You are on page 1of 1

SUMMARY OF QUANTITIES

SERIES 2000 SITE CLEARANCE SERIES 5000 : ROAD BASE, BASE COURSE AND SUBBASE
Item Description Unit Quantity Item Description Unit Quantity
21.01 Clearing and grubbing Hectar 57.09 54.01(a) Gravel Wearing Coarse m3 43,641.80

SERIES 3000 : DRAINAGES SERIES 8000: STRUCTURES


Item Description Unit Quantity Item Description Unit Quantity
11.01(a) Excavation for open drain(a) in soft material m3 1,516.33 81.02 Excavation of soft material For Structures m3 856
Excavating soft material situated with in the following depths (a) Back filling to excavations utilizing Material from the excavation m3 75
81.05
(i) 0.0m up to 1.5m m3 491.88 (b) Back filling to excavations utilizing Imported material m3 753
32.01(a)
(II) Exceeding 1.5m and up to 3.0m m3 64.40 83.01(b) Reinforcement Steel (G 40) T 0.12
(III) Exceeding 3.0m and up to 4.5m m3 9.91 83.01(b) Reinforcement Steel (G 60) T 0.42
32.01(b) Extra over sub item 32.01(a) for excavation in hard material irrespective of depth m3 5,873.30 (a) Class "A" Concrete m3 59
84.01
32.01(c) Channel Excavation m 3
23,364.09 (b) Class "C" Concrete m3 64
(a) Backfilling using the excavated material m3 423.89 Bridge Railling
32.02 (b)i Backfilling using imported selected material m3 2,138.21 87.07.c R.C Bridge Railling Lm 22.00
(b)ii Backfilling using imported selected material (Retaining Wall) m3 3,484.76 89.01(b) Class "B" Stone Massonry m3 801.00
32.02 (c) Selected Granular Backill m3 1,030.12 87.03 Steel Bearing No 8.00
(b)i Ф36” R.C. pipe on class ‘B’ bedding m 347.00 34.02(a) Hand Laid Rock Rip Rap m3 58.00
(c)i Ф42” R.C. pipe on class ‘B’ bedding m 24.00 34.02 Hand Laid Rock Embankment m3 447.00
32.03 (d)ii Ф48” R.C. pipe on class ‘B’ bedding m 78.00 31.08(b) Ø 200 PVC Storm Drainage Lm 6.80
(b)iii Ф36” R.C. pipe on class ‘C’ bedding m 58
(c)iii Ф42” R.C. pipe on class ‘C’ bedding m 70 SERIES 9000: ANCILLARY WORKS
(b) Grouted Stone Pitching (Minor Drainage) m2 843.19 Item Description Unit Quantity
34.03 (d) Grouted Pitching (For side Ditches) m2 31,600.47 92.01(d) Guide Posts (RC) No. 1,134.00
(b)i Cement mortared stone walls m3 6,273.23 92.01(f) Guard Rail m 2,217.81
(b)ii Cement mortared stone walls (Retaining Walls) m3 6,343.03 94.01 (a) Sign faces with painted background and area not exceeding 2sq.m, as shown in the drawing m2 170.78
34.03
(c)i Sheathing Material m3 327.69 (b)Sign faces with painted background and area exceeding 2sq. m but not exceeding 10 sq. m, as shown in the draw m2 12.00
34.03(d) (c)ii Sheathing Material (Retaining Wall) m3 4,105.11 94.02 (b) Steel Post No. 401.00
(d)i Hand Laid Rock Embankment m3 70.35 94.03 Concrete in Road Sign Footings Including Excavation & Backfilling m3 96.24
34.06
Excavation for Foundation Trenches for Retaining Walls
(b) In All Other Classes of Materials Than Hard Rock m3 7,388.02

Item SERIES 4000 : EARTHWORKS Quantity


Description Unit
44.05(a) Capping layer (G 7) m3 23,402.40
44.05(b) Capping layer (G 20) m3 7,301.90
42.01(a) Cut and Borrow to Fill with unlimited hauling distance i) Compacted to 95% of modified AASTO Density m3 41,526.65
42.03(a) Cut to Spoil,Excavating and breaking in common (normal) excavation to spoil m3 396,673.52
42.03(c) Cut to Spoil, Excavating and breaking in rock (hard) excavation to spoil m3 1,961,052.90