Report Person Reymar Banaag Report Date April 6-11, 2020
Last Week Planning Mon Revision of Electrical Materials Master List *Continuation of Motor Control-Protection *Motor Control – Controls *Motor Control – Pilot Device
Tue Revision of Electrical Materials Master List
*Continuation of Motor Control – Pilot Device *Motor Control – Wire ways
Wen Revision of Electrical Materials Master List
* Continuation of Motor Control - Wire ways *Motor Control – Cables and Wires *Motor Control - Enclosure