Request For Inspection

Date: 2/13/2020
Request no. 000027
Project Title: Design, Procurement, Furnishing & Execution of Ethiopian Skylight 5-star Hotel Phase-2 Project

Employer: Engineer: Contractor:

We request your attendance to inspect the following works :


1. Type : Buildings Reinforcement work for raft foundation part4-1
2. Inspection time: 3:00 pm Date : 2/13/2020
3. Location :project site Building √ Floor Element Drawing no.
19AH03M-J2-03g2
19AH03M-J2-12g2/13g2
4. Inspection First Second Third

5. Purpose of the inspection:


3. Structure
1. Surveying 5. Architecture
Setting out Formwork
Blockwork Floor Finish
Levels Reinforcement
Plaster False Ceilings
Verticality Concreting
Metals Roofing
Woods & Plastics Waterproofing
2. Earthworks 4. Electro-Mech.
Formation First Fix
Doors & Windows Painting
Sides of Excavation Second Fix
Wall Finish Furniture

Others (specify) -
We have completed reinforcement work for raft foundation part4-1 and request the inspection for the concrete
Particular Details casting

Submitted by : Song Baoliang Signature

6. Inspection report Signature

Date/Time of inspection :

7. Engineer's Representative comments:

The works are : Approved Approved as Noted Rejected

Signature: Date:

Attach all relevant particular test forms IR-BLDG-1


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.

S-PRC-SS-02(F33) Rev 2
扫描全能王 创建