Company Manager Subject Author Title Project Project Start

Project Project Finish Work Baseline Work Actual Work Work Variance
Remaining Work Cost Baseline Cost Actual Cost Fixed Cost Cost
Variance Remaining Cost BCWP BCWS SV Name Notes WBS Constraint Type
Constraint Date Critical Delay Free Slack Total Slack ID Milestone
Priority Subproject Baseline Duration Actual Duration Duration
Duration Variance Remaining Duration Percent Complete Percent Work
Complete Start Finish Early Start Early Finish Late Start Late Finish
Actual Start Actual Finish Baseline Start Baseline Finish Start
Variance Finish Variance Predecessors Successors Resource Names
Resource Initials Text1 Start1 Finish1 Text2 Start2 Finish2
Text3 Start3 Finish3 Text4 Start4 Finish4 Text5 Start5
Finish5 Text6 Text7 Text8 Text9 Text10 Marked Flag1 Flag2 Flag3
Flag4 Flag5 Flag6 Flag7 Flag8 Flag9 Flag10 Rollup CV Project
Outline Level Unique ID Number1 Number2 Number3 Number4
Number5 Summary Created Unique ID Predecessors Unique ID
Successors Objects Linked Fields Resume Stop Resume No Earlier Than
Outline Number Duration1 Duration2 Duration3 Cost1 Cost2 Cost3 Hide
Bar Confirmed Update Needed Contact Resource Group ACWP Type
Recurring Effort Driven Overtime Work Actual Overtime Work
Remaining Overtime Work Regular Work Overtime Cost Actual Overtime
Cost Remaining Overtime Cost Fixed Cost Accrual Hyperlink Hyperlink Address
Hyperlink SubAddress Hyperlink Href Assignment Overallocated
External Task Subproject Read Only Response Pending TeamStatus Pending
Leveling Can Split Level Assignments Work Contour Cost4 Cost5 Cost6
Cost7 Cost8 Cost9 Cost10 Date1 Date2 Date3 Date4 Date5 Date6 Date7 Date8
Date9 Date10 Duration4 Duration5 Duration6 Duration7 Duration8
Duration9 Duration10 Start6 Finish6 Start7 Finish7 Start8
Finish8 Start9 Finish9 Start10 Finish10 Flag11 Flag12
Flag13 Flag14 Flag15 Flag16 Flag17 Flag18 Flag19
Flag20 Number6 Number7 Number8 Number9 Number10
Number11 Number12 Number13 Number14 Number15 Number16
Number17 Number18 Number19 Number20 Text11 Text12 Text13
Text14 Text15 Text16 Text17 Text18 Text19 Text20
Text21 Text22 Text23 Text24 Text25 Text26 Text27
Text28 Text29 Text30 Assignment Delay Assignment Units Cost
Rate Table Preleveled Start Preleveled Finish WBS Predecessors WBS Successors
Deadline Outline Code1 Outline Code2 Outline Code3 Outline
Code4 Outline Code5 Outline Code6 Outline Code7 Outline Code8
Outline Code9 Outline Code10 Status Physical Percent Complete
SVPercent CVPercent Calendar
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Contrucci�n del �rea de
Admisi�n de la cl�nica San Juan Bautista 1 Lo antes posible S�
0d 0d 0d 1 No M�nima 158.22d -1,035.05d 163d
4.78d 1,198.05d -635% 0% 01/02/2020 12/07/2020 01/02/2020 12/07/2020
03/02/2020 12/07/2020 30/05/2019 03/02/2020 247d 160.11d

No No No No
No No No No No No No No S/ 0.00 1 5
0.00 0.00 0.00 0.00 0.00 S� 0 No
1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No No No
S/ 0.00 Unidades fijas No S� 0h 0h 0h 0h S/
0.00 S/ 0.00 S/ 0.00 Prorrateo No No No
No No No No No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No No No No No
No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0d 0% A

0% 0% 0% Project Default (Standard)


WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Gesti�n del Proyecto
1.1 Lo antes posible No 0d 2d 2d 2 No M�nima
158.22d 38,685.87d 9d -149.22d -38,676.87d 429843% 0%
01/02/2020 09/02/2020 01/02/2020 09/02/2020 03/02/2020 12/07/2020
30/05/2019 03/02/2020 247d 6.11d

No No No No No No No No No No No
No S/ 0.00 2 8 0.000.00 0.00 0.00 0.00 S�
0 No 1.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Acta de Constituci�n
1.1.1 Lo antes posible No 0d 160d 160d 3 No M�nima
1.78d 0d 3d 1.22d 3d 0% 0% 01/02/2020 03/02/2020 01/02/2020
03/02/2020 11/07/2020 12/07/2020 31/01/2020 03/02/2020 1d
0.11d
No No
No No No No No No No No No No S/ 0.00
3 14 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.1.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No
No No S/ 0.00 Unidades fijas No S� 0h 0h
0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Reuni�n con gerencia
1.1.1.1 No finalizar antes del 01/02/2020 No 0d 162d 162d 4
No M�nima 0.89d 0d 1d 0.11d 1d 0% 0% 01/02/2020
01/02/2020 01/02/2020 01/02/2020 12/07/2020 12/07/2020
31/01/2020 31/01/2020 1d 1.11d

No No No No No No No No No No No
No S/ 0.00 4 89 0.00 0.00 0.00 0.00 0.00 No
0 No 1.1.1.1 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Elaborar acta
1.1.1.2 No finalizar antes del 02/02/2020 No 0d 161d 161d 5
No M�nima 0.89d 0d 2d 1.11d 2d 0% 0% 01/02/2020
02/02/2020 01/02/2020 02/02/2020 11/07/2020 12/07/2020
02/02/2020 03/02/2020 -1.56d -0.89d

