ABU DHABI GAS DEVELOPMENT COMPANY LIMITED |
a SHAH GAS DEVELOPMENT (SGD) PROGRAM =
INSPECTION AND TEST PLAN FOR GROUNDING AND ner At
{SAMSUNG ENGINEERING LIGHTNING SYSTEM INSTALLATION
‘Agreement No.
13526101 DOC. No: UTO4-0400-92-ITP-0020 Rev. 01
Contractor DOC. No: UT04-0400-69-ITP-0020, Doe Class. 2
SHAH GAS DEVELOPMENT(SGD) PROJECT
INSPECTION AND TEST PLAN
FOR GROUNDING AND LIGHTNING SYSTEM
INSTALLATION
DOCUMENT No. UT04-0400-92-ITP-0020
Status Description | Prepared Approved
= pe 5
18MAR 2012 | RFC desued for _——|-7e/LEE Be |
Construction
Issued for
_11FEB 2012 | IFC Construction | TS:LEE | J.N.LEE | S.M.KWON
‘ab Re-lssued For
30NAN2012 | ROR | companyReview | TS:-LEE | J.N-LEE | S.M. KWON
Issued For Company
43DEC 2011 | ICR Roview T.S.LEE | C.J.CHO | s.M. KWON
Issued For Internal
11DEC 2011 | FR Review T.S.LEE | C.J.CHO NIA
DOCUMENT CLASSIFICATION Pape tof 5 UNCONTROLLED WHEN PRIVTEDABU DHABI GAS DEVELOPMENT COMPANY LIMITED
ww ‘SHAH GAS DEVELOPMENT (SGD) PROGRAM
INSPECTION AND TEST PLAN FOR GROUNDING AND
SAMSUNG ENGINEERIVG LIGHTNING SYSTEM INSTALLATION
‘Agreement No. .
13525101 DOC. No: UT04-0400-92-ITP-0020
Contract Description.
Shah Utilities & Contractor DOC. No: UT04-0400-69-ITP-0020 Doc Class. 2
Off-sites
‘SUMMARY OF DOCUMENT REVISIONS
Date Revised | Section Revised Revision Description
11 DEC 2011 NIA INITIAL ISSUED FOR INTERNAL REVIEW
13 DEC 2011 NIA ISSUED FOR COMPANY REVIEW
30 JAN 2012 NIA RE-ISSUED FOR COMPANY REVIEW
11 FEB 2012 NIA ISSUED FOR CONSTRUCTION
15 MAR 2012 NIA RE-ISSUED FOR CONSTRUCTION
DOCUMENT CLASSIFICATION Page 20f 15 UNCONTROLLED WHEN PRINTEDSHAH GAS DEVELOPMENT (SGD) PROGRAM
INSPECTION AND TEST PLAN FOR GROUNDING AND
‘SAMSUNG ENGINEERING LIGHTNING SYSTEM INSTALLATION
‘Agreement No.
13525101 DOC. No: UT04-0400-92-ITP-0020 ! Bey 01
am” ABU DHABI GAS DEVELOPMENT COMPANY LIMITED BR
Lal peasal
Contract Description. Tr
Shah Utilities & Contractor DOC. No: UT04-0400-69-ITP-0020 Doc Class. 2
Off-sites
TABLE OF CONTENTS
1.0 INSPECTION AND TEST PLAN--------n--seeeosoeeneneneaenrnrnnnnearnnnanensvnenne (Page 4~15)
2.0 CHECKLIST OF ELECTRICAL WORKS
1) INSPECTION CHECKLIST FOR EARTHINGSYSTEM INSTALLATION=-~---=+ UTO4ITPF-EL-049
2) EARTHING CABLE TERMINATIONeweesnmnrnvnernenrnrentnrenrnremneermenee UT O4ITPF-EL-O60
3) CADWELDING/THERMOWELDING CONNECTION UTO4-ITPF-EL-062
4) EARTH BOSS WELDING INSTALLATION--——-—-———- UTO4ITPF-EL-063,
5) GROUNDING AND LIGHTNING CONTINUITY TEST——~ nn UTOAITPF-EL-048
6) EARTHING CONTINUITY TEST REPORT-———-——~ UTO4-ITPF-EL-007
7) EARTHING SYSTEM FIELD TESTING-ewen-eemnnernennrnnennrenemnenneeees UTO4HITPF-EL-059
8) EARTHING ELECTRODE TESTING =_—inew meee eenennenenneeenenrnnmeneee UT O4-ITPF-EL-O61
9) LIGHTNING SYSTEM INSTALLATION: a UT OFT PF EL-084
410) MATERIAL RECEIVING INSPECTION (E& I)rmnvneemmeemeennrmeneemeneseeeeme UT O4PITPF-MRI-001
3.0 ATTACHMENT:
1) NCR FORM
2) PUNCHLIST FORM
DOCUMENT CLASSIFICATION Page 30f15 UNCONTROLLED WHEN PRINTEDINSPECTION AND TEST PLAN
am GROUNDING & LIGHTNING SYSTEM INSTALLATION
SAMSUNG ENGINEERING
Rov: 01
WANUFAGTURESUBCON NAME | PROJECT NO= 2327 'SUB- CONTRAGTOR Looe
Samsung Engineering _|uro1os.sHan GAs DeveLOPMENT -inepection _W- Witness Point
Umum & ors pnovecr lH-Hold Point M-MonitoringR=Reviow
CHARACTERISTICS INSPECTION POINT
tem [QUALITY RELATED REFERENCE TOBEVERIFED | ACCEPTANCE
No |ACTIVITY: DOCUMENT (SAMPLING CRITERIA = POCUMENT.
