HOLD POINTS
FORM
ITEM DESCRIPTION ATTACHMENTS
PMI SRF RFI IR CPR QCIR OTHERS
I. PRE-CONSTRUCTION STAGE
a. Master Construction Schedule & S-Curve /
b. Manpower Loading /
c. Equipment Loading /
a. Construction Methodology /
e. Project Execution Plan (Tower Crane Location, /
Contractor's, NSC's & Owner's Temfacil
Location, etc.)
b. For Construction Drawing (FCD) /
g. House Rules / Work Restrictions /
c. Construction Shop Drawing (CSD) /
i. Submittal Log /
d. Material Testing
d.1 Rebars /
d.2 Ready Mix /
d.2.1 Cement Ratio per design mix
d.3 CHB /
d.4 Other materials as specified
e. Site Control Points Turn Over /
f. Material Submittals / physical samples
g. Material Delivery Check / gate pass delivery receipts
&qcir
h. Setting Out Plan
h.1 Foundation /
h.2 Column /
h.3 Beam /
h.4 Wall /
i. Cutting List
i.1 Foundation & Tie Beams /
i.2 Column /
i.3 Beams/Girders /
i.4 Shear Walls /
i.5 Slabs /
i.6 Others /
ARCHITECTURAL
EELHI
1 Masonry Works
1.01 CHB Testing ST √
1.02 Rubbed Concrete (smooth finish ceiling) AR 6mm max √
Structural Steel Works ( MEPFS works enlosed on ST steel must be tested and EELHI approved
STRUCTURAL
EELHI
1 Excavation
1.1 Gridline Setting Out AR √
1.2 Inspection of excavation setting-out and elevation AR √
prior to rebar installation.
1.3 Slope Protection Works ( During ) ST √
2 Footing and Footing Tie Beam
2.1 Soil Poisoning IN before ; IR after √
2.2 Inspection of Lean Concrete / gravel bedding /
F-104 CPR
polythelene sheet / spacers
2.3 Inspection of rebar prior to pouring. ST
2.4 Inspection of column setting-out prior to pouring. AR √
3 Column / Shearwall
3.1 Inspection of rebar and spacers prior to ST
enclosure.
F-103 FER
3.2 Inspection of roughing ins and box-setting EE
3.3 Inspection of roughing ins and box-setting AU
3.4 Inspection of plumbness prior to pouring. AR F-104 CPR
3.5 Stripping of Form ST F-105 FSR
3.6 Removal of Permanent Shoring ST √
4 Slab
4.01 Inspection of wall setting-out prior to bottom bar AR √
installation
4.02 Inspection of Formworks layout and Elevation, ST F-104 CPR
Camber
4.03 Inspection of rebars for beam and girders prior to ST F-104 CPR
installation of pipe sleeves
4.04 Inspection of rebars for slab prior to pouring ST F-104 CPR
4.05 Inspection of block-outs for riser and block-out for ME F-101 IR &
refrigerant F-104 CPR
4.06 Inspection of roughing ins and box-setting EE F-101 IR &
F-104 CPR
4.07 Inspection of stub outs PL F-101 IR &
EELHI
FIRE PROTECTION
EELHI
PLUMBING / SANITARY
EELHI
MECHANICAL
EELHI
1.1 Block-out ME
1.2 Location & lay-out ME √
EELHI
4.1 Sleeving ME
√
4.2 Location & lay-out ME
4.3 Installation of Refrigerant Tubing ME
√
4.4 Installation of support ME
4.5 Inspection and Testing ME
√
4.6 Commissioning ME
5.0 Smoke Exhaust Fan (SMEF)
5.1 Check Location and Lay-Out ME √
5.2 Prepare Concrete Padding ME √
5.3 Install The Fan ME √
5.5 Inspection and Testing ME √
5.6 Commissioning ME √
6.0 Acu & Fcu
6.1 Check Location and Lay-Out ME √
6.2 Prepare Concrete Padding ME √
6.3 Install The ACU & FCU ME √
6.4 Inspection and Testing ME √
7.0 Turbo Fan
7.1 Check Location and Lay-Out ME √
7.2 Install The Fan ME √
7.3 Inspection and Testing ME √
8.0 Toilet & Kitchen Exhaust Duct (TED & KED)
8.1 Check Location and Lay-Out ME √
8.2 Install The Fan ME √
8.3 Inspection and Testing ME √
9.0 Diesel Storage Tank
9.1 Check Location and Lay-Out ME √
9.2 Prepare Concrete Padding ME
9.3 fabric ation of tank ME √
9.4 Installation of tank ME
9.5 Inspection and Testing ME √