You are on page 1of 2

PT.

HEAT EXCHANGER INDONESIA


Jl. Bawal, Batu Merah, Batam 29432
Riau - Indonesia
Phone (62) 778 411572 Fax (62) 778 411582

APPLICATION FOR INSPECTION

TO : Lloyds Register DATE : 5 November 2003


REF.
ATTN. : Mr.SAKSANA :
NO.
FAX
:
NO.
We are pleased to notify you of the following inspection:

PROJECT TITLE BASGAS


PO
HEI JOB NO. BO. 669 5248-4251
NO.
DESCRIPTION/ ITEM
NO.
INSPECTION ITEM DOSIR REVIEW
INSPECTION DATE/ DATE: 05 NOVEMBER TIM T
08.00 ~ [Local time]
TIME 2003 E: O
Inspection Category: Final Inspection Intermediate Inspection
Material Alloy Verification Leak/ Pneumatic Test
(PMI Testing)
KIND OF Visual PWHT Hydrostatic Test
INSPECTION:
H: HOLD POINT Dimensional Hardness Test Blasting & Painting
W: WITNESS
R: RECORD Fit-up Tube Expansion Lining/ Refractory
REVIEW
Welding Welding Procedure Function/ Running
Qualification Test
Production Test Welder Test Drying & Packing
(Impact Test)
NDT Others:
(RT/UT/MT/PT)
Remarks:

Name JULDEFI Telp. No. 62 778 411572


APPLICANT Section QA/QC Fax. No. 62 778 411582

Company PT. Heat Exchangers Indonesia Signature

You might also like