reaver sue. Jemusune
REQUENCY) cg | MSS | counany
|-conm between
Project DGS-1511-043
materia ienticaion [Confirm Manufacturer
1.0 |MATERIAL VERIFICATION Doe. NoUTO4-D400-89-PRO-0006- No crrrovad data [Product DatalDebvery | Oye Uuenwomerocm | | y | oR
: sheet INotrCerticates
[Each Delvery
20 |EARTHING (GROUNDING) SYSTEM INSTALLATION
conomance to
124 |Checkonipmon ground i ot ies foas-1699-422.004096037/UrOL04000)vl inspections fSpecteatonnaeson | uToaiter-e.ogo autour: |, | w | y
ath cor pound iues-0034 herteaton slanaré nd test e107
eon droning FC
—
a3 [Cheeze ctman eating gtd |oas-1esnazz.o40s0 037 UrO404000-\vaiatinpecions —_[Spetetonanddeson | uTousTrr-eLowauroater-| , | w | y
cob & bench eating conductor ines-0034 Nericaton tana ndtest 1-007
evn droning FC
contemtnesectestonclmain Ings. sea0.003 SECTION 251-2527 UTOE|Vsatnspecion 8 [Spoon and desin | UTOASTPF-EL049& UTOATPE-
2A ering cable & branch earthing o400-0-MES-0094 fericton [ond arate! eL-007 sypow yom
roson craving FC
Page 4 of 15ann?
SAMSUNG ENGINEERING
INSPECTION AND TEST PLAN
GROUNDING & LIGHTNING SYSTEM INSTALLATION
DOC NO. : UT04-0400-92.41TP-0020
Rev: 04
MANUFACTURE / SUBGON. NAME
Samsung Engineering
PROJECT NO.: 2527
luro4-04-SHAH GAS DEVELOPMENT
‘SUB - CONTRACTOR
Inspection
Legend
W-Witness Point
Uunuiy @ orrame pRosecr IH-Hold Point M-Monitacing R= Rovow
CHARACTERISTICS: INSPECTION POINT
tem auaLiry RELATED REFERENCE TOBE VERIED | ACCEPTANCE
Wo Jacriry DOCUMENT (GAMPLING CRITERIA ‘verry pocuMeNt
iRoom sus. |sansune
i} cont.ac| ac | COMPANY
contamance to
aap [Contr econ zo & oos-tesoa0s Secrion25.1-2527/UTO4|vaustnspcion& _|Speciicaten nd.deon | UTOTPR-cLov@auTonTr-| | wy |g
Jvecteaon fer lee 400-9-MES0094 entiation [andar and ines L007
fovon caving
veut rapes foefermanes a
sng [Oech depot ath elecrade & |ogs-100-03 szcrion 25.12.27 /urau|“susnapesion— |ssccaton anddeden | urownPr-eLowogurouTer: |) | wy |
ndataton of repecon o4a0-9-MES-0094 jettzaion! As Per |e anos EL007
reton craving FC
contamance to
az [Checktnedesh oftuiedeathing |O¢8-16009 SECTION 251-2527 /UTO4\Vaualnecton& [Spear ard dxon | UToaTPr-iowauroarTer-| | wy | w
7 ronatr below grade o400-9-MES-0094 etieaton ender an inet ecaar
retin crowing IFC
contamance to
tag [oteciteinstaton fearing ocs-teseaes SECTION 25.1-25.27/UTO4|Vuainpacton& _|Spetieatin arden | UToaPr-sLowoaurosr-| | wy | w
busta as por approved rane o400-9.MES-034 [ericaen andr an net eL007
reson crewing IFC
Page 5 of 15INSPECTION AND TEST PLAN
am GROUNDING & LIGHTNING SYSTEM INSTALLATION
SLAW pen ett
‘SAMSUNG ENGINEERING } Diana Gan
DOC NO. : UT04-0400.924TP-0020 Rev: 01
WANUFAGTURE/SUBCON NAME | PROJECT NO; 2327 ‘SUB - CONTRACTOR Legend
Samsung Engineering |UT04-04-SHAH GAS DEVELOPMENT |I- Inspection W - Witness Point
Umum a orFamepnovecr IH-Hold Point M-Monitoring R= Reviow
(CHARACTERISTICS INSPECTION POINT
tom [QUALITY RELATED REFERENCE TOBE VERIFIED | ACCEPTANCE
No |ACTIVITY DOCUMENT {SAMPLING CRITERIA NEREONO DOCUMENT: Pa] ee
FREQUENCY) et | MSY" | company
orc te jon & toe ne catia ngs sens SECTION 251-2527 / UTA) salnapecton & [Spent and xn | UTOAITPF-EL-049 & UTOGITPF-
2:9, | enictnr a ceeaptesion (0400-69-MES-0034 verification standard and latest L007 v w %
come or hema welse ane
conformance to
check te eating conecteno
lbes-teso.0s section 251-257 / Tos [Seooteaton ond dosign | UTOSITPF-cL-040& UTOAATPF-
2.10 faqupment otvture wit bates keaecrn a lero becitting _|Spestleaton ae asoia ofow dow
pores [revision drawing IFC.
