BILL OF QUANTITIES FOR BRIDGE LOACTED @ STA.

255+960

Project :- SEGEG - GERBO - DANAN (FIK - SEGEG - GERBO - DANAN ROAD PROJECT, LOT 3: YOALE - DANAN (KM 191+000 - KM 273+844))
8000 STRUCTURES Unit rate qty Amount Rev Qty Rev Amount Excuted
8100 : FOUNDATION FOR STRUCTURES
81.01(a)i Foundation Investigation PS 300,000.00 1.00 300,000.00 992,304.11 992,304.11 1.00 - 1.00 929,318.61 - 929,318.61 62,985.50
81.01(b) Allowed % for overhead and profit on 81.01(a)i % 0.25 1.00 75,000.00 0.25 248,076.03 0.25 - 0.25 232,329.65 - 232,329.65 15,746.38
81.02 : Excavation for structures
81.02 (a) Excavation in soft material irrespective of depth m3 150.00 3,584.22 3,584.22 537,633.00 3,413.59 512,038.11 - 512,038.11
81.02 (b) Excavation in hard material irrespective of depth m3 700.00 4,965.20 4,965.20 3,475,640.00 5,705.80 3,994,058.03 - 3,994,058.03
81.05 : Backfill to excavations utilising: - - - -
81.05 (a) Backfilling to excavations utilizing material from excavation m3 200.00 1,827.45 1,827.45 365,490.00 - - - - - - -
81.05 (b) Backfill utilizing imported material (selected granular material) m3 250.00 1,802.03 1,802.03 450,507.50 3,521.62 880,405.16 - - - - 880,405.16
81.08 (a) Hand laid rock fill m3 600.00 833.21 833.21 499,926.00 930.18 558,105.00 - 558,105.00
81.08 (b) Cyclopean mass concrete m3 3,000.00 481.80 - 1,445,400.00 1,193.60 3,580,796.25 - 3,580,796.25
81.51
m3 3,000.00 100.00 100.00 300,000.00 123.00 369,000.00 369,000.00
Sheathing material from crushed stone type A covered with Geotextile type I-A (refer tables 3107/1 and 3107/3) - - - -
8200 : FORMWORK FOR STRUCTURES - - - -
82.01(a) Formwork, class F2 surface finish m2 400.00 22,712.27 6,169.44 9,084,908.00 8,820.69 3,528,276.87 1,476.71 240.35 1,717.06 590,685.60 96,140.00 686,825.60 2,841,451.27
8300 : STEEL REINFORCEMENT FOR STRUCTURES - - - -
83.01 (a)i
Reinforcement for structures, high yield steel bars, deformed bars of grade 40 Ton 60,000.00 114.53 105,391.61 6,871,800.00 104.74 6,284,443.54 6,284,443.54
- - - -
83.01 (a)ii
Ton 60,000.00 236.66 166,025.82 14,199,600.00 164.83 9,889,888.08 9,889,888.08
Reinforcement for structures, high yield steel bars, deformed bars of grade 60 - - - -
8400 : CONCRETE FOR STRUCTURES - - - -
84.01 (a) Cast insitu concrete, (C-30/19) for bridges m3 5,000.00 2,226.09 2,226.09 11,130,450.00 3,965.45 19,827,232.47 625.88 62.75 688.63 3,129,375.00 313,750.00 3,443,125.00 16,384,107.47
84.01 (b) Cast in situ concrete, C-20/19 in blinding for bridges m3 4,500.00 175.07 175.08 787,815.00 281.14 1,265,141.18 197.64 - 197.64 889,357.50 - 889,357.50 375,783.68
8700 : BRIDGE BEARING, PARAPET, RAILING, SIDEWALKS, NO-FINES CONCRETE, WATER PROOFING AND DRAINAGE FOR STRUCTURES - -
87.03 : Bearings - - -
87.03(a) Elastomeric bearings No 25,000.00 80.00 56.00 2,000,000.00 64.00 1,600,000.00 - - - - 1,600,000.00
87.07(a) Concrete Railings, Class C-30/12.5 concrete for bridges Lm 1,500.00 431.20 431.20 646,800.00 647.60 971,400.00 - - - - 971,400.00
87.13(a) Expansion Joint including 20mm compressible joint filler board Lm 250.00 102.48 102.48 25,620.00 106.80 26,700.00 - - - - 26,700.00
87.16(a) Joint sealant, 20mm deep grouted polysulphide sealant Lm 300.00 102.48 102.48 30,744.00 106.80 32,040.00 - - - - 32,040.00
87.19(a) Drainage pipes, 100mm internal diameter PVC (deck drain) Lm 300.00 150.77 150.41 45,231.00 106.80 32,040.00 - - - - 32,040.00
87.23
Sheathing material from crushed stone type A covered with Geotextile type I-A (refer tables 3107/1 and 3107/3) m3 1,500.00 20.00 30,000.00 123.00 184,500.00 184,500.00
- - - -
8900 : STONE MASONRY STRUCTURES - - -
89.01 : Stone Masonry Walls - - -
89.01(a) Plain packed stone masonry wall (class 3), riprap m3 1,500.00 68.71 69.15 103,065.00 427.94 641,904.00 - - - - 641,904.00
89.01(b) Cement mortared class "B" Masonry wall for bridge m3 2,000.00 3,002.95 3,002.93 6,005,900.00 2,972.37 5,944,734.88 - - - - 5,944,734.88

