Medidas Cantidades
Ítem Descripción Und. Cant.
Largo Ancho Alto Parcial
3 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA
C12-C18´ M 1.00 40.50 40.50
C18´-C18 1.00 40.00 40.00
C18-C19" 1.00 32.20 32.20
C19"-C19 1.00 13.50 13.50
C19-C20 1.00 48.10 48.10
C20-20´ 1.00 52.40 52.40
C20´-CQ 1.00 40.00 40.00
4 RETIRO DE EMPEDRADO
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
camaras
C18´ 1.00 2.00 2.00 4.00
7 CORTE DE ASFALTO
C16-17 1.00 46.50 0.90 41.85
Camaras
C16 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
6 DEMOLICION DE Hº Aº
23 REPOSICION DE EMPEDRADO
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
camaras
18´ 1.00 2.00 2.00 4.00
26 LIMPIEZA GENERAL
PROV. Y COLOC. GRAVA PARA ASIENTO M3 1.00 21.88 21.88
MENOS EL DIAMETRO DE LA TUBERIA D=10" 1.00 12.68 12.68
MENOS EL DIAMETRO DE LA TUBERIA D=8" 1.00 0.00 0.00
DE REMOSION Y REPOSICION DE PAVIMENTO RIGIDO 1.00 2.40 2.40
CARPETA DE CONCRETO ASFALTICO 1.00 2.49 2.49
Cantidades
Total
266.70
57.55
49.85
2.40
43.64
0.00
238.15
0.00
21.88
1.00
7.00
0.00
0.00
0.00
258.30
53.91
184.44
171.77
57.55
39.45
PLANILLA DE AVANCE DE OBRA Nº 2
Proyecto: CONST. SISTEMA DE ALCANTARILLADO J.V. CALA CAJA DID
Contratante: G.A.M.O.
Ejecuta EMPRESA PEDESTAL S.R.L. 7/21/2019
CONTRATO AVANCE FISICO MONTO EN (Bs)
Item DESCRIPCION P.U. Total ANTERIOR ACTUAL ACUMULADO ANTERIOR ACTUAL ACUMULADO %
Unidad Cantidad
Bs. Bs.
1 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA m 3 0.00 831.50 266.70 1,098.20 2,494.50 800.10 3,294.60 #DIV/0!
2 RETIRO DE EMPEDRADO m² 3 0.00 686.53 57.55 744.08 2,059.59 172.65 2,232.24 #DIV/0!
3 CORTE DE ASFALTO ml 4.5 0.00 127.97 49.85 177.82 575.87 224.33 800.19 #DIV/0!
4 Demolición de HºAº m3 262.5 0.00 6.57 2.40 8.97 1,724.63 630.00 2,354.63 #DIV/0!
5 Excavación para Cámaras 0-2 m S/semiduro m3 46.1 0.00 71.84 115.48 187.32 3,311.82 5,323.63 8,635.45 #DIV/0!
6 Excavación para Cámaras 2-4 m S/semiduro c/agotamiento m3 111.8 0.00 28.92 43.64 72.56 3,233.26 4,878.95 8,112.21 #DIV/0!
7 Excavación de Zanja 0-2 m S/semiduro m3 40.5 0.00 847.74 43.64 891.38 34,333.47 1,767.42 36,100.89 #DIV/0!
8 Excavación de Zanja 2-4 m S/semiduro c/agotamiento m3 102.3 0.00 302.86 0.00 302.86 30,982.58 0.00 30,982.58 #DIV/0!
9 Asiento para tubería m3 25 0.00 66.67 21.88 88.55 1,666.75 547.00 2,213.75 #DIV/0!
10 Montado de CAMARA DE INSPECCIÓN de 0-2 m+Tapa de FF pza 690.7 0.00 2.00 1.00 3.00 1,381.40 690.70 2,072.10 #DIV/0!
12 Montado de CAMARA DE INSPECCIÓN de 0-2 m+Tapa de Hº Aº pza 600.5 0.00 10.00 7.00 17.00 6,005.00 4,203.50 10,208.50 #DIV/0!
