You are on page 1of 28
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED | a SHAH GAS DEVELOPMENT (SGD) PROGRAM = INSPECTION AND TEST PLAN FOR GROUNDING AND ner At {SAMSUNG ENGINEERING LIGHTNING SYSTEM INSTALLATION ‘Agreement No. 13526101 DOC. No: UTO4-0400-92-ITP-0020 Rev. 01 Contractor DOC. No: UT04-0400-69-ITP-0020, Doe Class. 2 SHAH GAS DEVELOPMENT(SGD) PROJECT INSPECTION AND TEST PLAN FOR GROUNDING AND LIGHTNING SYSTEM INSTALLATION DOCUMENT No. UT04-0400-92-ITP-0020 Status Description | Prepared Approved = pe 5 18MAR 2012 | RFC desued for _——|-7e/LEE Be | Construction Issued for _11FEB 2012 | IFC Construction | TS:LEE | J.N.LEE | S.M.KWON ‘ab Re-lssued For 30NAN2012 | ROR | companyReview | TS:-LEE | J.N-LEE | S.M. KWON Issued For Company 43DEC 2011 | ICR Roview T.S.LEE | C.J.CHO | s.M. KWON Issued For Internal 11DEC 2011 | FR Review T.S.LEE | C.J.CHO NIA DOCUMENT CLASSIFICATION Pape tof 5 UNCONTROLLED WHEN PRIVTED ABU DHABI GAS DEVELOPMENT COMPANY LIMITED ww ‘SHAH GAS DEVELOPMENT (SGD) PROGRAM INSPECTION AND TEST PLAN FOR GROUNDING AND SAMSUNG ENGINEERIVG LIGHTNING SYSTEM INSTALLATION ‘Agreement No. . 13525101 DOC. No: UT04-0400-92-ITP-0020 Contract Description. Shah Utilities & Contractor DOC. No: UT04-0400-69-ITP-0020 Doc Class. 2 Off-sites ‘SUMMARY OF DOCUMENT REVISIONS Date Revised | Section Revised Revision Description 11 DEC 2011 NIA INITIAL ISSUED FOR INTERNAL REVIEW 13 DEC 2011 NIA ISSUED FOR COMPANY REVIEW 30 JAN 2012 NIA RE-ISSUED FOR COMPANY REVIEW 11 FEB 2012 NIA ISSUED FOR CONSTRUCTION 15 MAR 2012 NIA RE-ISSUED FOR CONSTRUCTION DOCUMENT CLASSIFICATION Page 20f 15 UNCONTROLLED WHEN PRINTED SHAH GAS DEVELOPMENT (SGD) PROGRAM INSPECTION AND TEST PLAN FOR GROUNDING AND ‘SAMSUNG ENGINEERING LIGHTNING SYSTEM INSTALLATION ‘Agreement No. 13525101 DOC. No: UT04-0400-92-ITP-0020 ! Bey 01 am” ABU DHABI GAS DEVELOPMENT COMPANY LIMITED BR Lal peasal Contract Description. Tr Shah Utilities & Contractor DOC. No: UT04-0400-69-ITP-0020 Doc Class. 2 Off-sites TABLE OF CONTENTS 1.0 INSPECTION AND TEST PLAN--------n--seeeosoeeneneneaenrnrnnnnearnnnanensvnenne (Page 4~15) 2.0 CHECKLIST OF ELECTRICAL WORKS 1) INSPECTION CHECKLIST FOR EARTHINGSYSTEM INSTALLATION=-~---=+ UTO4ITPF-EL-049 2) EARTHING CABLE TERMINATIONeweesnmnrnvnernenrnrentnrenrnremneermenee UT O4ITPF-EL-O60 3) CADWELDING/THERMOWELDING CONNECTION UTO4-ITPF-EL-062 4) EARTH BOSS WELDING INSTALLATION--——-—-———- UTO4ITPF-EL-063, 5) GROUNDING AND LIGHTNING CONTINUITY TEST——~ nn UTOAITPF-EL-048 6) EARTHING CONTINUITY TEST REPORT-———-——~ UTO4-ITPF-EL-007 7) EARTHING SYSTEM FIELD TESTING-ewen-eemnnernennrnnennrenemnenneeees UTO4HITPF-EL-059 8) EARTHING ELECTRODE TESTING =_—inew meee eenennenenneeenenrnnmeneee UT O4-ITPF-EL-O61 9) LIGHTNING SYSTEM INSTALLATION: a UT OFT PF EL-084 410) MATERIAL RECEIVING INSPECTION (E& I)rmnvneemmeemeennrmeneemeneseeeeme UT O4PITPF-MRI-001 3.0 ATTACHMENT: 1) NCR FORM 2) PUNCHLIST FORM DOCUMENT CLASSIFICATION Page 30f15 UNCONTROLLED WHEN PRINTED INSPECTION AND TEST PLAN am GROUNDING & LIGHTNING SYSTEM INSTALLATION SAMSUNG ENGINEERING Rov: 01 