Professional Documents
Culture Documents
"'r
The following-is a test procedure for the Cavins 3" and 4" Blowout Preveriters. The
purpose of this test is to certifY the casting soundness and insure its working properties
before shipment to our customers.
Procedure:
Certification I J
Date of test: (.a.LI J u1
P~rson performing test: '0 OA d D Sti "'1 ~-e.<=-
L.._t2Dc.::: 0 ~/\ I r :;>1(
Part number of unit: ./ Q -r J ~ ./
~~--~~~----~------~-----------
Notes: p!fj~
2853 CHERRY AVE. • po. BOX 6039 • LONG BEACH. CA 90806-0039 • PH (310) 424-8564 • TELEX 65-6349 • FAX: (310) 595-6174
OPTIONAL EQUIPMENT
~--------------------JOiDIA--------------------~
TOP PLATE
S-fJPZI-A
O -R!NG
S-BPZO-A BODY
•
OIL WELL TOOLS
BLOW OUT PREVENTER
and ROD STRIPPER
2853 Cher~Avenue
Long Beach, California
(310) 424·8564
The combination Blowout Pre"enter and Sucker Rod Stripper combines safety and economy in a tool designed to perform
the necessary function of line wiping. It can be operated from anywhere on the derrick floor utilizing pressure from bottled
nitrogen, an optional hand operated hydraulic pump, or the optional BOP control system (Fig. IC). When this tool is
employed of wire line operations, a CAVI~S Ball Lock Oil Sa\'er is screwed directly into the top of the Blowout Preventer.
\\Then swabbing, a short lubricator the length of the swab between the master gate and the Blowout Preyenter is all that is
required. The Blowout Preyenter is available in either the 3/1 size with full 3" ID clearance and 4" female. A.P.I.line pipe for
the Ball Lock Oil Sayer on top or the 4" size with full 4" ID clearance and 4" female A.P.I. line pipe threads top and bottom.
Pressure connection IS ior li~ " A.P.I. pipe. The units are tested to giye full closure up to 3000 psi well pressure with no leakage.
The full closure feature of tbe Blowout Pre\"cnter will giye a temporary seal, allO\"ing ample time to close: the master gate
should a well blowout occur.
As a Sucker Rod \Viper, the unitaffords exceptionally long wiping service and complete control of the well against possible
leakage or blowout. The rubber wiping unit is comparatively inexpensiye and very easy to change.
Fig.7A Fig.7B
Blowout Preventer Blowout Preventer
Model Bp·50A (3" 1.0.) Model S-BP-50B (4" 1.0.)
Fig. Ie
16
Cavins Model "A"