11 Montado de CAMARA DE INSPECCIÓN de 2-4 m+Tapa de FF pza 789.5 0.00 2.00 0.00 2.00 1,579.00 0.00 1,579.00 #DIV/0!
14 ENTIBADO Y APUNTALADO de ZANJAS H<2 m. m² 26.2 0.00 692.95 0.00 692.95 18,155.29 0.00 18,155.29 #DIV/0!
15 Tendido de Tubo PVC D=8" m 15.3 0.00 499.20 0.00 499.20 7,637.76 0.00 7,637.76 #DIV/0!
16 Tendido de Tubo PVC D=10" m 20.45 0.00 311.50 258.30 569.80 6,370.18 5,282.24 11,652.41 #DIV/0!
18 Relleno y Compactado C(Material Seleccionado m³ 55 0.00 219.50 53.91 273.41 12,072.50 2,965.05 15,037.55 #DIV/0!
19 Compactado de Relleno Comun m³ 35 0.00 828.14 171.77 999.91 28,984.90 6,011.95 34,996.85 #DIV/0!
20 REPOSICION DE EMPEDRADO m² 15 0.00 686.53 57.55 744.08 10,297.95 863.25 11,161.20 #DIV/0!
21 Reposisicón de Hº Aº m3 240 0.00 6.57 2.40 8.97 1,576.80 576.00 2,152.80 #DIV/0!
22 Limpieza General m³ 1.2 0.00 283.00 39.45 322.45 339.60 47.34 386.94 #DIV/0!
Total Bs.= 0.00 Total Bs.= 174,782.83 34,984.10 209,766.94 #DIV/0!
TOLTAL
1.00
6.00
7.00
TTU
EJECUTA:EMPRESA PEDESTAL S.R.L
16 TENDIDO DE TUBO PVC D=8" Largo Parcial
C6-C7 1.00 46.30
C7-C8 1.00 50.80
C5-C11 1.00 71.70
C11-C10 1.00 27.60
C4-C13 1.00 55.80
C13-C12 1.00 21.70
C3- C15 1.00 44.90
C15-C14 1.00 28.90
C19´-C10 1.00 78.10
C17´-C14 1.00 28.10
C17-C16 1.00 45.30 499.20
98.24
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.
Medidas Cantidades
Ítem Descripción Und. Cant.
Largo Ancho Alto Parcial Total
3 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA
C2-C16 ML 1.00 89.10 89.10
C16-14 1.00 53.00 53.00
C14-C12 1.00 53.60 53.60
C12-C10 1.00 50.50 50.50
C10-C19´ 1.00 79.30 79.30
C17'-C14 1.00 29.70 29.70
C10- C9 1.00 46.50 46.50
C8-C9 1.00 26.00 26.00
C7-C8 1.00 52.00 52.00
C6-C7 1.00 47.50 47.50
C5-C11 1.00 72.90 72.90
C11-C10 1.00 28.80 28.80
C4-C13 1.00 57.00 57.00
C13-C12 1.00 22.90 22.90
C3- C15 1.00 46.10 46.10
C15-C14 1.00 30.10 30.10
C16-C17 1.00 46.50 46.50
C12-C18´ 1.00 40.50 40.50
C18´-C18 1.00 40.00 40.00
C18-C19" 1.00 32.20 32.20
C19"-C19 1.00 13.50 13.50
C19-C20 1.00 48.10 48.10
C20-20´ 1.00 52.40 52.40
C20´-CQ 1.00 40.00 40.00
1098.20
4 RETIRO DE EMPEDRADO
C2-C16 m2 1.00 87.10 0.90 78.39
C16-14 1.00 51.00 0.90 45.90
C14-C12 1.00 51.60 0.70 36.12
C12-C10 1.00 48.50 0.70 33.95
C9-C10 1.00 36.55 0.70 25.59
C10-C19 1.00 77.30 0.70 54.11
C17'-C14 1.00 27.70 0.70 19.39
C8-C9 1.00 0.10 0.70 0.07
C7-C8 1.00 50.00 0.70 35.00
C6-C7 1.00 45.50 0.70 31.85
C5-C11 1.00 70.90 0.70 49.63
C11-C10 1.00 26.80 0.70 18.76
C4-C13 1.00 55.00 0.70 38.50
C13-C12 1.00 20.90 0.70 14.63
C3- C15 1.00 44.10 0.70 30.87
C15-C14 1.00 28.10 0.70 19.67
C12-C18 1.00 78.50 0.70 54.95
C17-C16 1.00 44.50 0.70 31.15
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.