eae a contomance to
ee eee DGS-1630-003 SECTION 25.1 ~ 25.27/ | Visual inspection & {Specification and design | UTO4ITPF-EL-049 & UTO4-ITPF-
2:01 epee res ennennvees |UT04-0400-68-MES-0034 |verification |standard and latest L007 I " ¥
[sectal system earth eecrodes esl aaa
Page 6 of 15«mo
‘SAMSUNG ENGINEERING
INSPECTION AND TEST PLAN
GROUNDING & LIGHTNING SYSTEM INSTALLATION
DOC NO. : UT04-0400-92-1TP-0020
Rev: 04
MANUFACTURE / SUBGON. NAME
‘Samsung Engineering
PROJECT NO. 2327
luros.o4-SHAH GAS DEVELOPMENT
‘SUB - CONTRACTOR.
Legend
I-tnspection _W-- Witness Point
UTILITY. & OFFSITE PROJECT IH-Hold Point -M-Monitoring Review
(CHARACTERISTICS INSPECTION POINT
JQuaLmry RELATED REFERENCE ‘TOBE VERIFIED ‘ACCEPTANCE
lacrivry DOCUMENT (SAMPLING ‘CRITERIA iorTMic DOCUNENT:
FREQUENC sus-_|sawsunc
” conr.ac} ac | COMPANY
Iconformance to
[check he connections tight & _DGS-1630-003 SECTION 25.1~25.27 / UTO| [specication and design | UTO4ITPF-EL-049 & UTO4ITPF-
242 | ecure for joints & taps (0400-68-MES-0094 sual inspection & veri tandard and latest 1.007 i a a
eision drawing FC
[Check sirect connection of earthing |contormance to
‘ita [vem fr mejor eloctical equipment |DGS-1630-003 SECTION 26.1~26.27 /UTO4-|Veulinepactn & | Specfeston and deson | UTOATPF-EL-O49 & UTOAATPF- | f %
13 |iower, pole, contol panel, & metalic (0400-69-MES-0034 verification standard and latest L007
Itramowor. revision drawing IFO
30 [LIGHTNING SYSTEM INSTALLATION.