WANUFAGTURESUBCON NAME | PROJECT NO= 2327 'SUB- CONTRAGTOR Looe Samsung Engineering _|uro1os.sHan GAs DeveLOPMENT -inepection _W- Witness Point Umum & ors pnovecr lH-Hold Point M-MonitoringR=Reviow CHARACTERISTICS INSPECTION POINT tem [QUALITY RELATED REFERENCE TOBEVERIFED | ACCEPTANCE No |ACTIVITY: DOCUMENT (SAMPLING CRITERIA = POCUMENT. reaver sue. Jemusune REQUENCY) cg | MSS | counany |-conm between Project DGS-1511-043 materia ienticaion [Confirm Manufacturer 1.0 |MATERIAL VERIFICATION Doe. NoUTO4-D400-89-PRO-0006- No crrrovad data [Product DatalDebvery | Oye Uuenwomerocm | | y | oR : sheet INotrCerticates [Each Delvery 20 |EARTHING (GROUNDING) SYSTEM INSTALLATION conomance to 124 |Checkonipmon ground i ot ies foas-1699-422.004096037/UrOL04000)vl inspections fSpecteatonnaeson | uToaiter-e.ogo autour: |, | w | y ath cor pound iues-0034 herteaton slanaré nd test e107 eon droning FC — a3 [Cheeze ctman eating gtd |oas-1esnazz.o40s0 037 UrO404000-\vaiatinpecions —_[Spetetonanddeson | uTousTrr-eLowauroater-| , | w | y cob & bench eating conductor ines-0034 Nericaton tana ndtest 1-007 evn droning FC contemtnesectestonclmain Ings. sea0.003 SECTION 251-2527 UTOE|Vsatnspecion 8 [Spoon and desin | UTOASTPF-EL049& UTOATPE- 2A ering cable & branch earthing o400-0-MES-0094 fericton [ond arate! eL-007 sypow yom roson craving FC Page 4 of 15 ann? SAMSUNG ENGINEERING INSPECTION AND TEST PLAN GROUNDING & LIGHTNING SYSTEM INSTALLATION DOC NO. : UT04-0400-92.41TP-0020 Rev: 04 MANUFACTURE / SUBGON. NAME Samsung Engineering PROJECT NO.: 2527 luro4-04-SHAH GAS DEVELOPMENT ‘SUB - CONTRACTOR Inspection Legend W-Witness Point Uunuiy @ orrame pRosecr IH-Hold Point M-Monitacing R= Rovow CHARACTERISTICS: INSPECTION POINT tem auaLiry RELATED REFERENCE TOBE VERIED | ACCEPTANCE Wo Jacriry DOCUMENT (GAMPLING CRITERIA ‘verry pocuMeNt iRoom sus. |sansune i} cont.ac| ac | COMPANY contamance to aap [Contr econ zo & oos-tesoa0s Secrion25.1-2527/UTO4|vaustnspcion& _|Speciicaten nd.deon | UTOTPR-cLov@auTonTr-| | wy |g Jvecteaon fer lee 400-9-MES0094 entiation [andar and ines L007 fovon caving veut rapes foefermanes a sng [Oech depot ath elecrade & |ogs-100-03 szcrion 25.12.27 /urau|“susnapesion— |ssccaton anddeden | urownPr-eLowogurouTer: |) | wy | ndataton of repecon o4a0-9-MES-0094 jettzaion! As Per |e anos EL007 reton craving FC contamance to az [Checktnedesh oftuiedeathing |O¢8-16009 SECTION 251-2527 /UTO4\Vaualnecton& [Spear ard dxon | UToaTPr-iowauroarTer-| | wy | w 7 ronatr below grade o400-9-MES-0094 etieaton ender an inet ecaar retin crowing IFC contamance to tag [oteciteinstaton fearing ocs-teseaes SECTION 25.1-25.27/UTO4|Vuainpacton& _|Spetieatin arden | UToaPr-sLowoaurosr-| | wy | w busta as por approved rane o400-9.MES-034 [ericaen andr an net eL007 reson crewing IFC Page 5 of 15 INSPECTION AND TEST PLAN am GROUNDING & LIGHTNING SYSTEM INSTALLATION SLAW pen ett ‘SAMSUNG ENGINEERING } Diana Gan DOC NO. : UT04-0400.924TP-0020 Rev: 01 WANUFAGTURE/SUBCON NAME | PROJECT NO; 2327 ‘SUB - CONTRACTOR Legend Samsung Engineering |UT04-04-SHAH GAS DEVELOPMENT |I- Inspection