No No No No No No No No No
No No No S/ 0.00 4 90 0.00 0.00 0.00 0.00 0.00
No 0 No 1.1.1.2 0d 0d
0d S/ 0.00 S/ 0.00 S/ 0.00 No No No S/
0.00 Unidades fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00
S/ 0.00 Prorrateo No No No No No
No No No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No No No No No No No
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
0d 0% A

0% 0% 0% Project Default (Standard)


WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisar Acta
1.1.1.3 No finalizar antes del 03/02/2020 No 0d 160d 160d 6
No M�nima 0.89d 0d 2d 1.11d 1d 0% 0% 02/02/2020
03/02/2020 02/02/2020 03/02/2020 11/07/2020 12/07/2020
03/02/2020 03/02/2020 -1d 0.11d

No No No No No No No No No No No
No S/ 0.00 4 91 0.00 0.00 0.00 0.00 0.00 No
0 No 1.1.1.3 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Cronograma del Proyecto
1.1.2 Lo antes posible S� 0d 0d 0d 7 No M�nima
0.89d 0d 1d 0.11d 1d 0% 0% 03/02/2020 03/02/2020 03/02/2020
03/02/2020 03/02/2020 12/07/2020 30/05/2019 30/05/2019 249d
249.11d
No
No No No No No No No No No No No S/ 0.00
3 13 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No
No No S/ 0.00 Unidades fijas No S� 0h 0h
0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definici�n de tiempos
1.1.2.1 Debe finalizar el 03/02/2020 S� 0d 0d 0d 8 No
M�nima 0d 0d 1d 1d 3,288d 0% 0% 03/02/2020
03/02/2020 03/02/2020 03/02/2020 03/02/2020 03/02/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
4 93 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Elaboraci�n de cronograma
1.1.2.2 No comenzar antes del 03/02/2020 No 0d 160d 160d 9
No M�nima 0d 0d 1d 1d 0d 0% 0% 03/02/2020
03/02/2020 03/02/2020 03/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
4 94 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Riesgos 1.1.3 Lo
antes posible No 0d 157d 157d 10 No M�nima 0.89d
0d 3d 2.11d 3d 0% 0% 04/02/2020 06/02/2020 04/02/2020
06/02/2020 12/07/2020 12/07/2020 30/05/2019 30/05/2019 250d
252.11d
No
No No No No No No No No No No No S/ 0.00
3 12 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.1.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No
No No S/ 0.00 Unidades fijas No S� 0h 0h
0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Riesgos internos
1.1.3.1 Lo antes posible No 0d 158d 158d 11 No M�nima
0.89d 0d 2d 1.11d 2d 0% 0% 04/02/2020 05/02/2020
04/02/2020 05/02/2020 12/07/2020 12/07/2020 30/05/2019
30/05/2019 250d 251.11d

No No No No No No No No No No No No
S/ 0.00 4 25 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.3.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Recopilar informaci�n
1.1.3.1.1 No comenzar antes del 04/02/2020 No 0d 159d 159d 12
No M�nima 0d 0d 1d 1d 0d 0% 0% 04/02/2020
04/02/2020 04/02/2020 04/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 96 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.3.1.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Elaborar informe de riesgos
internos 1.1.3.1.2 No comenzar antes del 05/02/2020 No 0d 158d
158d 13 No M�nima 0d 0d 1d 1d 0d 0% 0%
05/02/2020 05/02/2020 05/02/2020 05/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 97 0.00 0.00 0.00 0.00 0.00 No 0
No 1.1.3.1.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Riesgos externos
1.1.3.2 Lo antes posible No 0d 157d 157d 14 No M�nima
0.89d 0d 1d 0.11d 1d 0% 0% 06/02/2020 06/02/2020
06/02/2020 06/02/2020 12/07/2020 12/07/2020 30/05/2019
30/05/2019 252d 252.11d

No No No No No No No No No No No No
S/ 0.00 4 24 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.3.2 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Recopilar informaci�n
1.1.3.2.1 No comenzar antes del 06/02/2020 No 0d 157d 157d 15
No M�nima 0d 0d 1d 1d 0d 0% 0% 06/02/2020
06/02/2020 06/02/2020 06/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 98 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.3.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Eleborar informe de riesgos
externos 1.1.3.2.2 No comenzar antes del 06/02/2020 No 0d 157d
157d 16 No M�nima 0d 0d 1d 1d 0d 0% 0%
06/02/2020 06/02/2020 06/02/2020 06/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 99 0.00 0.00 0.00 0.00 0.00 No 0
No 1.1.3.2.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Gesti�n de Requerimientos
1.1.4 Lo antes posible No 0d 155d 155d 17 No M�nima
0.89d -43,869d 2d 1.11d 43,871d -2193450% 0% 07/02/2020
08/02/2020 07/02/2020 08/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 253d 254.11d

No No No No No No No No No No
No No S/ 0.00 3 15 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.4 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Recopilar informaci�n
1.1.4.1 No comenzar antes del 07/02/2020 No 0d 156d 156d 18
No M�nima 0d 0d 1d 1d 1d 0% 0% 07/02/2020
07/02/2020 07/02/2020 07/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
4 100 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.4.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Generar documento de
requerimientos 1.1.4.2 No comenzar antes del 07/02/2020 No 0d
155d 155d 19 No M�nima 0d -43,869d 1d 1d 0d
0% 0% 08/02/2020 08/02/2020 08/02/2020 08/02/2020 12/07/2020
12/07/2020 0d 0d

No No No No No No No No No
No No No S/ 0.00 4 101 0.00 0.00 0.00 0.00 0.00
No 0 No 1.1.4.2 0d 0d
0d S/ 0.00 S/ 0.00 S/ 0.00 No No No S/
0.00 Unidades fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00
S/ 0.00 Prorrateo No No No No No
No No No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No No No No No No No
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
0d 0% A

0% 0% 0% Project Default (Standard)


WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Especificaciones 1.1.5
Lo antes posible No 0d 154d 154d 20 No M�nima
0.89d 58,471.18d 2d 1.11d -58,469.18d 2923559% 0% 08/02/2020
09/02/2020 08/02/2020 09/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 254d 255.11d

No No No No No No No No No No
No No S/ 0.00 3 17 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.5 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Especificaciones de calidad
1.1.5.1 Lo antes posible No 0d 154d 154d 21 No M�nima
0.89d -43,869d 2d 1.11d 43,871d -2193450% 0% 08/02/2020
09/02/2020 08/02/2020 09/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 254d 255.11d

No No No No No No No No No No
No No S/ 0.00 4 27 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.5.1 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Recopilar informaci�n
1.1.5.1.1 No comenzar antes del 08/02/2020 No 0d 155d 155d 22
No M�nima 0d -43,869d 1d 1d 0d 0% 0%
08/02/2020 08/02/2020 08/02/2020 08/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 102 0.00 0.00 0.00 0.00 0.00 No 0
No 1.1.5.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir especificaciones
1.1.5.1.2 No comenzar antes del 09/02/2020 No 0d 154d 154d 23
No M�nima 0d 0d 1d 1d 0d 0% 0% 09/02/2020
09/02/2020 09/02/2020 09/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 103 0.00 0.00 0.00 0.00 0.00 No 0 No
1.1.5.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Especificaciones t�cnicas
1.1.5.2 Lo antes posible No 0d 154d 154d 24 No M�nima
0.89d -43,870d 1d 0.11d 43,871d -4387000% 0% 09/02/2020
09/02/2020 09/02/2020 09/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 255d 255.11d

No No No No No No No No No No
No No S/ 0.00 4 26 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.1.5.2 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Recopilar informaci�n
1.1.5.2.1 No comenzar antes del 09/02/2020 No 0d 154d 154d 25
No M�nima 0d -43,870d 1d 1d 0d 0% 0%
09/02/2020 09/02/2020 09/02/2020 09/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 104 0.00 0.00 0.00 0.00 0.00 No 0
No 1.1.5.2.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir especificaciones
1.1.5.2.2 No comenzar antes del 09/02/2020 No 0d 154d 154d 26
No M�nima 0d -43,870d 1d 1d 0d 0% 0%
09/02/2020 09/02/2020 09/02/2020 09/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 105 0.00 0.00 0.00 0.00 0.00 No 0
No 1.1.5.2.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Ingenier�a de Dise�o
1.2 Lo antes posible No 0d 139d 139d 27 No M�nima
0.89d -58,575.6d 15d 14.11d 58,590.6d -390504% 0% 10/02/2020
24/02/2020 10/02/2020 24/02/2020 11/07/2020 12/07/2020
30/05/2019 30/05/2019 256d 270.11d

No No No No No No No No No No
No No S/ 0.00 2 6 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Informe de Estudio de Suelos
1.2.1 Lo antes posible No 0d 152d 152d 28 No M�nima
0.89d -87,742d 2d 1.11d 87,744d -4387100% 0% 10/02/2020
11/02/2020 10/02/2020 11/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 256d 257.11d

No No No No No No No No No No
No No S/ 0.00 3 23 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.1 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de suelos
1.2.1.1 No comenzar antes del 10/02/2020 No 0d 153d 153d 29
No M�nima 0d -43,871d 1d 1d 0d 0% 0%
10/02/2020 10/02/2020 10/02/2020 10/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 4 106 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Informe de suelos
1.2.1.2 No comenzar antes del 11/02/2020 No 0d 152d 152d 30
No M�nima 0d -43,871d 1d 1d 43,872d 0% 0%
11/02/2020 11/02/2020 11/02/2020 11/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 4 107 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.1.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos 1.2.2 Lo
antes posible No 0d 139d 139d 31 No M�nima 0.89d
26,922.84d 12d 11.11d -26,910.84d 224357% 0% 13/02/2020
24/02/2020 13/02/2020 24/02/2020 11/07/2020 12/07/2020
30/05/2019 30/05/2019 259d 270.11d

No No No No No No No No No No
No No S/ 0.00 3 84 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.2 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos estructurales
1.2.2.1 Lo antes posible No 0d 148d 148d 32 No M�nima
0.89d -65,814d 3d 2.11d 65,817d -2193800% 0% 13/02/2020
15/02/2020 13/02/2020 15/02/2020 11/07/2020 12/07/2020
30/05/2019 30/05/2019 259d 261.11d

No No No No No No No No No No
No No S/ 0.00 4 88 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.2.1 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir medidas de la
estructura 1.2.2.1.1 No finalizar antes del 14/02/2020 No 0d 149d
149d 33 No M�nima 0d 0d 2d 2d 2d 0% 0%
13/02/2020 14/02/2020 13/02/2020 14/02/2020 11/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 108 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Generar planos estructurales
1.2.2.1.2 No comenzar antes del 15/02/2020 No 0d 148d 148d 34
No M�nima 0d -43,876d 1d 1d 0d 0% 0%
15/02/2020 15/02/2020 15/02/2020 15/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 109 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.1.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisar planos
1.2.2.1.3 No comenzar antes del 15/02/2020 No 0d 148d 148d 35
No M�nima 0d -43,876d 1d 1d 0d 0% 0%
15/02/2020 15/02/2020 15/02/2020 15/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 110 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.1.3 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos de Instalaciones
1.2.2.2 Lo antes posible No 0d 142d 142d 36 No M�nima
0.89d 116,918.34d 6d 5.11d -116,912.34d 1948639% 0%
16/02/2020 21/02/2020 16/02/2020 21/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 262d 267.11d

