COMPUTOS METRICOS TRAMO CIRCUNVALACION

Medidas Cantidades
Ítem Descripción Und. Cant.
Largo Ancho Alto Parcial
3 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA
C12-C18´ M 1.00 40.50 40.50
C18´-C18 1.00 40.00 40.00
C18-C19" 1.00 32.20 32.20
C19"-C19 1.00 13.50 13.50
C19-C20 1.00 48.10 48.10
C20-20´ 1.00 52.40 52.40
C20´-CQ 1.00 40.00 40.00

4 RETIRO DE EMPEDRADO
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
camaras
C18´ 1.00 2.00 2.00 4.00

7 CORTE DE ASFALTO
C16-17 1.00 46.50 0.90 41.85
Camaras
C16 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00

6 DEMOLICION DE Hº Aº

C19-C20 M3 1.00 3.80 0.70 0.25 0.67


C20- C20" M3 1.00 4.15 0.70 0.25 0.73
Camara
C20 M3 1.00 2.00 2.00 0.25 1.00

7 EXCAVACION PARA CAMARAS 0-2 M S/SEMIDURO


C12 1.00 2.00 2.00 1.56 6.24
C18´ 1.00 2.00 2.00 1.05 4.20
C18 1.00 2.00 2.00 1.35 5.40
C19" 1.00 2.00 2.00 1.45 5.80
C19 1.00 2.00 2.00 1.35 5.40
C20 1.00 2.00 2.00 1.35 5.40
C20´ 1.00 2.00 2.00 1.45 5.80
CQ 1.00 2.00 2.00 1.35 5.40

6 EXCAVACION PARA CAMARAS 2-4 M S/SEMIDURO C/AGOTAMIENTO


8 EXCAVACIÓN DE ZANJA 0-2 M S/SEMIDURO
C12-C18´ 1.00 38.50 0.70 1.31 35.17
C18´-C18 1.00 38.00 0.70 1.20 31.92
C18-C19" 1.00 30.20 0.70 1.40 29.60
C19"-C19 1.00 11.50 0.70 1.40 11.27
C19-C20 1.00 46.10 0.70 1.35 43.56
C20-20´ 1.00 50.40 0.70 1.40 49.39
C20´-CQ 1.00 38.00 0.70 1.40 37.24

EXCAVACIÓN DE ZANJA 2-4 M S/SEMIDURO C/AGOTAMIENTO

9 ASIENTO PARA TUBERIA


C12-C18´ ML 1.00 40.50 0.70 0.10 2.84
C18´-C18 1.00 40.00 0.70 0.10 2.80
C18-C19" 1.00 32.20 0.70 0.10 2.25
C19"-C19 1.00 13.50 0.70 0.10 0.95
C19-C20 1.00 48.10 0.70 0.10 3.37
C20-20´ 1.00 52.40 0.70 0.10 3.67
C20´-CQ 1.00 40.00 0.70 0.10 2.80
CAMARAS
C12 1.00 2.00 2.00 0.10 0.40
C18´ 1.00 2.00 2.00 0.10 0.40
C18 1.00 2.00 2.00 0.10 0.40
C19" 1.00 2.00 2.00 0.10 0.40
C19 1.00 2.00 2.00 0.10 0.40
C20 1.00 2.00 2.00 0.10 0.40
C20´ 1.00 2.00 2.00 0.10 0.40
CQ 1.00 2.00 2.00 0.10 0.40

10 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE FF


C20 1.00 1.25 1.00

10 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE HºAº


C12 1.00 1.46 1.00
C18´ 1.00 0.95 1.00
C18 1.00 1.25 1.00
C19" 1.00 1.35 1.00
C19 1.00 1.25 1.00
C20´ 1.00 1.35 1.00
CQ 1.00 1.25 1.00
10 MONTADO DE CAMARA DE INSPECCIÓN DE 2-4 M +TAPA DE FF

14 ENTIBADO Y APUNTALADO PARA ZANJAS H<2.00 m.

16 TENDIDO DE TUBO PVC D=8"

17 TENDIDO DE TUBERIA PVC D=10"


C12-C18´ 1.00 39.30 39.30
C18´-C18 1.00 38.80 38.80
C18-C19" 1.00 31.00 31.00
C19"-C19 1.00 12.30 12.30
C19-C20 1.00 46.90 46.90
C20-20´ 1.00 51.20 51.20
C20´-CQ 1.00 38.80 38.80