W - Witness Point Umum a orFamepnovecr IH-Hold Point M-Monitoring R= Reviow (CHARACTERISTICS INSPECTION POINT tom [QUALITY RELATED REFERENCE TOBE VERIFIED | ACCEPTANCE No |ACTIVITY DOCUMENT {SAMPLING CRITERIA NEREONO DOCUMENT: Pa] ee FREQUENCY) et | MSY" | company orc te jon & toe ne catia ngs sens SECTION 251-2527 / UTA) salnapecton & [Spent and xn | UTOAITPF-EL-049 & UTOGITPF- 2:9, | enictnr a ceeaptesion (0400-69-MES-0034 verification standard and latest L007 v w % come or hema welse ane conformance to check te eating conecteno lbes-teso.0s section 251-257 / Tos [Seooteaton ond dosign | UTOSITPF-cL-040& UTOAATPF- 2.10 faqupment otvture wit bates keaecrn a lero becitting _|Spestleaton ae asoia ofow dow pores [revision drawing IFC. eae a contomance to ee eee DGS-1630-003 SECTION 25.1 ~ 25.27/ | Visual inspection & {Specification and design | UTO4ITPF-EL-049 & UTO4-ITPF- 2:01 epee res ennennvees |UT04-0400-68-MES-0034 |verification |standard and latest L007 I " ¥ [sectal system earth eecrodes esl aaa Page 6 of 15 «mo ‘SAMSUNG ENGINEERING INSPECTION AND TEST PLAN GROUNDING & LIGHTNING SYSTEM INSTALLATION DOC NO. : UT04-0400-92-1TP-0020 Rev: 04 MANUFACTURE / SUBGON. NAME ‘Samsung Engineering PROJECT NO. 2327 luros.o4-SHAH GAS DEVELOPMENT ‘SUB - CONTRACTOR. Legend I-tnspection _W-- Witness Point UTILITY. & OFFSITE PROJECT IH-Hold Point -M-Monitoring Review (CHARACTERISTICS INSPECTION POINT JQuaLmry RELATED REFERENCE ‘TOBE VERIFIED ‘ACCEPTANCE lacrivry DOCUMENT (SAMPLING ‘CRITERIA iorTMic DOCUNENT: FREQUENC sus-_|sawsunc ” conr.ac} ac | COMPANY Iconformance to [check he connections tight & _DGS-1630-003 SECTION 25.1~25.27 / UTO| [specication and design | UTO4ITPF-EL-049 & UTO4ITPF- 242 | ecure for joints & taps (0400-68-MES-0094 sual inspection & veri tandard and latest 1.007 i a a eision drawing FC [Check sirect connection of earthing |contormance to ‘ita [vem fr mejor eloctical equipment |DGS-1630-003 SECTION 26.1~26.27 /UTO4-|Veulinepactn & | Specfeston and deson | UTOATPF-EL-O49 & UTOAATPF- | f % 13 |iower, pole, contol panel, & metalic (0400-69-MES-0034 verification standard and latest L007 Itramowor. revision drawing IFO 30 [LIGHTNING SYSTEM INSTALLATION. [Conformance to [check the connection of stool peck the conneion of te J>GS-1630-008 SECTION 25.1-25.27 /UTO4-| Visual inspection 8 [Speciation and deson i 2) eae (0400-50-MES-0034 ericson standard and latest vee es i ™ bs revision drawing IFC [Conformance to [check tightness & secure forall |IGS-1630-003 SECTION 25.1~25.27 | UTOA.| |Specioaton and desion i az oan Maen ene Before backing aera etn UTDETTPFELO6S ' w w revision drawing FC Page 7 of 15 «om SAMSUNG ENGINEERING INSPECTION AND TEST PLAN GROUNDING & LIGHTNING SYSTEM INSTALLATION DOC NO: UTo#.0400-9217P.2020 evs 01 WAMIEACTURE UBCON- RANE | PRONEDT WOT SuB- CONTRACTOR Toe Samsung Engineering _|[uT04-04-SHAH GAS DEVELOPMENT l1-nspection _-W-- Witness Point many, Soran oaesr t-te Pot M-Metrng Rew CHARACTERISTICS INSPECTION POINT tum funy ecareo erence Towcvenres | accerrance No |ACTIVITY DOCUMENT (SAMPLING CRITERIA