TOA CORPORATION DATE : 05 February 2018, [$-409]Monday

INSPECTION NO. TOA-BLD-QC-RIS-01


THE PROJECT FOR IMPROVEMENT OF FISHING PORT IN LOME

REQUEST FOR INSPECTION SCHEDULE


TIME OF INSPECTION In-Charge Person
Item No. STRUCTURE/ LOCATION TYPE OF INSPECTION REMARKS
START FINISH GER TOA Corp. TOA Survey FECL
Survey Checked of Foundation Location, Ground Elevation, and Mr. Koffi/ Mr. Philippe/
1 Administration Building 8:00 AM 2:00 PM Mr. Gilles Mr. Robert
Mr. Emilio Mr. Inki
Alignment prior to Plate Load Test
2 Criee

3 Electrical Building

10

11

12

13

14

15
Type of Inspection: Visual, Material Test, Prior to Casting, Prior to Concrete Casting, FDT Test, others NOTE: INSPCTION TIME IS SUBJECT TO CHANGE AT SITE BASE ON PRIORITY

PREPARED BY: PHILIPPE EDEM VERIFIED BY: Mr. A. YAMAMOTO ACKNOWLEDGE BY: MR. INKI
SITE ENGINEER - Building Works BUILDING MANAGER - BUILDING WORKS FECL - CONSULTANT