20 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO


C12-C18´ 1.00 39.30 0.70 0.45 12.38
C18´-C18 1.00 38.80 0.70 0.45 12.22
C18-C19" 1.00 31.00 0.70 0.45 9.77
C19"-C19 1.00 12.30 0.70 0.45 3.87
C19-C20 1.00 46.90 0.70 0.45
C20-20´ 1.00 51.20 0.70 0.45 16.13
C20´-CQ 1.00 38.80 0.70 0.45 12.22
MENOS EL DIAMETRO DE LA TUBERIA D=10" 258.30 -12.68

MENOS EL DIAMETRO DE LA TUBERIA D=8" 0.00 0.00


21 COMPACTADO DE RELLENO COMUN
C12-C18´ 1.00 39.30 0.70 0.76 20.77
C18´-C18 1.00 38.80 0.70 0.65 17.65
C18-C19" 1.00 31.00 0.70 0.85 18.45
C19"-C19 1.00 12.30 0.70 0.85 7.32
C19-C20 1.00 46.90 0.70 0.80 26.26
C20-20´ 1.00 51.20 0.70 0.85 30.46
C20´-CQ 1.00 38.80 0.70 0.85 23.09
Cámaras
C12 1.00 2.00 2.00 1.46 5.84
C18´ 1.00 2.00 2.00 0.95 3.80
C18 1.00 2.00 2.00 1.25 5.00
19" 1.00 2.00 2.00 1.35 5.40
19 1.00 2.00 2.00 1.25 5.00
20 1.00 2.00 2.00 1.25 5.00
20´ 1.00 2.00 2.00 1.35 5.40
Q 1.00 2.00 2.00 1.25 5.00

Menos Diametro de la Camara 8.00 -12.67

23 REPOSICION DE EMPEDRADO
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60

camaras
18´ 1.00 2.00 2.00 4.00

26 LIMPIEZA GENERAL
PROV. Y COLOC. GRAVA PARA ASIENTO M3 1.00 21.88 21.88
MENOS EL DIAMETRO DE LA TUBERIA D=10" 1.00 12.68 12.68
MENOS EL DIAMETRO DE LA TUBERIA D=8" 1.00 0.00 0.00
DE REMOSION Y REPOSICION DE PAVIMENTO RIGIDO 1.00 2.40 2.40
CARPETA DE CONCRETO ASFALTICO 1.00 2.49 2.49
Cantidades
Total