[Conformance to
[check the connection of stool
peck the conneion of te J>GS-1630-008 SECTION 25.1-25.27 /UTO4-| Visual inspection 8 [Speciation and deson i
2) eae (0400-50-MES-0034 ericson standard and latest vee es i ™ bs
revision drawing IFC
[Conformance to
[check tightness & secure forall |IGS-1630-003 SECTION 25.1~25.27 | UTOA.| |Specioaton and desion i
az oan Maen ene Before backing aera etn UTDETTPFELO6S ' w w
revision drawing FC
Page 7 of 15«om
SAMSUNG ENGINEERING
INSPECTION AND TEST PLAN
GROUNDING & LIGHTNING SYSTEM INSTALLATION
DOC NO: UTo#.0400-9217P.2020 evs 01
WAMIEACTURE UBCON- RANE | PRONEDT WOT SuB- CONTRACTOR Toe
Samsung Engineering _|[uT04-04-SHAH GAS DEVELOPMENT l1-nspection _-W-- Witness Point
many, Soran oaesr t-te Pot M-Metrng Rew
CHARACTERISTICS INSPECTION POINT
tum funy ecareo erence Towcvenres | accerrance
No |ACTIVITY DOCUMENT (SAMPLING CRITERIA pune ses coca
ers aed cco | CE,
i rae) oe, er
contemarste
caro at thot : sate a re
3 |isunny accross erO68-1090409 SECTION 261-2527 UTOL Vnlinpcn 8 [Sweetin and ceean | rogsrp.004 alee
peementinniny Jrevision drawing IFC
csomenct
cree necmnctonc enna _[oos-130-00 secrion 25-2827 /uTo stn ’
sa [ona cmecen ts SECTION 25.2 cnc seen Sete ae ures TPF eL064 | we
fen
cenerraesto
lmcnecomacen wich. foas.tesnans seorion 281-2827 TOL |apecn [Speco end eon ;
Las |secure for joints & taps. (0400-69-MES-0034 verification {standard and latest ee : *. ¥
leno conic
{o_[GADWELDING /THERMOWELDING CONNECTION
—
cre Ce Se aa Tp Core baastneposens |SpslSensnacon | vroesercLowauroaer-
44 |Casting Mould and Powder Charge an janice -69-MES-0034 | ecfcation |standard and latest EL062 ’ Ld ¥
revision drawing IFC
Page 8 of 15INSPECTION AND TEST PLAN
am GROUNDING & LIGHTNING SYSTEM INSTALLATION
‘SAMSUNG ENGINEERING
DOC NO. UT04-0400-924TP-0020 Rev: 04
MANUFACTURE /SUBCON, NAME | PROJECT NO; 2327 ‘SUB - CONTRACTOR ego
\uroso4-SHAM GAS DEVELOPMENT \ | SUB. CONT/ VENDOR
SAMSUNG CONST.
SAMSUNG QC PMCICOMPANY
PROJECT DOG NOWUTO-O400-S2ITP-O020
UTOH-TPF-EL-o48
Page 1 of 1<= ‘ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
ices’ ‘SHAH GAS DEVELOPMENT (SGD) PROGRAM
[CONTRACT DESCRIPTION: SHAH UTILITIES & OFF SITES [Agreement No 13525101
[System No. QUALITY CONTROL FORM No|UTosTPF-EL-007
Lint Ne. EARTHING CONTINUITY TEST REPORT [ob No. 42827
client |Contractor: SECL
REFERENCE DRAWINGS: EQUIPMENT NO. Report No. DATE:
SHEET — of REVO
1.0 GENERAL DATA RFI REF. No.:
Location Number of Earth Electrodes
Number of Gd Number of Equipment
intereonnecton Structure Connection
INSPECTION TYPE:
EQUIPMENT ELECTRODE CABLE WAY / RACEWAY
rem EQUIPMENT NO. TERMINATION RESULT REMARKS
INSTRUMENT DETAILS
[rvee OF TEST EQUIPMENT
MANUFACTURER
[Sera NO.
[CALIBRATION DATE:
[CALIBRATION DUE DATE
[rest VOLTAGE
(ON COMPLETION OF TESTS ENSURE THAT
42)CABLE IS CORRECTLY RE-CONNECTED.
)BOLT CONNECTION IS CHECKED FOR TIGHTNESS
REMARKS:
“SCTE T SUB. CONT/ VENDOR | SAMSUNG CONST, SAMSUNG QC PMCICOMPANY
Signature:
Date:
‘PROJECT DOC NOWUTO4-0400-82.TP.0020
UTDe-ITPF-EL007
Page 1 of 1<7
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
‘SHAH GAS DEVELOPMENT (SGD) PROGRAM
|CONTRACT DESCRIPTION: SHAH UTILITIES & OFF SITES.
[Agreement No.13525101
[System No.
QUALITY CONTROL,
FORM No|UTO4-ITPF-EL-059
Unit No,
lctient
EARTHING SYSTEM FIELD T
maTiNG lJob No. _|2327
[Contractor: SECL
REFERENCE DRAWINGS:
EQUIPMENT NO.
[Report No. DATE!
SHEET of JREV:00
1.0 GENERAL DATA
Location:
Number of fnterconnector
‘Structure Connection.
}2.0 TEST RESULT
RFI REF. No.:
Number of Grid:
Interconnection:
From (Equipment)
Ito
a [Test No.
INSTRUMENT DETAILS
[rvPe oF TEST EQUIPMENT:
MANUFACTURER
[SERIAL NO.
[CALIBRATION DATE
[CALIBRATION DUE DATE
[TEST VOLTAGE
P)BOLT CONNECTION is CHECKED
ON COMPLETION OF TESTS ENSURE THAT.
8) CABLE IS CORRECTLY RE-CONNECTED,
FOR TIGHTNESS
REMARKS:
"SES] SUB. CONT/ VENDOR
‘SAMSUNG CONST.
‘SAMSUNG Qc PMCICOMPANY
Signatur
Date:
PROJECT DOG NO;UTO#-0400.0217P-0020
UTOE-TPF-£1-059,
Page 1 of 1