ Rp. = Rp -
0,02500 Bh Seal tape @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -
Upah
0,01000 Oh Pekerja @ Rp. = Rp -
0,10000 Oh Tukang batu @ Rp. = Rp -
0,01000 Oh Kepala tukang @ Rp. = Rp -
0,00500 Oh Mandor @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -

26 Memasang 1 buah floor drain


Bahan
1,00000 Bh Floor drain TX1AN @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -
Upah
0,01000 Oh Pekerja @ Rp. = Rp -
0,10000 Oh Tukang batu @ Rp. = Rp -
0,01000 Oh Kepala tukang @ Rp. = Rp -
0,00500 Oh Mandor @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -

27 1 m2 Pasang plafon gypsum rangka hollow


Bahan
0,40000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. - = Rp -
0,50000 ljr Truss C75.75 SNI BMT @ Rp. - = Rp -
0,05000 Kg Skrup @ Rp. - = Rp -
0,40000 Kg kompon gypsum @ Rp. - = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

Upah
0,10000 Oh Pekerja @ Rp. = Rp -
0,05000 Oh Tukang kayu @ Rp. = Rp -
0,00500 Oh Kepala tukang @ Rp. = Rp -
0,00500 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

28 1 M' Pasang kusen aluminium 3" putih. (Silver)


Bahan
1,10000 M1 Aluminium putih 3". @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

Upah 0,10400 Oh Pekerja @ Rp. = Rp -


0,10400 Oh Tukang besi @ Rp. = Rp -
0,00100 Oh Kepala tukang besi @ Rp. = Rp -
0,00005 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

29 1M2 Pasang daun jendela aluminium 3" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan
4,80000 M1 Slimar Aluminium putih 3" @ Rp. = Rp -
8,50000 M1 Karet penjepit kaca/ tripleks. @ Rp. = Rp -
1,00000 set Engsel jendela. @ Rp. = Rp -
1,00000 Bh Hak window . @ Rp. = Rp -
0,90250 M2 Kaca bening 5 mm @ Rp. = Rp -
Sub total : = Rp -
dibulatkan = Rp -

Upah 1,05000 Oh Pekerja = Rp -


1,05000 Oh Tukang besi @ Rp. = Rp -
0,10500 Oh Kepala tukang besi @ Rp. = Rp -
0,00520 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

30 pasang meja lapis hpl/m2


Bahan:
0,01500 m3 Kayu meranti @ Rp. = Rp -
0,70000 lbr Triplek tebal 18 mm @ Rp. = Rp -
0,05000 kg Paku @ Rp. = Rp -
0,30000 ltr Lem kayu @ Rp. = Rp -
0,50000 m2 HPL Taco woodgrain @ Rp. = Rp -
2,00000 bh Rel @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah.
0,35000 oh Pekerja @ Rp. = Rp -
1,05000 oh Tukang @ Rp. = Rp -
0,10500 oh Kepela tukang @ Rp. = Rp -
0,01800 oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

31 Pasang laci loket/unit


Bahan:
0,50000 ltr Lem kayu @ Rp. = Rp -
4,00000 bh engsel sendok @ Rp. = Rp -
2,28000 m list edging alumunium @ Rp. = Rp -
1,43000 lbr Triplek tebal 18 mm @ Rp. = Rp -
1,33000 m2 HPL Taco woodgrain @ Rp. = Rp -
2,00000 bh Rel @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah.
0,35000 oh Pekerja @ Rp. = Rp -
1,05000 oh Tukang @ Rp. = Rp -
0,10500 oh Kepela tukang @ Rp. = Rp -
0,01800 oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

32 1 m2 pasang kaca sticker/ sand blast


Bahan
1,10000 m2 Kaca sticker @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,01500 Oh Pekerja @ Rp. = Rp -
0,15000 Oh Tukang kayu @ Rp. = Rp -
0,01500 Oh Kepala tukang @ Rp. = Rp -
0,00075 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

34 1 buah pasang door closer


Bahan
1,00000 Bh Door closer @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,05000 Oh Pekerja @ Rp. = Rp -
0,50000 Oh Tukang kayu @ Rp. = Rp -
0,05000 Oh Kepala tukang @ Rp. = Rp -
0,00250 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

35 Memasang 1 m' pipa PVC tipe AW ø 1"


Bahan
1,20000 m' Pipa PVC 1' = Rp -
35,00000 % Perlengkapan = Rp -
Total = Rp -
Dibulatkan = Rp -
Upah
0,03600 Oh Pekerja = Rp -
0,06000 Oh Tukang batu = Rp -
0,00600 Oh Kepala tukang = Rp -
0,00180 Oh Mandor = Rp -
Total = Rp -
Dibulatkan = Rp -

36 Pengelasan Las Listrik Untuk Tiap 10 cm


Bahan
0,40000 Kg Kawat Las @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,04000 Oh Pekerja @ Rp. = Rp -
0,02000 Oh Tukang Las @ Rp. = Rp -
0,00200 Oh Mandor @ Rp. = Rp -
Sub total : = Rp.
Dibulatkan = Rp.

