COMMISSIONING CHECK SHEET E-015B2

ELECTRICAL Sheet 1 of 1

EARTH ELECTRODE REV 1


PROJECT
DESCRIPTION
HASDRUBAL TERMINAL PROJECT No. 103517CNT

SUB-SYSTEM
SUB-SYSTEM No.
DESCRIPTION
SERVICE
TAG No.
DESCRIPTION

A. INDENT / CONTRACT No:

LOCATION / STATION: SYSTEM / DUTY:

DRAWING NO:

B. TESTS Results

1. Measure and record resistance of each electrode not connected to the ring ()

Earth Electrode No: 1

Earth Electrode No: 2

Earth Electrode No: 3

Earth Electrode No: 4

Earth Electrode No: 5

Earth Electrode No: 6

Earth Electrode No: 7

Earth Electrode No: 8

Earth Electrode No: 9

Earth Electrode No: 10

2. Measure and record resistance with all the earth electrodes connected to the ring ()

3. Indicate the Test method.


C. REMARKS / OBSERVATIONS:

COMPLETED BY PIRECO APPROVED BY PECIL-TUNISIA ACCEPTED BY PECIL-COMMISSIONING


NAME NAME NAME
COMPANY COMPANY REF. IND.
SIGN & DATE SIGN & DATE SIGN & DATE

*P1/1*