No No No No No No No No No No
No No S/ 0.00 4 21 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.2.2 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos de Instalaciones
sanitarias 1.2.2.2.1 Lo antes posible No 0d 145d 145d 37
No M�nima 0.89d 116,918.34d 3d 2.11d -116,915.34d
3897278% 0% 16/02/2020 18/02/2020 16/02/2020 18/02/2020 12/07/2020
12/07/2020 30/05/2019 30/05/2019 262d 264.11d

No No No No No No
No No No No No No S/ 0.00 5 30 0.00 0.00
0.00 0.00 0.00 S� 0 No
1.2.2.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No No
No S/ 0.00 Unidades fijas No S� 0h 0h 0h
0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir las instalaciones
sanitarias 1.2.2.2.1.1 No comenzar antes del 16/02/2020 No 0d 147d
147d 38 No M�nima 0d -43,877d 1d 1d 0d 0%
0% 16/02/2020 16/02/2020 16/02/2020 16/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No
S/ 0.00 6 111 0.00 0.00 0.00 0.00 0.00 No
0 No 1.2.2.2.1.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Generar planos
1.2.2.2.1.2 No comenzar antes del 17/02/2020 No 0d 146d 146d 39
No M�nima 0d -43,878d 1d 1d 0d 0% 0%
17/02/2020 17/02/2020 17/02/2020 17/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 6 165 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.2.1.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de planos
1.2.2.2.1.3 No comenzar antes del 18/02/2020 No 0d 145d 145d 40
No M�nima 0d -43,878d 1d 1d 0d 0% 0%
18/02/2020 18/02/2020 18/02/2020 18/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 6 112 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.2.1.3 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos de instalaciones
el�ctricas 1.2.2.2.2 Lo antes posible No 0d 142d 142d 41
No M�nima 0.89d 0d 3d 2.11d 3d 0% 0% 19/02/2020
21/02/2020 19/02/2020 21/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 265d 267.11d

No No No No No No No No No No
No No S/ 0.00 5 29 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.2.2.2 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir instalaciones
el�ctricas 1.2.2.2.2.1 No comenzar antes del 19/02/2020 No 0d 144d
144d 42 No M�nima 0d 0d 1d 1d 0d 0% 0%
19/02/2020 19/02/2020 19/02/2020 19/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 6 113 0.00 0.00 0.00 0.00 0.00 No 0
No 1.2.2.2.2.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Generar planos
1.2.2.2.2.2 No comenzar antes del 20/02/2020 No 0d 143d 143d 43
No M�nima 0d 0d 1d 1d 0d 0% 0% 20/02/2020
20/02/2020 20/02/2020 20/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
6 114 0.00 0.00 0.00 0.00 0.00 No 0 No
1.2.2.2.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisar planos
1.2.2.2.2.3 No comenzar antes del 21/02/2020 No 0d 142d 142d 44
No M�nima 0d 0d 1d 1d 0d 0% 0% 21/02/2020
21/02/2020 21/02/2020 21/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
6 115 0.00 0.00 0.00 0.00 0.00 No 0 No
1.2.2.2.2.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Planos de arquitectura
1.2.2.3 Lo antes posible No 0d 139d 139d 45 No M�nima
0.89d 0d 3d 2.11d 3d 0% 0% 22/02/2020 24/02/2020
22/02/2020 24/02/2020 12/07/2020 12/07/2020 30/05/2019
30/05/2019 268d 270.11d

No No No No No No No No No No No No
S/ 0.00 4 85 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.2.2.3 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir instalaciones de
arquitectura 1.2.2.3.1 No comenzar antes del 22/02/2020 No 0d
141d 141d 46 No M�nima 0d 0d 1d 1d 0d 0%
0% 22/02/2020 22/02/2020 22/02/2020 22/02/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No
S/ 0.00 5 116 0.00 0.00 0.00 0.00 0.00 No
0 No 1.2.2.3.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Generar planos
1.2.2.3.2 No comenzar antes del 23/02/2020 No 0d 140d 140d 47
No M�nima 0d 0d 1d 1d 0d 0% 0% 23/02/2020
23/02/2020 23/02/2020 23/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 117 0.00 0.00 0.00 0.00 0.00 No 0 No
1.2.2.3.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de planos
1.2.2.3.3 No comenzar antes del 24/02/2020 No 0d 139d 139d 48
No M�nima 0d 0d 1d 1d 0d 0% 0% 24/02/2020
24/02/2020 24/02/2020 24/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 118 0.00 0.00 0.00 0.00 0.00 No 0 No
1.2.2.3.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Producci�n 1.3 Lo
antes posible S� 0d 0d 0d 49 No M�nima 0.89d
-15,908.55d 139d 138.11d 16,047.55d -11445% 0% 25/02/2020
12/07/2020 25/02/2020 12/07/2020 04/07/2020 12/07/2020
30/05/2019 30/05/2019 271d 409.11d

No No No No No No No No No No
No No S/ 0.00 2 1 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Demolicion de estructuras
existentes 1.3.1 Lo antes posible No 0d 137d 137d 50 No
M�nima 0.89d 0d 2d 1.11d 2d 0% 0% 25/02/2020
26/02/2020 25/02/2020 26/02/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 271d 272.11d