37 Memasang Toren dan Pelampung radar


Bahan
1,00000 Bh Toren 2100 L @ Rp. = Rp -
1,00000 set Radar pelampung @ Rp. = Rp -
10,00000 % Perlengkapan @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
1,00000 Oh Pekerja @ Rp. = Rp -
1,00000 Oh Tukang @ Rp. = Rp -
1,00000 Oh Kepala tukang @ Rp. = Rp -
1,00000 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

38 Memasang 1 M Kabel Power ( NYM 4x2,5 mm)

1,00000 m NYM 4x2,5 mm @ Rp. = Rp -


5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

Upah
0,04570 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,04570 Oh Tukang listrik @ Rp. = Rp -
0,00910 Oh Kepala tukang istrik @ Rp. = Rp -
0,00300 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

39 Pemasangan Instalasi kabel lampu penerangan dengan kabel NYM 3x2,5 mm


Bahan
8,00000 m Kabel NYM 3x2,5 mm @ Rp. = Rp -
2,67000 btg Conduit pipa dia. 20 pj 3m @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,29629 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,29629 Oh Tukang listrik @ Rp. = Rp -
0,05920 Oh Kepala tukang istrik @ Rp. = Rp -
0,03365 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

40 Pemasangan Lampu Dengan Lampu T8 termasuk balak


Bahan
1,00000 bh Led T8 18 watt @ Rp. = Rp -
1,00000 bh Balak T8 18w @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,14035 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,14035 Oh Tukang listrik @ Rp. = Rp -
0,02807 Oh Kepala tukang istrik @ Rp. = Rp -
0,01658 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

41 Memasang Downlight 18 watt


Bahan
1,00000 bh Downlight @ Rp. = Rp -
1,00000 bh Lampu bulb 9 w LED @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -
Upah
0,10526 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,10526 Oh Tukang listrik @ Rp. = Rp -
0,02105 Oh Kepala tukang istrik @ Rp. = Rp -
0,00936 Oh Mandor @ Rp. = Rp -
Total = Rp -
Dibulatkan = Rp -

42 Pemasangan Instalasi stop kontak dengan kabel NYM 3x2,5 mm


Bahan
8,00000 m Kabel NYM 3x2,5 mm @ Rp. = Rp -
2,67000 btg Conduit pipa dia. 20 pj 3m @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,29629 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,29629 Oh Tukang listrik @ Rp. = Rp -
0,05920 Oh Kepala tukang istrik @ Rp. = Rp -
0,03365 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

44 Memasang Saklar tunggal


Bahan
1,00000 bh skalar tunggal @ Rp. = Rp -
5,00000 % Perlengkapan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -
Upah
0,032000 Oh Pembantuk tukang listrik @ Rp. = Rp -
0,032000 Oh Tukang listrik @ Rp. = Rp -
0,004112 Oh Kepala tukang istrik @ Rp. = Rp -
0,001600 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan = Rp -

45 Listrik TDR PLN


Upah
3,50000 Kva Listrik TDR-PLN = Rp -
Dibulatkan : = Rp -

46 Unit Memasang AC 1 PK setara mitsubishi


Bahan
1,00000 Unit Ac split 1 pk setara mitsubishi @ Rp. = Rp -
5,00000 M¹ Pipa Ac 0.5 - 1 Pk @ Rp. = Rp -
5,00000 % Perlengkapan pemasangan instalasi = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
1,14286 Oh Pembantu tukang listrik @ Rp. = Rp -
1,14286 Oh Tukang listrik @ Rp. = Rp -
0,18514 Oh Kepala tukang listrik @ Rp. = Rp -
0,11371 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

47 Unit Memasang AC 2 PK setara mitsubishi


Bahan
1,00000 Unit Ac split 2 pk setara mitshubishi @ Rp. = Rp -
5,00000 M¹ Pipa Ac 1.5 - 2 Pk @ Rp. = Rp -
5,00000 % Perlengkapan pemasangan instalasi @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
1,14286 Oh Pembantu tukang listrik @ Rp. = Rp -
1,14286 Oh Tukang listrik @ Rp. = Rp -
0,18514 Oh Kepala tukang listrik @ Rp. = Rp -
0,11371 Oh Mandor @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
LAMPIRAN III RKS NO : 37/LL/NONSAR/KCI/RKS/III/2018 Tanggal 26 Maret 2018

ANALISA HARGA SATUAN

48 Unit Pemasangan panel ukuran 600 x 400 x 200 tebal 1.8 mm


Bahan
1,00000 Unit Panel Indoor 600 X 400 X 200 mm @ Rp. = Rp -
6,00000 Bh MCB 6A 1F @ Rp. = Rp -
9,00000 Bh MCB 4A 1F @ Rp. = Rp -
1,00000 Bh kontaktor 25 amper coil 220v @ Rp. = Rp -
3,00000 Bh Fuse 10 amp + Rumahnya @ Rp. = Rp -
3,00000 Bh Cylindrical Fuse GAE @ Rp. = Rp -
2,00000 Bh selector 3 posisi @ Rp. = Rp -
3,00000 Bh Pilot lamp 220 v @ Rp. = Rp -
5,00000 M¹ Kabel NYAF 1 X 16 mm @ Rp. = Rp -
20,00000 M¹ Kabel NYAF 1 X 1,5 mm @ Rp. = Rp -
5,00000 % Perlengkapan @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -
Upah
2,00000 Oh Pembantu tukang listrik @ Rp. = Rp -
2,00000 Oh Tukang listrik @ Rp. = Rp -
1,00000 Oh Kepala tukang listrik @ Rp. = Rp -
Sub total : = Rp -
Dibulatkan : = Rp -

PT. .......................

Tanda tangan dan cap perusahaan

……....................……………….
Direktur Utama /Berdasarkan Surat Kuasa

You might also like