266.70

57.55

49.85

2.40

43.64
0.00

238.15

0.00

21.88

1.00
7.00

0.00

0.00

0.00

258.30
53.91

184.44

171.77

57.55

39.45
PLANILLA DE AVANCE DE OBRA Nº 2
Proyecto: CONST. SISTEMA DE ALCANTARILLADO J.V. CALA CAJA DID
Contratante: G.A.M.O.
Ejecuta EMPRESA PEDESTAL S.R.L. 7/21/2019
CONTRATO AVANCE FISICO MONTO EN (Bs)
Item DESCRIPCION P.U. Total ANTERIOR ACTUAL ACUMULADO ANTERIOR ACTUAL ACUMULADO %
Unidad Cantidad
Bs. Bs.
1 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA m 3 0.00 831.50 266.70 1,098.20 2,494.50 800.10 3,294.60 #DIV/0!
2 RETIRO DE EMPEDRADO m² 3 0.00 686.53 57.55 744.08 2,059.59 172.65 2,232.24 #DIV/0!
3 CORTE DE ASFALTO ml 4.5 0.00 127.97 49.85 177.82 575.87 224.33 800.19 #DIV/0!
4 Demolición de HºAº m3 262.5 0.00 6.57 2.40 8.97 1,724.63 630.00 2,354.63 #DIV/0!
5 Excavación para Cámaras 0-2 m S/semiduro m3 46.1 0.00 71.84 115.48 187.32 3,311.82 5,323.63 8,635.45 #DIV/0!
6 Excavación para Cámaras 2-4 m S/semiduro c/agotamiento m3 111.8 0.00 28.92 43.64 72.56 3,233.26 4,878.95 8,112.21 #DIV/0!
7 Excavación de Zanja 0-2 m S/semiduro m3 40.5 0.00 847.74 43.64 891.38 34,333.47 1,767.42 36,100.89 #DIV/0!
8 Excavación de Zanja 2-4 m S/semiduro c/agotamiento m3 102.3 0.00 302.86 0.00 302.86 30,982.58 0.00 30,982.58 #DIV/0!
9 Asiento para tubería m3 25 0.00 66.67 21.88 88.55 1,666.75 547.00 2,213.75 #DIV/0!
10 Montado de CAMARA DE INSPECCIÓN de 0-2 m+Tapa de FF pza 690.7 0.00 2.00 1.00 3.00 1,381.40 690.70 2,072.10 #DIV/0!
12 Montado de CAMARA DE INSPECCIÓN de 0-2 m+Tapa de Hº Aº pza 600.5 0.00 10.00 7.00 17.00 6,005.00 4,203.50 10,208.50 #DIV/0!
11 Montado de CAMARA DE INSPECCIÓN de 2-4 m+Tapa de FF pza 789.5 0.00 2.00 0.00 2.00 1,579.00 0.00 1,579.00 #DIV/0!
14 ENTIBADO Y APUNTALADO de ZANJAS H<2 m. m² 26.2 0.00 692.95 0.00 692.95 18,155.29 0.00 18,155.29 #DIV/0!
15 Tendido de Tubo PVC D=8" m 15.3 0.00 499.20 0.00 499.20 7,637.76 0.00 7,637.76 #DIV/0!
16 Tendido de Tubo PVC D=10" m 20.45 0.00 311.50 258.30 569.80 6,370.18 5,282.24 11,652.41 #DIV/0!
18 Relleno y Compactado C(Material Seleccionado m³ 55 0.00 219.50 53.91 273.41 12,072.50 2,965.05 15,037.55 #DIV/0!
19 Compactado de Relleno Comun m³ 35 0.00 828.14 171.77 999.91 28,984.90 6,011.95 34,996.85 #DIV/0!
20 REPOSICION DE EMPEDRADO m² 15 0.00 686.53 57.55 744.08 10,297.95 863.25 11,161.20 #DIV/0!
21 Reposisicón de Hº Aº m3 240 0.00 6.57 2.40 8.97 1,576.80 576.00 2,152.80 #DIV/0!
22 Limpieza General m³ 1.2 0.00 283.00 39.45 322.45 339.60 47.34 386.94 #DIV/0!
Total Bs.= 0.00 Total Bs.= 174,782.83 34,984.10 209,766.94 #DIV/0!

Son: Seiscientos cinco mil quinientos sesenta y un 27/100 Bolivianos


R E S U M E N
MONTO DE CONTRATO 0.00
PLANILLA DE AVANCE ANTERIOR 174,782.83
PLANILLA DE AVANCE N° 2 34,984.10
ACUMULADO PLANILLAS 209,766.94
DESCUENTO ANTICIPO 0,00 % (según contrato no fue considerado) 0.00
PORCENTAJE (%) DEL AVANCE ACTUAL #DIV/0!
PORCENTAJE (%) DEL AVANCE ACUMULADO #DIV/0!
LIQUIDO PAGABLE PLANILLA Nº 2 34,984.10

Fotografias para proyecto Cala Caja DID


Equipo
Descripción Und P.U. Bs/hrs
Retroexcavadora Hrs 230
Volqueta Hrs 80
Compactadora Hrs 40
Motobomba lamera Hrs 40
Martillo Neumatico +Compresora Hrs 230
Vibradora Hrs 25
Mano de Obra
todos los items
CATIDAD DE CAMARAS TRAMO CIRCUNLVALACION
1 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE FF
C20 1.00 1.25 1.00

2 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE HºAº


C18´ 1.00 0.95 1.00
C18 1.00 1.25 1.00
C19" 1.00 1.35 1.00
C19 1.00 1.25 1.00
C20´ 1.00 1.35 1.00
CQ 1.00 1.25 1.00

TOLTAL
1.00

6.00
7.00
TTU
EJECUTA:EMPRESA PEDESTAL S.R.L
16 TENDIDO DE TUBO PVC D=8" Largo Parcial
C6-C7 1.00 46.30
C7-C8 1.00 50.80
C5-C11 1.00 71.70
C11-C10 1.00 27.60
C4-C13 1.00 55.80
C13-C12 1.00 21.70
C3- C15 1.00 44.90
C15-C14 1.00 28.90
C19´-C10 1.00 78.10
C17´-C14 1.00 28.10
C17-C16 1.00 45.30 499.20

