MSL SCH & Work Status
MSL SCH & Work Status
3-HZL-DCPL-ISO-HP-01 01 & 02
4 Fabrication & Erection of HP pipe line along with steam trap, 3-HZL-DCPL-ISO-HP-01 02 of 02 6"
valve with welding and supports.
TG Building and New pipe rack area
11 Radiography Test
12 Hydro Test
13 Insulation & Cladding work
fabrication under
22, 44, 8 22, 22, 68 9 ### ###
progress
### ###
15 joints
40 34 5 3/1/2020 3/5/2020 24mtr. Completed not started
completed
50 34 6 ### 3/3/2020
4 3/9/2020 ###
2 ### ###
2 ### ###
13 ### ###
01-04-2020 to
continuous
s Remarks
Erection
72mtr. Line laying &
Erection and 6nos
joint fit-up complete.
Work under progress
fabrication under
progress
under progress
not started
Flow
Elements
fiting after
Steam
blowing
not started
Flow
Elements
fiting after
Steam
blowing
After steam
blowing
connect to
Turbine Inlet
SCHDULE FOR MS PIPE LINE
S No. Activities Drawing No. SHEET NO Size (Inch) Runing Mrt Total no of During (Day) Start Finish Work status
Joints
SKS to FF Pipe Rack Area ( Column No C7 to C21 & F9 to F13) Fabrication Erection
6" piping
6" piping 60mtr
1 Fabrication & Erection of HP pipe line with welding and 6" 170 42 18 2/5/2020 2/21/2020 60mtr with 6 with 6 butt joint
supports. butt joint
copmt copmt
3-HZL-DCPL-
01 & 02
ISO-HP-01
Loop and Steam Trap with valve Fabrication & Erection of HP
2 pipe line (Sht -01 of 02 & 02 of 02) with supports and welding 6", 4", 1" 22, 44, 8 22, 22, 68 9 2/20/2020 2/29/2020
up to ground level.
SKS Building at EL 25.9 to EL 6.5
Fabrication & Erection of HP pipe line with supports and 3-HZL-DCPL-
3 02 of 02 4" 45 42 13 2/12/2020 2/25/2020
welding. ISO-HP-01
FF Building at EL 11.0 up to EL 6.5
Fabrication & Erection of HP pipe line along with steam trap, 3-HZL-DCPL-
4 02 of 02 6" 76 32 19 2/22/2020 3/10/2020
valve with welding and supports. ISO-HP-01
TG Building and New pipe rack area
Fabrication & Erection of HP pipe line (Separator Tank Steam
5 6" 20 20 3 3/11/2020 3/13/2020
outlet to TG Inlet) piping supports and welding.
Fabrication & Erection of New Pipe Rack Structural 3/11/2020 1/15/2020
3-HZL-DCPL-
Fabrication & Erection of HP Steam line to Separator Tank 01 of 01
6 ISO-HP-01 6" 40 34 5 3/1/2020 3/5/2020
and Axiliary Steam line with supports and welding.