Daily work Report

Report Person Reymar Banaag Report Date April 6-11, 2020


Last Week Planning
Mon Revision of Electrical Materials Master List
*Continuation of Motor Control-Protection
*Motor Control – Controls
*Motor Control – Pilot Device

Tue Revision of Electrical Materials Master List


*Continuation of Motor Control – Pilot Device
*Motor Control – Wire ways

Wen Revision of Electrical Materials Master List


* Continuation of Motor Control - Wire ways
*Motor Control – Cables and Wires
*Motor Control - Enclosure

Thu Maundy Thursday


(Holy Week)

Fri Good Friday


(Holy Week)

Sat Black Saturday


(Holy Week)

Daily Work

Made by: Reymar Banaag Checked by: Noted by:


Planning

Made by: Reymar Banaag Checked by: Noted by: