Professional Documents
Culture Documents
Pueblo Viejo Project ‐ Dominican Republic
Rene Beltrán – QA/QC Manager
SUMMARY REPORT
Period: 23‐Jul‐09
UT No. Results Weld No. Welder Line No Insp. type Pipe Notes
Type of inspection: Pipe to fitting bond inspection
7 ACCEPT 1 B6 ‐ E. Mena 6162‐12"‐WFP‐008 PF 12''/ 9''
Type of inspection: Pipe to pipe bond inspection
1 ACCEPT 26 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP 24''/ 17''
Inspection Type
F: flanges, P: pipe (PE - Pulse Echo) PA - Phase Array
PP - Pipe to pipe PF - Pipe to fitting GN - General report (no TOFD or PE)
NDT‐INNOVATIONS SERVICES: REPORT ACCEPTED BY CONTRATOR:
José Medina