Barrick Pueblo Viejo / Fluor Daniel South America Limited

Pueblo Viejo Project ‐ Dominican Republic
Rene Beltrán – QA/QC Manager

SUMMARY REPORT
Period: 23‐Jul‐09
UT No.     Results         Weld No.          Welder                                      Line No                                          Insp. type      Pipe              Notes           
Type of inspection:  Pipe to fitting bond inspection
7 ACCEPT 1 B6 ‐ E. Mena 6162‐12"‐WFP‐008 PF       12''/ 9''            

Type of inspection:  Pipe to pipe bond inspection
1 ACCEPT 26 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

2 ACCEPT 27 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

3 ACCEPT 8 B1 ‐ A. Garcia 6161‐30"‐WFF‐057‐ISO #2 PP       30''/ 11''            

4 ACCEPT 9 B1 ‐ A. Garcia 6161‐30"‐WFF‐057‐ISO #2 PP       30''/ 11''            

5 ACCEPT 29 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

6 ACCEPT 30 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

8 ACCEPT 2 B6 ‐ E. Mena 6162‐12"‐WFP‐008 PP       12''/ 9''            

9 ACCEPT 10 B1 ‐ A. Garcia 6161‐30"‐WFF‐057‐ISO #2 PP       30''/ 17''            

10 ACCEPT 3 B6 ‐ E. Mena 6162‐12"‐WFP‐008 PP       12''/ 9''            

11 ACCEPT 31 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

12 ACCEPT 32 B5 ‐ M. Peralta 6162‐24"‐WFF‐075‐HDPE‐H0EW‐NI‐ISO #1 PP       24''/ 17''            

Inspection Type
F: flanges, P: pipe (PE - Pulse Echo) PA - Phase Array
PP - Pipe to pipe PF - Pipe to fitting GN - General report (no TOFD or PE)

                                               NDT‐INNOVATIONS   SERVICES:                                                                                                      REPORT ACCEPTED BY CONTRATOR:    

José Medina

Barrick Pueblo Viejo www.ndt-innovations.com