No No No No No No No No No No
No No S/ 0.00 3 34 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.1 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n del terrero
1.3.1.1 No comenzar antes del 25/02/2020 No 0d 138d 138d 51
No M�nima 0d 0d 1d 1d 0d 0% 0% 25/02/2020
25/02/2020 25/02/2020 25/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
4 119 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.1.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Demolici�n de estructuras
1.3.1.2 No comenzar antes del 26/02/2020 No 0d 137d 137d 52
No M�nima 0d 0d 1d 1d 0d 0% 0% 26/02/2020
26/02/2020 26/02/2020 26/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
4 120 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Obras provisionales
1.3.2 Lo antes posible No 0d 135d 135d 53 No M�nima
0.89d 0d 2d 1.11d 2d 0% 0% 27/02/2020 28/02/2020 27/02/2020
28/02/2020 12/07/2020 12/07/2020 30/05/2019 30/05/2019 273d
274.11d
No
No No No No No No No No No No No S/ 0.00
3 33 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.3.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00 No
No No S/ 0.00 Unidades fijas No S� 0h 0h
0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Trazado 1.3.2.1
Lo antes posible No 0d 135d 135d 54 No M�nima
0.89d 0d 2d 1.11d 2d 0% 0% 27/02/2020 28/02/2020 27/02/2020
28/02/2020 12/07/2020 12/07/2020 30/05/2019 30/05/2019 273d
274.11d
No
No No No No No No No No No No No S/ 0.00
4 47 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.3.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir par�metros
1.3.2.1.1 No comenzar antes del 27/02/2020 No 0d 136d 136d 55
No M�nima 0d 0d 1d 1d 0d 0% 0% 27/02/2020
27/02/2020 27/02/2020 27/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 121 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.2.1.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Trazar estructuras
1.3.2.1.2 No comenzar antes del 28/02/2020 No 0d 135d 135d 56
No M�nima 0d 0d 1d 1d 0d 0% 0% 28/02/2020
28/02/2020 28/02/2020 28/02/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 122 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.2.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Casco 1.3.3 Lo antes
posible No 0d 87d 87d 57 No M�nima 0.89d
73,981.8d 46d 45.11d -73,935.8d 160830% 0% 02/03/2020
16/04/2020 02/03/2020 16/04/2020 07/07/2020 12/07/2020
30/05/2019 30/05/2019 277d 322.11d

No No No No No No No No No No
No No S/ 0.00 3 32 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Excavaciones
1.3.3.1 Lo antes posible No 0d 127d 127d 58 No M�nima
0.89d -44,254.98d 6d 5.11d 44,260.98d -737583% 0% 02/03/2020
07/03/2020 02/03/2020 07/03/2020 10/07/2020 12/07/2020
30/05/2019 30/05/2019 277d 282.11d

No No No No No No No No No No
No No S/ 0.00 4 37 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3.1 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Verificar terreno
1.3.3.1.1 No finalizar antes del 04/03/2020 No 0d 130d 130d 59
No M�nima 0d -43,892d 3d 3d 43,894d 0% 0%
02/03/2020 04/03/2020 02/03/2020 04/03/2020 10/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 123 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.3.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Realizar excavaciones
1.3.3.1.2 No finalizar antes del 07/03/2020 No 0d 127d 127d 60
No M�nima 0d -363d 3d 3d 0d 0% 0% 05/03/2020
07/03/2020 05/03/2020 07/03/2020 10/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 124 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Zapatas y vigas de
cimentacion 1.3.3.2 Lo antes posible No 0d 119d 119d 61
No M�nima 0.89d 0d 8d 7.11d 8d 0% 0% 08/03/2020
15/03/2020 08/03/2020 15/03/2020 08/07/2020 12/07/2020
30/05/2019 30/05/2019 283d 290.11d

No No No No No No No No No No
No No S/ 0.00 4 39 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3.2 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir zapatas
1.3.3.2.1 No comenzar antes del 08/03/2020 No 0d 122d 122d 62
No M�nima 0d 0d 5d 5d 5d 0% 0% 08/03/2020
12/03/2020 08/03/2020 12/03/2020 08/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 125 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir vigas
1.3.3.2.2 No comenzar antes del 13/03/2020 No 0d 119d 119d 63
No M�nima 0d 0d 3d 3d 3d 0% 0% 13/03/2020
15/03/2020 13/03/2020 15/03/2020 10/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 126 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Columnas y placas
1.3.3.3 Lo antes posible No 0d 106d 106d 64 No M�nima
0.89d 0d 13d 12.11d 13d 0% 0% 16/03/2020 28/03/2020
16/03/2020 28/03/2020 07/07/2020 12/07/2020 30/05/2019
30/05/2019 291d 303.11d
No No No No No No No No No No No No
S/ 0.00 4 41 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3.3 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir columnas
1.3.3.3.1 No comenzar antes del 16/03/2020 No 0d 114d 114d 65
No M�nima 0d 0d 5d 5d 5d 0% 0% 16/03/2020
20/03/2020 16/03/2020 20/03/2020 08/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 127 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.3.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir placas
1.3.3.3.2 No comenzar antes del 21/03/2020 No 0d 108d 108d 66
No M�nima 0d 0d 6d 6d 6d 0% 0% 21/03/2020
26/03/2020 21/03/2020 26/03/2020 07/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 128 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.3.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de columnas y placas
1.3.3.3.3 No comenzar antes del 27/03/2020 No 0d 106d 106d 67
No M�nima 0d 0d 2d 2d 2d 0% 0% 27/03/2020
28/03/2020 27/03/2020 28/03/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 129 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.3.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Vigas y techos
1.3.3.4 Lo antes posible No 0d 90d 90d 68 No M�nima
0.89d -25.05d 15d 14.11d 40.05d -167% 0% 30/03/2020
13/04/2020 30/03/2020 13/04/2020 07/07/2020 12/07/2020
30/05/2019 30/05/2019 305d 319.11d