17 TENDIDO DE TUBERIA PVC D=10" Largo Parcial


CI2-CI16 1.00 87.90
CI16-CI14 1.00 51.80
CI14-CI12 1.00 52.40
CI12-CI10 1.00 49.30
CI10-CI9 1.00 45.30
CI9-CI8 1.00 24.80
C12-C18´ 1.00 39.30
C18´-C18 1.00 38.80
C18-C19" 1.00 31.00
C19"-C19 1.00 12.30
C19-C20 1.00 46.90
C20-20´ 1.00 51.20
C20´-CQ 1.00 38.80 569.80

EJECUTA:EMPRESA PEDESTAL S.R.L

TUBERIA PVC 8" TUBERIA PVC 10" TOTAL.CAMARAS


CANTIDAD
86 99 21
TOTAL
CONST. SISTEMA DE ALCANTARILLADO J.V. CALA CAJA DID
86.07

98.24
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

Medidas Cantidades
Ítem Descripción Und. Cant.
Largo Ancho Alto Parcial Total
3 REPLANTEO Y CONTROL DE LÍNEAS DE TUBERÍA
C2-C16 ML 1.00 89.10 89.10
C16-14 1.00 53.00 53.00
C14-C12 1.00 53.60 53.60
C12-C10 1.00 50.50 50.50
C10-C19´ 1.00 79.30 79.30
C17'-C14 1.00 29.70 29.70
C10- C9 1.00 46.50 46.50
C8-C9 1.00 26.00 26.00
C7-C8 1.00 52.00 52.00
C6-C7 1.00 47.50 47.50
C5-C11 1.00 72.90 72.90
C11-C10 1.00 28.80 28.80
C4-C13 1.00 57.00 57.00
C13-C12 1.00 22.90 22.90
C3- C15 1.00 46.10 46.10
C15-C14 1.00 30.10 30.10
C16-C17 1.00 46.50 46.50
C12-C18´ 1.00 40.50 40.50
C18´-C18 1.00 40.00 40.00
C18-C19" 1.00 32.20 32.20
C19"-C19 1.00 13.50 13.50
C19-C20 1.00 48.10 48.10
C20-20´ 1.00 52.40 52.40
C20´-CQ 1.00 40.00 40.00
1098.20
4 RETIRO DE EMPEDRADO
C2-C16 m2 1.00 87.10 0.90 78.39
C16-14 1.00 51.00 0.90 45.90
C14-C12 1.00 51.60 0.70 36.12
C12-C10 1.00 48.50 0.70 33.95
C9-C10 1.00 36.55 0.70 25.59
C10-C19 1.00 77.30 0.70 54.11
C17'-C14 1.00 27.70 0.70 19.39
C8-C9 1.00 0.10 0.70 0.07
C7-C8 1.00 50.00 0.70 35.00
C6-C7 1.00 45.50 0.70 31.85
C5-C11 1.00 70.90 0.70 49.63
C11-C10 1.00 26.80 0.70 18.76
C4-C13 1.00 55.00 0.70 38.50
C13-C12 1.00 20.90 0.70 14.63
C3- C15 1.00 44.10 0.70 30.87
C15-C14 1.00 28.10 0.70 19.67
C12-C18 1.00 78.50 0.70 54.95
C17-C16 1.00 44.50 0.70 31.15
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

camaras
C2 1.00 2.00 2.00 4.00
C16 1.00 2.00 2.00 4.00
C14 1.00 2.00 2.00 4.00
C12 1.00 2.00 2.00 4.00
C10 1.00 2.00 2.00 4.00
C8 1.00 2.00 2.00 4.00
C7 1.00 2.00 2.00 4.00
C6 1.00 2.00 2.00 4.00
C19´ 1.00 2.00 2.00 4.00
C11 1.00 2.00 2.00 4.00
C5 1.00 2.00 2.00 4.00
C13 1.00 2.00 2.00 4.00
C4 1.00 2.00 2.00 4.00
C15 1.00 2.00 2.00 4.00
C3 1.00 2.00 2.00 4.00
C17´ 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
C18´ 1.00 2.00 2.00 4.00