camaras
C2 1.00 2.00 2.00 4.00
C16 1.00 2.00 2.00 4.00
C14 1.00 2.00 2.00 4.00
C12 1.00 2.00 2.00 4.00
C10 1.00 2.00 2.00 4.00
C8 1.00 2.00 2.00 4.00
C7 1.00 2.00 2.00 4.00
C6 1.00 2.00 2.00 4.00
C19´ 1.00 2.00 2.00 4.00
C11 1.00 2.00 2.00 4.00
C5 1.00 2.00 2.00 4.00
C13 1.00 2.00 2.00 4.00
C4 1.00 2.00 2.00 4.00
C15 1.00 2.00 2.00 4.00
C3 1.00 2.00 2.00 4.00
C17´ 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
C18´ 1.00 2.00 2.00 4.00
744.08
7 CORTE DE ASFALTO
C2-C16 ML 1.00 82.50 0.90 74.25
C16-C14 1.00 4.30 0.90 3.87
C16-17 1.00 46.50 0.90 41.85
Camaras
C16 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
127.97
6 DEMOLICION DE Hº Aº
10.00
10 MONTADO DE CAMARA DE INSPECCIÓN DE 2-4 M +TAPA DE FF
C16 1.00 2.20 1.00
C2 1.00 2.78 1.00
2.00
14 ENTIBADO Y APUNTALADO PARA ZANJAS H<2.00 m.
C2-C16 2.00 87.10 2.59 451.18
C16-14 2.00 51.00 2.18 221.85
camaras
C2 2.00 2.00 2.78 11.12
C16 2.00 2.00 2.20 8.80
692.95
16 TENDIDO DE TUBO PVC D=8"
C6-C7 1.00 46.30 46.30
C7-C8 1.00 50.80 50.80
C5-C11 1.00 71.70 71.70
C11-C10 1.00 27.60 27.60
C4-C13 1.00 55.80 55.80
C13-C12 1.00 21.70 21.70
C3- C15 1.00 44.90 44.90
C15-C14 1.00 28.90 28.90
C19´-C10 1.00 78.10 78.10
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.
569.80
20 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
C2-C16 1.00 87.90 0.90 0.45 35.60
C16-14 1.00 51.80 0.90 0.45 20.98
C14-C12 1.00 52.40 0.70 0.45 16.51
C12-C10 1.00 49.30 0.70 0.45 15.53
C10- C9 1.00 45.30 0.70 0.45 14.27
C8-C9 1.00 24.80 0.70 0.45 7.81
C12-C18´ 1.00 39.30 0.70 0.45 12.38
C18´-C18 1.00 38.80 0.70 0.45 12.22
C18-C19" 1.00 31.00 0.70 0.45 9.77
C19"-C19 1.00 12.30 0.70 0.45 3.87
C19-C20 1.00 46.90 0.70 0.45 14.77
C20-20´ 1.00 51.20 0.70 0.45 16.13
C20´-CQ 1.00 38.80 0.70 0.45 12.22
MENOS EL DIAMETRO DE LA TUBERIA D=10" 311.50 -15.29
C6-C7 1.00 46.30 0.70 0.40 12.96
C7-C8 1.00 50.80 0.70 0.40 14.22
C5-C11 1.00 71.70 0.70 0.40 20.08
C11-C10 1.00 27.60 0.70 0.40 7.73
C4-C13 1.00 55.80 0.70 0.40 15.62
C13-C12 1.00 21.70 0.70 0.40 6.08
C3- C15 1.00 44.90 0.70 0.40 12.57
C15-C14 1.00 28.90 0.70 0.40 8.09
C19´-C10 1.00 78.10 0.70 0.40 21.87
C17´-C14 1.00 28.10 0.70 0.40 7.87
C17-C16 1.00 45.30 0.70 0.40 12.68
MENOS EL DIAMETRO DE LA TUBERIA D=8" 499.20 -15.68
300.86
21 COMPACTADO DE RELLENO COMUN
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.
Cámaras
1 C2 1.00 2.00 2.00 2.78 11.12
2 C16 1.00 2.00 2.00 2.20 8.80
3 C14 1.00 2.00 2.00 1.95 7.80
4 C12 1.00 2.00 2.00 1.46 5.84
5 C10 1.00 2.00 2.00 1.51 6.04
6 C9 1.00 2.00 2.00 1.41 5.64
7 C8 1.00 2.00 2.00 1.57 6.28
8 C7 1.00 2.00 2.00 1.30 5.20
9 C11 1.00 2.00 2.00 1.55 6.20
10 C13 1.00 2.00 2.00 1.55 6.20
11 C15 1.00 2.00 2.00 1.35 5.40
12 C19' 1.00 2.00 2.00 0.95 3.80
13 C17´ 1.00 2.00 2.00 1.35 5.40
14 C17 1.00 2.00 2.00 1.35 5.40
16 C18´ 1.00 2.00 2.00 0.95 3.80
17 C18 1.00 2.00 2.00 1.25 5.00
18 19" 1.00 2.00 2.00 1.35 5.40
19 19 1.00 2.00 2.00 1.25 5.00
20 20 1.00 2.00 2.00 1.25 5.00
21 20´ 1.00 2.00 2.00 1.35 5.40
22 Q 1.00 2.00 2.00 1.25 5.00
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.