No No No No No No No No No No
No No S/ 0.00 4 46 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3.4 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir vigas
1.3.3.4.1 No finalizar antes del 04/04/2020 No 0d 99d 99d 69
No M�nima 0d -25d 6d 6d 31d 0% 0% 30/03/2020
04/04/2020 30/03/2020 04/04/2020 07/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 130 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.4.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir techos
1.3.3.4.2 No comenzar antes del 05/04/2020 No 0d 94d 94d 70
No M�nima 0d 0d 5d 5d 5d 0% 0% 05/04/2020
09/04/2020 05/04/2020 09/04/2020 08/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 131 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.4.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de estructuras
1.3.3.4.3 No comenzar antes del 10/04/2020 No 0d 90d 90d 71
No M�nima 0d 0d 4d 4d 4d 0% 0% 10/04/2020
13/04/2020 10/04/2020 13/04/2020 09/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 132 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.3.4.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Falso piso 1.3.3.5
Lo antes posible No 0d 87d 87d 72 No M�nima
0.89d 116,653.35d 3d 2.11d -116,650.35d 3888445% 0% 14/04/2020
16/04/2020 14/04/2020 16/04/2020 12/07/2020 12/07/2020
30/05/2019 30/05/2019 320d 322.11d

No No No No No No No No No No
No No S/ 0.00 4 50 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.3.5 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Realizar mezcla
1.3.3.5.1 No comenzar antes del 14/04/2020 No 0d 89d 89d 73
No M�nima 0d -43,965d 1d 1d 0d 0% 0%
14/04/2020 14/04/2020 14/04/2020 14/04/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 133 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.3.5.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Nivelar piso
1.3.3.5.2 No comenzar antes del 15/04/2020 No 0d 88d 88d 74
No M�nima 0d -43,966d 1d 1d 0d 0% 0%
15/04/2020 15/04/2020 15/04/2020 15/04/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 134 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.3.5.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisar estructura
1.3.3.5.3 No comenzar antes del 16/04/2020 No 0d 87d 87d 75
No M�nima 0d -43,967d 1d 1d 0d 0% 0%
16/04/2020 16/04/2020 16/04/2020 16/04/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 135 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.3.5.3 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Acabados 1.3.4 Lo
antes posible No 0d 53d 53d 76 No M�nima 0.89d
-87,937.94d 34d 33.11d 87,971.94d -258641% 0% 17/04/2020
20/05/2020 17/04/2020 20/05/2020 06/07/2020 12/07/2020
30/05/2019 30/05/2019 323d 356.11d

No No No No No No No No No No
No No S/ 0.00 3 35 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.4 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revoques y enlucidos
1.3.4.1 Lo antes posible No 0d 84d 84d 77 No M�nima
0.89d -87,938.01d 3d 2.11d 87,941.01d -2931267% 0% 17/04/2020
19/04/2020 17/04/2020 19/04/2020 11/07/2020 12/07/2020
30/05/2019 30/05/2019 323d 325.11d

No No No No No No No No No No
No No S/ 0.00 4 61 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.4.1 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Realizar revoques
1.3.4.1.1 No finalizar antes del 18/04/2020 No 0d 85d 85d 78
No M�nima 0d -43,968d 2d 2d 0d 0% 0%
17/04/2020 18/04/2020 17/04/2020 18/04/2020 11/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 136 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.4.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Realizar enlucidos
1.3.4.1.2 No comenzar antes del 19/04/2020 No 0d 84d 84d 79
No M�nima 0d -43,970d 1d 1d 0d 0% 0%
19/04/2020 19/04/2020 19/04/2020 19/04/2020 12/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 137 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.4.1.2 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Muros divisorios (drywall)
1.3.4.2 Lo antes posible No 0d 75d 75d 80 No M�nima
0.89d 0d 9d 8.11d 9d 0% 0% 20/04/2020 28/04/2020
20/04/2020 28/04/2020 06/07/2020 12/07/2020 30/05/2019
30/05/2019 326d 334.11d

No No No No No No No No No No No No
S/ 0.00 4 65 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.4.2 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Construir muros
1.3.4.2.1 No comenzar antes del 20/04/2020 No 0d 77d 77d 81
No M�nima 0d 0d 7d 7d 7d 0% 0% 20/04/2020
26/04/2020 20/04/2020 26/04/2020 06/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 138 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisar muros
1.3.4.2.2 No comenzar antes del 27/04/2020 No 0d 75d 75d 82
No M�nima 0d 0d 2d 2d 2d 0% 0% 27/04/2020
28/04/2020 27/04/2020 28/04/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 139 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Pintura 1.3.4.3
Lo antes posible No 0d 72d 72d 83 No M�nima
0.89d 0d 3d 2.11d 3d 0% 0% 29/04/2020 01/05/2020 29/04/2020
01/05/2020 11/07/2020 12/07/2020 30/05/2019 30/05/2019 335d
337.11d
No
No No No No No No No No No No No S/ 0.00
4 66 0.00 0.00 0.00 0.00 0.00 S� 0 No
1.3.4.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Pintado de estructuras
1.3.4.3.1 No comenzar antes del 29/04/2020 No 0d 73d 73d 84
No M�nima 0d 0d 2d 2d 2d 0% 0% 29/04/2020
30/04/2020 29/04/2020 30/04/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 140 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.3.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de pintado
1.3.4.3.2 No comenzar antes del 01/05/2020 No 0d 72d 72d 85
No M�nima 0d 0d 1d 1d 0d 0% 0% 01/05/2020
01/05/2020 01/05/2020 01/05/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 141 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.3.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Ventanas y mamparas
1.3.4.4 Lo antes posible No 0d 64d 64d 86 No M�nima
0.89d 0d 8d 7.11d 8d 0% 0% 02/05/2020 09/05/2020
02/05/2020 09/05/2020 09/07/2020 12/07/2020 30/05/2019
30/05/2019 338d 345.11d