744.08
7 CORTE DE ASFALTO
C2-C16 ML 1.00 82.50 0.90 74.25
C16-C14 1.00 4.30 0.90 3.87
C16-17 1.00 46.50 0.90 41.85

Camaras
C16 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
127.97
6 DEMOLICION DE Hº Aº

C8-C9 M3 1.00 23.90 0.70 0.25 4.18


C9- C10 M3 1.00 7.96 0.70 0.25 1.39
C19-C20 M3 1.00 3.80 0.70 0.25 0.67
C20- C20" M3 1.00 4.15 0.70 0.25 0.73
Camara
C9 M3 1.00 2.00 2.00 0.25 1.00
C20 M3 1.00 2.00 2.00 0.25 1.00
8.97
7 EXCAVACION PARA CAMARAS 0-2 M S/SEMIDURO
C12 1.00 2.00 2.00 1.56 6.24
C10 1.00 2.00 2.00 1.61 6.44
C9 1.00 2.00 2.00 1.51 6.04
C8 1.00 2.00 2.00 1.67 6.68
C7 1.00 2.00 2.00 1.40 5.60
C11 1.00 2.00 2.00 1.65 6.60
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

C13 1.00 2.00 2.00 1.65 6.60


C15 1.00 2.00 2.00 1.45 5.80
C20 1.00 2.00 2.00 1.51 6.04
C19´ 1.00 2.00 2.00 1.05 4.20
C17´ 1.00 2.00 2.00 1.45 5.80
C17´ 1.00 2.00 2.00 1.45 5.80
C12 1.00 2.00 2.00 1.56 6.24
C18´ 1.00 2.00 2.00 1.05 4.20
C18 1.00 2.00 2.00 1.35 5.40
C19" 1.00 2.00 2.00 1.45 5.80
C19 1.00 2.00 2.00 1.35 5.40
C20 1.00 2.00 2.00 1.35 5.40
C20´ 1.00 2.00 2.00 1.45 5.80
CQ 1.00 2.00 2.00 1.35 5.40
115.48
6 EXCAVACION PARA CAMARAS 2-4 M S/SEMIDURO C/AGOTAMIENTO

C2 1.00 2.00 2.00 2.88 11.52


C16 1.00 2.00 2.00 2.30 9.20
C14 1.00 2.00 2.00 2.05 8.20
28.92
8 EXCAVACIÓN DE ZANJA 0-2 M S/SEMIDURO
C14-C12 1.00 51.60 0.70 1.81 65.20
C12-C10 1.00 48.50 0.70 1.59 53.81
C10-C19 1.00 77.30 0.70 1.61 87.12
C10- C9 1.00 44.50 0.70 1.56 48.59
C8-C9 1.00 24.00 0.70 1.59 26.71
C7-C8 1.00 50.00 0.70 1.54 53.73
C6-C7 1.00 45.50 0.70 1.40 44.59
C5-C11 1.00 70.90 0.70 1.65 81.89
C11-C10 1.00 26.80 0.70 1.75 32.83
C4-C13 1.00 55.00 0.70 1.67 64.10
C13-C12 1.00 20.90 0.70 1.61 23.48
C3-C15 1.00 44.10 0.70 1.55 47.85
C15-C14 1.00 44.10 0.70 1.75 54.02
C10-C19´ 1.00 77.30 0.70 1.33 71.97
C14-C17´ 1.00 27.30 0.70 1.75 33.44
C17-C16 1.00 44.50 0.70 1.88 58.41
C12-C18´ 1.00 38.50 0.70 1.31 35.17
C18´-C18 1.00 38.00 0.70 1.20 31.92
C18-C19" 1.00 30.20 0.70 1.40 29.60
C19"-C19 1.00 11.50 0.70 1.40 11.27
C19-C20 1.00 46.10 0.70 1.35 43.56
C20-20´ 1.00 50.40 0.70 1.40 49.39
C20´-CQ 1.00 38.00 0.70 1.40 37.24
1085.89
EXCAVACIÓN DE ZANJA 2-4 M S/SEMIDURO C/AGOTAMIENTO
C2-C16 1.00 87.10 0.90 2.59 203.03
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

C16-14 1.00 51.00 0.90 2.18 99.83


302.86
9 ASIENTO PARA TUBERIA
C2-C16 ML 1.00 89.10 0.90 0.10 8.02
C16-14 1.00 53.00 0.90 0.10 4.77
C14-C12 1.00 53.60 0.70 0.10 3.75
C12-C10 1.00 50.50 0.70 0.10 3.54
C10-C19´ 1.00 79.30 0.70 0.10 5.55
C17'-C14 1.00 29.70 0.70 0.10 2.08
C10- C9 1.00 46.50 0.70 0.10 3.26
C8-C9 1.00 26.00 0.70 0.10 1.82
C7-C8 1.00 52.00 0.70 0.10 3.64
C6-C7 1.00 47.50 0.70 0.10 3.33
C5-C11 1.00 72.90 0.70 0.10 5.10
C11-C10 1.00 28.80 0.70 0.10 2.02
C4-C13 1.00 57.00 0.70 0.10 3.99
C13-C12 1.00 22.90 0.70 0.10 1.60
C3- C15 1.00 46.10 0.70 0.10 3.23
C15-C14 1.00 30.10 0.70 0.10 2.11
C16-C17 1.00 46.50 0.70 0.10 3.26
C12-C18´ 1.00 40.50 0.70 0.10 2.84
C18´-C18 1.00 40.00 0.70 0.10 2.80
C18-C19" 1.00 32.20 0.70 0.10 2.25
C19"-C19 1.00 13.50 0.70 0.10 0.95
C19-C20 1.00 48.10 0.70 0.10 3.37
C20-20´ 1.00 52.40 0.70 0.10 3.67
C20´-CQ 1.00 40.00 0.70 0.10 2.80
CAMARAS
C2 1.00 2.00 2.00 0.10 0.40
C16 1.00 2.00 2.00 0.10 0.40
C14 1.00 2.00 2.00 0.10 0.40
C12 1.00 2.00 2.00 0.10 0.40
C10 1.00 2.00 2.00 0.10 0.40
C9 1.00 2.00 2.00 0.10 0.40
C8 1.00 2.00 2.00 0.10 0.40
C7 1.00 2.00 2.00 0.10 0.40
C11 1.00 2.00 2.00 0.10 0.40
C13 1.00 2.00 2.00 0.10 0.40
C15 1.00 2.00 2.00 0.10 0.40
C19' 1.00 2.00 2.00 0.10 0.40
C17´ 1.00 2.00 2.00 0.10 0.40
C17 1.00 2.00 2.00 0.10 0.40
C12 1.00 2.00 2.00 0.10 0.40
C18´ 1.00 2.00 2.00 0.10 0.40
C18 1.00 2.00 2.00 0.10 0.40
C19" 1.00 2.00 2.00 0.10 0.40
C19 1.00 2.00 2.00 0.10 0.40
C20 1.00 2.00 2.00 0.10 0.40
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

C20´ 1.00 2.00 2.00 0.10 0.40


CQ 1.00 2.00 2.00 0.10 0.40
88.55
10 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE FF
C9 1.00 1.41 1.00
C17 1.00 1.35 1.00
C20 1.00 1.25 1.00
3.00
10 MONTADO DE CAMARA DE INSPECCIÓN DE 0-2 M +TAPA DE HºAº
C14 1.00 1.95 1.00
C12 1.00 1.46 1.00
C10 1.00 1.51 1.00
C8 1.00 1.57 1.00
C7 1.00 1.30 1.00
C11 1.00 1.55 1.00
C13 1.00 1.55 1.00
C15 1.00 1.35 1.00
C19´ 1.00 0.95 1.00
C17´ 1.00 1.35 1.00
C12 1.00 1.46 1.00
C18´ 1.00 0.95 1.00
C18 1.00 1.25 1.00
C19" 1.00 1.35 1.00
C19 1.00 1.25 1.00
C20´ 1.00 1.35 1.00
CQ 1.00 1.25 1.00

10.00
10 MONTADO DE CAMARA DE INSPECCIÓN DE 2-4 M +TAPA DE FF
C16 1.00 2.20 1.00
C2 1.00 2.78 1.00
2.00
14 ENTIBADO Y APUNTALADO PARA ZANJAS H<2.00 m.
C2-C16 2.00 87.10 2.59 451.18
C16-14 2.00 51.00 2.18 221.85
camaras
C2 2.00 2.00 2.78 11.12
C16 2.00 2.00 2.20 8.80
692.95
16 TENDIDO DE TUBO PVC D=8"
C6-C7 1.00 46.30 46.30
C7-C8 1.00 50.80 50.80
C5-C11 1.00 71.70 71.70
C11-C10 1.00 27.60 27.60
C4-C13 1.00 55.80 55.80
C13-C12 1.00 21.70 21.70
C3- C15 1.00 44.90 44.90
C15-C14 1.00 28.90 28.90
C19´-C10 1.00 78.10 78.10
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

