APPENDIX D
Request for inspection Form APPENDIX D
Project Title: Main Contractor:
AB Condominium 123 Contractor Pte Ltd
Work Trade: Dry Wall Applicator:
Dry Partition Wall Installation XYZ Strongwall Pte Ltd
Location of Inspection: Inspection Request No:
Block: 82 Unit No: 55-43 123/ABC/DW/5543/01
Signature, Date & Time of Inspection form Signature, Date & Time of Inspection form ITP Reference No:
submitted: received: 4 (Installation)
Drawing No:
....................................................... ................................................
Arch/ABC/DWSD/01A
By Builder Rep. By RE/RTO
1st Inspection 2nd Inspection 3rd Inspection
By Builder Rep. Comments by RE/RTO By RE/RTO
Description of Activities
Signature Date Signature Date
PRE-ERECTION CHECK
• Drawing Used
• Materials Used
• Accessories Used
SETTING OUT CHECK
• Gridline/Ref. Line
• Setting out line
• Check Level
• Opening position
INSTALLATION CHECK
• Framing
• Studs & Studs’ Verticality
• Lateral Bracing
Close 1st side of Board
• M&E Services installation
• Additional M&E Services
Support
FINAL CLOSING OF BOARD
• Infill / Insulation
TREATMENT
Joint, Corner and Interfacing
PERFORMANCE TESTS
FINAL CHECK
Before Painting commence
Endorsement by RE/RTO: Acknowledgement By Builder:
You may proceed with the
next stage of work
Date & Time of Endorsement Date & Time of Acknowledgement
You are not to proceed
with next stage of work
Others (Please Specified):
Inspector Signature Builder Rep Signature
The graphic shown here serves as a guide only. Page 1