No No No No No No No No No No No No
S/ 0.00 4 67 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.4.4 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Colocaci�n de ventanas
1.3.4.4.1 No comenzar antes del 02/05/2020 No 0d 68d 68d 87
No M�nima 0d 0d 4d 4d 4d 0% 0% 02/05/2020
05/05/2020 02/05/2020 05/05/2020 09/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 142 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.4.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Colocaci�n de mamparas
1.3.4.4.2 No comenzar antes del 06/05/2020 No 0d 66d 66d 88
No M�nima 0d 0d 2d 2d 2d 0% 0% 06/05/2020
07/05/2020 06/05/2020 07/05/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 143 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.4.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de estructuras
1.3.4.4.3 No comenzar antes del 08/05/2020 No 0d 64d 64d 89
No M�nima 0d 0d 2d 2d 2d 0% 0% 08/05/2020
09/05/2020 08/05/2020 09/05/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 144 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.4.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revestimiento para muros y
pisos 1.3.4.5 Lo antes posible No 0d 53d 53d 90 No
M�nima 0.89d 0d 11d 10.11d 11d 0% 0% 10/05/2020
20/05/2020 10/05/2020 20/05/2020 08/07/2020 12/07/2020
30/05/2019 30/05/2019 346d 356.11d

No No No No No No No No No No
No No S/ 0.00 4 86 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.4.5 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revestir muros
1.3.4.5.1 No comenzar antes del 10/05/2020 No 0d 60d 60d 91
No M�nima 0d 0d 4d 4d 4d 0% 0% 10/05/2020
13/05/2020 10/05/2020 13/05/2020 09/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 145 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.5.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revestir pisos
1.3.4.5.2 No comenzar antes del 14/05/2020 No 0d 55d 55d 92
No M�nima 0d 0d 5d 5d 5d 0% 0% 14/05/2020
18/05/2020 14/05/2020 18/05/2020 08/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 146 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.5.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de revestimiento
1.3.4.5.3 No comenzar antes del 19/05/2020 No 0d 53d 53d 93
No M�nima 0d 0d 2d 2d 2d 0% 0% 19/05/2020
20/05/2020 19/05/2020 20/05/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 148 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.4.5.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalaciones el�ctricas y
mec�nicas 1.3.5 Lo antes posible No 0d 14d 14d 94 No
M�nima 0.89d 0d 39d 38.11d 39d 0% 0% 21/05/2020
28/06/2020 21/05/2020 28/06/2020 04/07/2020 12/07/2020
30/05/2019 30/05/2019 357d 395.11d

No No No No No No No No No No
No No S/ 0.00 3 69 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5 0d 0d 0d S/ 0.00
S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Canalizaciones y tuber�as
1.3.5.1 Lo antes posible No 0d 43d 43d 95 No M�nima
0.89d 0d 10d 9.11d 10d 0% 0% 21/05/2020 30/05/2020
21/05/2020 30/05/2020 08/07/2020 12/07/2020 30/05/2019
30/05/2019 357d 366.11d

No No No No No No No No No No No No
S/ 0.00 4 72 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Canalizar edificaci�n
1.3.5.1.1 No comenzar antes del 21/05/2020 No 0d 48d 48d 96
No M�nima 0d 0d 5d 5d 5d 0% 0% 21/05/2020
25/05/2020 21/05/2020 25/05/2020 08/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 149 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.1.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar tuber�as
1.3.5.1.2 No comenzar antes del 26/05/2020 No 0d 44d 44d 97
No M�nima 0d 0d 4d 4d 4d 0% 0% 26/05/2020
29/05/2020 26/05/2020 29/05/2020 09/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 150 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n 1.3.5.1.3
No comenzar antes del 30/05/2020 No 0d 43d 43d 98 No M�nima
0d 0d 1d 1d 0d 0% 0% 30/05/2020 30/05/2020
30/05/2020 30/05/2020 12/07/2020 12/07/2020 0d
0d
No No
No No No No No No No No No No S/ 0.00
5 151 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.1.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Conexiones a red externa y
medidores 1.3.5.2 Lo antes posible No 0d 35d 35d 99
No M�nima 0.89d 0d 7d 6.11d 7d 0% 0% 01/06/2020
07/06/2020 01/06/2020 07/06/2020 10/07/2020 12/07/2020
30/05/2019 30/05/2019 368d 374.11d

No No No No No No No No No No
No No S/ 0.00 4 73 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5.2 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar conexiones de red
1.3.5.2.1 No comenzar antes del 01/06/2020 No 0d 40d 40d 100
No M�nima 0d 0d 2d 2d 0d 0% 0% 01/06/2020
02/06/2020 01/06/2020 02/06/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 152 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.2.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar medidores
1.3.5.2.2 No comenzar antes del 03/06/2020 No 0d 37d 37d 101
No M�nima 0d 0d 3d 3d 3d 0% 0% 03/06/2020
05/06/2020 03/06/2020 05/06/2020 10/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 153 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Revisi�n de conexiones
1.3.5.2.3 No comenzar antes del 06/06/2020 No 0d 35d 35d 102
No M�nima 0d 0d 2d 2d 2d 0% 0% 06/06/2020
07/06/2020 06/06/2020 07/06/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 154 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.2.3 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalaciones de pozo a
tierra 1.3.5.3 Lo antes posible No 0d 31d 31d 103
No M�nima 0.89d 0d 4d 3.11d 4d 0% 0% 08/06/2020
11/06/2020 08/06/2020 11/06/2020 11/07/2020 12/07/2020
30/05/2019 30/05/2019 375d 378.11d

No No No No No No No No No No
No No S/ 0.00 4 74 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5.3 0d 0d 0d S/
0.00 S/ 0.00 S/ 0.00 No No No S/ 0.00 Unidades
fijas No S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00
Prorrateo No No No No No No No
No Flat S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 0d
0d 0d 0d 0d 0d 0d
No No No No No No No No No No 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0d 0% A
0%
0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Excavaci�n de pozo
1.3.5.3.1 No comenzar antes del 08/06/2020 No 0d 33d 33d 104
No M�nima 0d 0d 2d 2d 2d 0% 0% 08/06/2020
09/06/2020 08/06/2020 09/06/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 155 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.3.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalaci�n de pozo a tierra
1.3.5.3.2 No comenzar antes del 10/06/2020 No 0d 31d 31d 105
No M�nima 0d 0d 2d 2d 2d 0% 0% 10/06/2020
11/06/2020 10/06/2020 11/06/2020 11/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 156 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.3.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Sistema contra incendio
1.3.5.4 Lo antes posible No 0d 25d 25d 106 No M�nima
0.89d 0d 6d 5.11d 6d 0% 0% 12/06/2020 17/06/2020
12/06/2020 17/06/2020 10/07/2020 12/07/2020 30/05/2019
30/05/2019 379d 384.11d