C17´-C14 1.00 28.10 28.10


C17-C16 1.00 45.30 45.30
499.20
17 TENDIDO DE TUBERIA PVC D=10"
CI2-CI16 1.00 87.90 87.90
CI16-CI14 1.00 51.80 51.80
CI14-CI12 1.00 52.40 52.40
CI12-CI10 1.00 49.30 49.30
CI10-CI9 1.00 45.30 45.30
CI9-CI8 1.00 24.80 24.80
C12-C18´ 1.00 39.30 39.30
C18´-C18 1.00 38.80 38.80
C18-C19" 1.00 31.00 31.00
C19"-C19 1.00 12.30 12.30
C19-C20 1.00 46.90 46.90
C20-20´ 1.00 51.20 51.20
C20´-CQ 1.00 38.80 38.80

569.80
20 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
C2-C16 1.00 87.90 0.90 0.45 35.60
C16-14 1.00 51.80 0.90 0.45 20.98
C14-C12 1.00 52.40 0.70 0.45 16.51
C12-C10 1.00 49.30 0.70 0.45 15.53
C10- C9 1.00 45.30 0.70 0.45 14.27
C8-C9 1.00 24.80 0.70 0.45 7.81
C12-C18´ 1.00 39.30 0.70 0.45 12.38
C18´-C18 1.00 38.80 0.70 0.45 12.22
C18-C19" 1.00 31.00 0.70 0.45 9.77
C19"-C19 1.00 12.30 0.70 0.45 3.87
C19-C20 1.00 46.90 0.70 0.45 14.77
C20-20´ 1.00 51.20 0.70 0.45 16.13
C20´-CQ 1.00 38.80 0.70 0.45 12.22
MENOS EL DIAMETRO DE LA TUBERIA D=10" 311.50 -15.29
C6-C7 1.00 46.30 0.70 0.40 12.96
C7-C8 1.00 50.80 0.70 0.40 14.22
C5-C11 1.00 71.70 0.70 0.40 20.08
C11-C10 1.00 27.60 0.70 0.40 7.73
C4-C13 1.00 55.80 0.70 0.40 15.62
C13-C12 1.00 21.70 0.70 0.40 6.08
C3- C15 1.00 44.90 0.70 0.40 12.57
C15-C14 1.00 28.90 0.70 0.40 8.09
C19´-C10 1.00 78.10 0.70 0.40 21.87
C17´-C14 1.00 28.10 0.70 0.40 7.87
C17-C16 1.00 45.30 0.70 0.40 12.68
MENOS EL DIAMETRO DE LA TUBERIA D=8" 499.20 -15.68
300.86
21 COMPACTADO DE RELLENO COMUN
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

C2-C16 1.00 87.90 0.90 2.04 161.38


C16-14 1.00 51.80 0.90 1.63 75.76
C14-C12 1.00 52.40 0.70 1.26 46.03
C12-C10 1.00 49.30 0.70 1.04 35.72
C10- C9 1.00 45.30 0.70 1.01 32.03
C8-C9 1.00 24.80 0.70 1.04 18.05
C6-C7 1.00 46.30 0.70 1.21 39.22
C7-C8 1.00 50.80 0.70 1.04 36.80
C5-C11 1.00 71.70 0.70 1.20 60.23
C11-C10 1.00 27.60 0.70 1.13 21.83
C4-C13 1.00 55.80 0.70 1.17 45.50
C13-C12 1.00 21.70 0.70 1.11 16.78
C3- C15 1.00 44.90 0.70 1.05 33.00
C15-C14 1.00 28.90 0.70 1.25 25.29
C19´-C10 1.00 78.10 0.70 0.83 45.38
C17´-C14 1.00 28.10 0.70 1.25 24.59
C17-C16 1.00 45.30 0.70 1.38 43.60
C12-C18´ 1.00 39.30 0.70 0.76 20.77
C18´-C18 1.00 38.80 0.70 0.65 17.65
C18-C19" 1.00 31.00 0.70 0.85 18.45
C19"-C19 1.00 12.30 0.70 0.85 7.32
C19-C20 1.00 46.90 0.70 0.80 26.26
C20-20´ 1.00 51.20 0.70 0.85 30.46
C20´-CQ 1.00 38.80 0.70 0.85 23.09