pune ses coca ers aed cco | CE, i rae) oe, er contemarste caro at thot : sate a re 3 |isunny accross erO68-1090409 SECTION 261-2527 UTOL Vnlinpcn 8 [Sweetin and ceean | rogsrp.004 alee peementinniny Jrevision drawing IFC csomenct cree necmnctonc enna _[oos-130-00 secrion 25-2827 /uTo stn ’ sa [ona cmecen ts SECTION 25.2 cnc seen Sete ae ures TPF eL064 | we fen cenerraesto lmcnecomacen wich. foas.tesnans seorion 281-2827 TOL |apecn [Speco end eon ; Las |secure for joints & taps. (0400-69-MES-0034 verification {standard and latest ee : *. ¥ leno conic {o_[GADWELDING /THERMOWELDING CONNECTION — cre Ce Se aa Tp Core baastneposens |SpslSensnacon | vroesercLowauroaer- 44 |Casting Mould and Powder Charge an janice -69-MES-0034 | ecfcation |standard and latest EL062 ’ Ld ¥ revision drawing IFC Page 8 of 15 INSPECTION AND TEST PLAN am GROUNDING & LIGHTNING SYSTEM INSTALLATION ‘SAMSUNG ENGINEERING DOC NO. UT04-0400-924TP-0020 Rev: 04 MANUFACTURE /SUBCON, NAME | PROJECT NO; 2327 ‘SUB - CONTRACTOR ego \uroso4-SHAM GAS DEVELOPMENT \ | SUB. CONT/ VENDOR SAMSUNG CONST. SAMSUNG QC PMCICOMPANY PROJECT DOG NOWUTO-O400-S2ITP-O020 UTOH-TPF-EL-o48 Page 1 of 1 <= ‘ABU DHABI GAS DEVELOPMENT COMPANY LIMITED ices’ ‘SHAH GAS DEVELOPMENT (SGD) PROGRAM [CONTRACT DESCRIPTION: SHAH UTILITIES & OFF SITES [Agreement No 13525101 [System No. QUALITY CONTROL FORM No|UTosTPF-EL-007 Lint Ne. EARTHING CONTINUITY TEST REPORT [ob No. 42827 client |Contractor: SECL REFERENCE DRAWINGS: EQUIPMENT NO. Report No. DATE: SHEET — of REVO 1.0 GENERAL DATA RFI REF. No.: Location Number of Earth Electrodes Number of Gd Number of Equipment intereonnecton Structure Connection INSPECTION TYPE: EQUIPMENT ELECTRODE CABLE WAY / RACEWAY rem EQUIPMENT NO. TERMINATION RESULT REMARKS INSTRUMENT DETAILS [rvee OF TEST EQUIPMENT MANUFACTURER [Sera NO. [CALIBRATION DATE: [CALIBRATION DUE DATE [rest VOLTAGE (ON COMPLETION OF TESTS ENSURE THAT 42)CABLE IS CORRECTLY RE-CONNECTED. )BOLT CONNECTION IS CHECKED FOR TIGHTNESS REMARKS: “SCTE T SUB. CONT/ VENDOR | SAMSUNG CONST, SAMSUNG QC PMCICOMPANY Signature: Date: ‘PROJECT DOC NOWUTO4-0400-82.TP.0020 UTDe-ITPF-EL007 Page 1 of 1 <7 ABU DHABI GAS DEVELOPMENT COMPANY LIMITED ‘SHAH GAS DEVELOPMENT (SGD) PROGRAM |CONTRACT DESCRIPTION: SHAH UTILITIES & OFF SITES. [Agreement No.13525101 [System No. QUALITY CONTROL, FORM No|UTO4-ITPF-EL-059 Unit No, lctient EARTHING SYSTEM FIELD T maTiNG lJob No. _|2327 [Contractor: SECL REFERENCE DRAWINGS: EQUIPMENT NO. [Report No. DATE! SHEET of JREV:00 1.0 GENERAL DATA Location: Number of fnterconnector ‘Structure Connection. }2.0 TEST RESULT RFI REF. No.: Number of Grid: Interconnection: From (Equipment) Ito a [Test No. INSTRUMENT DETAILS [rvPe oF TEST EQUIPMENT: MANUFACTURER [SERIAL NO. [CALIBRATION DATE [CALIBRATION DUE DATE [TEST VOLTAGE P)BOLT CONNECTION is CHECKED ON COMPLETION OF TESTS ENSURE THAT. 8) CABLE IS CORRECTLY RE-CONNECTED, FOR TIGHTNESS REMARKS: "SES] SUB. CONT/ VENDOR ‘SAMSUNG CONST. ‘SAMSUNG Qc PMCICOMPANY Signatur Date: PROJECT DOG NO;UTO#-0400.0217P-0020 UTOE-TPF-£1-059, Page 1 of 1

You might also like