No No No No No No No No No No No No
S/ 0.00 4 87 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5.4 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir �reas seguras
1.3.5.4.1 No comenzar antes del 12/06/2020 No 0d 28d 28d 107
No M�nima 0d 0d 3d 3d 3d 0% 0% 12/06/2020
14/06/2020 12/06/2020 14/06/2020 10/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 157 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.4.1 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar sistema
1.3.5.4.2 No comenzar antes del 15/06/2020 No 0d 25d 25d 108
No M�nima 0d 0d 3d 3d 3d 0% 0% 15/06/2020
17/06/2020 15/06/2020 17/06/2020 10/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 158 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.4.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Sistema de aire acondicionado
1.3.5.5 Lo antes posible No 0d 14d 14d 109 No M�nima
0.89d 0d 11d 10.11d 11d 0% 0% 18/06/2020 28/06/2020
18/06/2020 28/06/2020 04/07/2020 12/07/2020 30/05/2019
30/05/2019 385d 395.11d

No No No No No No No No No No No No
S/ 0.00 4 75 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.5.5 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir estructura del
sistema 1.3.5.5.1 No comenzar antes del 18/06/2020 No 0d 23d
23d 110 No M�nima 0d 0d 2d 2d 2d 0% 0%
18/06/2020 19/06/2020 18/06/2020 19/06/2020 11/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 159 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.5.5.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar sistema
1.3.5.5.2 No comenzar antes del 20/06/2020 No 0d 14d 14d 111
No M�nima 0d 0d 9d 9d 9d 0% 0% 20/06/2020
28/06/2020 20/06/2020 28/06/2020 04/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 160 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.5.5.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalaciones sanitarias
1.3.6 Lo antes posible S� 0d 0d 0d 112 No M�nima
0.89d 0d 15d 14.11d 15d 0% 0% 28/06/2020 12/07/2020
28/06/2020 12/07/2020 06/07/2020 12/07/2020 30/05/2019
30/05/2019 395d 409.11d

No No No No No No No No No No No No
S/ 0.00 3 70 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.6 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Sistema de desag�e
1.3.6.1 Lo antes posible No 0d 3d 3d 113 No M�nima
0.89d 0d 12d 11.11d 12d 0% 0% 28/06/2020 09/07/2020
28/06/2020 09/07/2020 06/07/2020 12/07/2020 30/05/2019
30/05/2019 395d 406.11d

No No No No No No No No No No No No
S/ 0.00 4 76 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.6.1 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir estructura del
sistema 1.3.6.1.1 No finalizar antes del 02/07/2020 No 0d 10d
10d 114 No M�nima 0d 0d 5d 5d 370d 0% 0%
28/06/2020 02/07/2020 28/06/2020 02/07/2020 08/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 161 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.6.1.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar sistema
1.3.6.1.2 No comenzar antes del 03/07/2020 No 0d 3d 3d 115
No M�nima 0d 0d 7d 7d 7d 0% 0% 03/07/2020
09/07/2020 03/07/2020 09/07/2020 06/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 162 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.6.1.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Sistema de agua fria
1.3.6.2 Lo antes posible S� 0d 0d 0d 116 No M�nima
0.89d 0d 3d 2.11d 3d 0% 0% 10/07/2020 12/07/2020
10/07/2020 12/07/2020 11/07/2020 12/07/2020 30/05/2019
30/05/2019 407d 409.11d

No No No No No No No No No No No No
S/ 0.00 4 77 0.00 0.00 0.00 0.00 0.00 S�
0 No 1.3.6.2 0d 0d 0d S/ 0.00 S/
0.00 S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Definir estructura del
sistema 1.3.6.2.1 No comenzar antes del 10/07/2020 No 0d 1d
1d 117 No M�nima 0d 0d 2d 2d 2d 0% 0%
10/07/2020 11/07/2020 10/07/2020 11/07/2020 11/07/2020 12/07/2020
0d 0d

No No No No No No No No No No No No S/
0.00 5 163 0.00 0.00 0.00 0.00 0.00 No 0
No 1.3.6.2.1 0d 0d 0d S/ 0.00 S/ 0.00
S/ 0.00 No No No S/ 0.00 Unidades fijas No
S� 0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d
0d 0d No
No No No No No No No No No 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project
Default (Standard)
WBS_PROYECTO_CL�NICA_SJB 30/05/2019 12/07/2020 0h
0h 0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 Instalar sistema
1.3.6.2.2 No comenzar antes del 12/07/2020 S� 0d 0d 0d 118
No M�nima 0d 0d 1d 1d 0d 0% 0% 12/07/2020
12/07/2020 12/07/2020 12/07/2020 12/07/2020 12/07/2020
0d 0d
No
No No No No No No No No No No No S/ 0.00
5 164 0.00 0.00 0.00 0.00 0.00 No 0 No
1.3.6.2.2 0d 0d 0d S/ 0.00 S/ 0.00 S/ 0.00
No No No S/ 0.00 Unidades fijas No S� 0h
0h 0h 0h S/ 0.00 S/ 0.00 S/ 0.00 Prorrateo
No No No No No No No No Flat S/ 0.00 S/
0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
0d 0d 0d 0d 0d 0d 0d
No No No No
No No No No No No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0d 0% A
0% 0% 0% Project Default (Standard)