Cámaras
1 C2 1.00 2.00 2.00 2.78 11.12
2 C16 1.00 2.00 2.00 2.20 8.80
3 C14 1.00 2.00 2.00 1.95 7.80
4 C12 1.00 2.00 2.00 1.46 5.84
5 C10 1.00 2.00 2.00 1.51 6.04
6 C9 1.00 2.00 2.00 1.41 5.64
7 C8 1.00 2.00 2.00 1.57 6.28
8 C7 1.00 2.00 2.00 1.30 5.20
9 C11 1.00 2.00 2.00 1.55 6.20
10 C13 1.00 2.00 2.00 1.55 6.20
11 C15 1.00 2.00 2.00 1.35 5.40
12 C19' 1.00 2.00 2.00 0.95 3.80
13 C17´ 1.00 2.00 2.00 1.35 5.40
14 C17 1.00 2.00 2.00 1.35 5.40
16 C18´ 1.00 2.00 2.00 0.95 3.80
17 C18 1.00 2.00 2.00 1.25 5.00
18 19" 1.00 2.00 2.00 1.35 5.40
19 19 1.00 2.00 2.00 1.25 5.00
20 20 1.00 2.00 2.00 1.25 5.00
21 20´ 1.00 2.00 2.00 1.35 5.40
22 Q 1.00 2.00 2.00 1.25 5.00
PROYECTO: CONSTRUCCIÓN SISTEMA DE ALCANTARILLADO
COMPUTOS CALA
METRICOS
CAJA DID
Nº 1
EJECUTA: EMPRESA PEDESTAL S.R.L.

Menos Diametro de la Camara 21.00 -33.26


995.65
23 REPOSICION DE EMPEDRADO
C2-C16 m2 1.00 87.10 0.90 78.39
C16-14 1.00 51.00 0.90 45.90
C14-C12 1.00 51.60 0.70 36.12
C12-C10 1.00 48.50 0.70 33.95
C9-C10 1.00 36.55 0.70 25.59
C10-C19 1.00 77.30 0.70 54.11
C17'-C14 1.00 27.70 0.70 19.39
C8-C9 1.00 0.10 0.70 0.07
C7-C8 1.00 50.00 0.70 35.00
C6-C7 1.00 45.50 0.70 31.85
C5-C11 1.00 70.90 0.70 49.63
C11-C10 1.00 26.80 0.70 18.76
C4-C13 1.00 55.00 0.70 38.50
C13-C12 1.00 20.90 0.70 14.63
C3- C15 1.00 44.10 0.70 30.87
C15-C14 1.00 28.10 0.70 19.67
C12-C18´ 1.00 38.50 0.70 26.95
C18´-C18 1.00 38.00 0.70 26.60
camaras
C2 1.00 2.00 2.00 4.00
C16 1.00 2.00 2.00 4.00
C14 1.00 2.00 2.00 4.00
C12 1.00 2.00 2.00 4.00
C10 1.00 2.00 2.00 4.00
C8 1.00 2.00 2.00 4.00
C7 1.00 2.00 2.00 4.00
C6 1.00 2.00 2.00 4.00
C19´ 1.00 2.00 2.00 4.00
C11 1.00 2.00 2.00 4.00
C5 1.00 2.00 2.00 4.00
C13 1.00 2.00 2.00 4.00
C4 1.00 2.00 2.00 4.00
C15 1.00 2.00 2.00 4.00
C3 1.00 2.00 2.00 4.00
C17´ 1.00 2.00 2.00 4.00
C17 1.00 2.00 2.00 4.00
18´ 1.00 2.00 2.00 4.00
657.98
26 LIMPIEZA GENERAL
PROV. Y COLOC. GRAVA PARA ASIENTO M3 1.00 88.55 88.55
MENOS EL DIAMETRO DE LA TUBERIA D=10" 1.00 15.29 15.29
MENOS EL DIAMETRO DE LA TUBERIA D=8" 1.00 15.68 15.68
DE REMOSION Y REPOSICION DE PAVIMENTO RIGIDO 1.00 8.97 8.97
CARPETA DE CONCRETO ASFALTICO 1.00 6.40 6.40
134.89