SITE ACCEPTANCE TEST REPORT – FEEDER PILLAR

1. PROJECT DETAILS
PROJECT NUMBER MZEC / T01 / 2022
CONTRACTOR NAME MOWRED ENGINEERING SERVICES
WORK ORDER NO BTS / SUW / REH / 022 / 2023
LOCATION & DATE AL GALIELA, SUWAIQ – 11.07.2023
SUBSTATION SS NO # 206; GALIELA

2. GENERAL DATA
Sl .No. DESCRIPTION
1 RATED VOLTAGE AND CURRENT 415 V/ 1600 A
2 MAKE AND YEAR OF MANUFACTURER TALENT ELECTRIC SERVICES LLC / 2023
3 SERIAL NUMBER TGFP168-23005230
4 CABLE SIZE WITH RATING LV 1C X 630 mm2
5 CABLE DISTANCE 7 Mtrs
6 CABLE MAKE / MANUFACTURER OMAN CABLES
7 CABLE ROUTE FROM AND TO TX LV SIDE TO MAIN FEEDER PILLAR
8 NUMBER OF JOINTS NIL
9 MAKE OF JOINTS RAYCHEM
10 JOINTER NAME WITH LICENCE NUMBER PALANI.D, LIC. NO.: 2815

3. WORK CLEARANCE FORM


PERMITS NUMBER AND DATE REMARKS
PTW YES N/A
LOA YES N/A
SFT YES N/A
SHUTDOWN YES N/A

4. FUSE RATING / INDICATION AND CONTINUITY CHECKS: OK

Issue: 02, Rev: 00 05 February 2020 Doc # MZEC-PM-Ext-F-007 Page 1 of 2


IAP-395/2023
5. INSULATION RESISTANCE TEST: BUS BAR
TEST VOLTAGE: 500V DC, TIME: 1 MINUTE / TEMP:39° C
PHASE CONTINUITY VOLTAGE APPLIED BETWEEN MEASURED VALUE REMARKS
BUS BAR - MAIN FEEDER PILLAR-1
R – R’ R => Y + B + N + EARTH 4.27 GΩ OK
Y – Y’ Y => B + R + N + EARTH 3.20 GΩ OK
B – B’ B => R + Y + N + EARTH 4.16 GΩ OK

6. INSULATION RESISTANCE TEST: 1CX630 CABLE OES 2, CLAUSE 3.13.3.1


TEST VOLTAGE: 500 V DC / TIME: 1 MINUTE / TEMP: 39° C
PHASE CONTINUITY VOLTAGE APPLIED BETWEEN MEASURED VALUE REMARKS
CABLE FROM DISTRIBUTION TRANSFORMER TO MAIN FEEDER PILLAR-1
R1 – R1’ R1 => EARTH 230 GΩ OK
Y1 – Y1’ Y1 => EARTH 284 GΩ OK
B1 – B1’ B1 => EARTH 162.3 GΩ OK
R2 – R2’ R2 => EARTH 94 GΩ OK
Y2 – Y2’ Y2 => EARTH 191.3 GΩ OK
B2 – B2’ B2 => EARTH 217 GΩ OK
N – N’ N => EARTH 196 GΩ OK

7. INSTRUMENTS DETAILS :
INSTRUMENTS MAKE/ MODEL SERIAL NUMBER CAL.DUE DATE
Insulation Resistance Tester (5kV) MEGGER/ MIT 515 101696441 13.11.2023
Digital Multimeter FLUKE /116 31830359 WS 25.09.2023
Primary Injection Kit Omicron CPC100 UA350B 03.05.2024

Tested By Witnessed By
NAME FEROZ HAKKIM [PE04/2021] ENG. YOUSEF AL BADAWI
DATE 11/07/2023 11/07/2023

SIGNATURE

ORGANIZATION ISSA ABDULLAH PROJECTS NAMA ELECTRICITY DISTRIBUTION

Issue: 02, Rev: 00 05 February 2020 Doc # MZEC-PM-Ext-F-007 Page 2 of 2