Prepared By (QS) Checked By (ARE) Approved By (RE)


Name:- Yohannes Negussie Name:- ______________ Name:-Yitbarek W/Amanuel
6.3%
6.3%

100.0%
100.0%

100.0%
100.0%
100.0%

100.0%

80.5%

100.0%

100.0%

82.6%
29.7%

100.0%
100.0%
100.0%
100.0%
100.0%

100.0%

100.0%
100.0%

Prepared By (QS) Checked By (ARE) Approved By (RE)


Name:- Yohannes Negussie Name:- ______________ Name:-Yitbarek W/Amanuel
ESTIMATED QUANTITIES FOR BRIDGE -197+865
Bill Item DESCRIPTION UNIT
81.02 (a) EXCAVATION OF SOFT MATERIAL IRRESPECTIVE OF DEPTH m3
81.02 (b) EXCAVATION OF HARD MATERIAL IRRESPECTIVE OF DEPTH m3
81.05 (a) BACK FILLING TO EXCAVATIONS UTILIZING MATERIAL FROM THE EXCAVATION m3
81.05 (b) BACK FILL UTILIZING IMPORTED MATERIAL (SELECTED GRANULAR MATERIAL) m3
81.08 (a) HANDLAID ROCK FOUNDATION FILL MATERIAL m3
81.08 (b) CYCLOPEAN MASS CONCRETE m3
81.52 SHEATHING MATERIAL m2
82.01(a) FORMWORK, CLASS F2 SURFACE FINISH m2

83.01 (a) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 40 Kg

83.01 (b) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 60 Kg


84.01 (b) CAST INSITU CONCRETE, (C-30) FOR BRIDGE m3
84.01 (c) CAST INSITU CONCRETE, (C-20) FOR BRIDGE m3
87.03(ii) ELASTOMERIC BEARINGS No.
87.07 CONCRETE BRIDGE RAILING, CLASS Y CONCRETE Lm
87.13(a) EXPANSION JOINT INCLUDING 20MM COMPRESSIBLE JOINT FILLER BOARD Lm
87.16(a) JOINT SEALANT, 20MM DEEP GROUTED POLYSULPHIDE SEALANT Lm
87.19(a) DRAINAGE PIPES, 100MM INTERNAL DIAMETER PVC (deck drain) Lm
89.01(a) PLAIN PACKED STONE MASONRY WALL (CLASS 3), RIPRAP m3
89.01(b) CEMENET MORTARED CLASS "B" MASONRY WALL FOR BRIDGE m3
QUANTITY
1,082.64 8,549.42
-
266.92
450.51
231.73

25.00
283.11

17,524.64

7,667.98
224.69 224.7
35.73 35.7
8.00
30.00
14.64
14.64
10.14
18.44
686.52
ESTIMATED QUANTITIES FOR BRIDGE -236+740
Bill Item DESCRIPTION UNIT QUANTITY
81.02 (a) EXCAVATION OF SOFT MATERIAL IRRESPECTIVE OF DEPTH m3 2,501.58
81.02 (b) EXCAVATION OF HARD MATERIAL IRRESPECTIVE OF DEPTH m3 -
81.05 (a) BACK FILLING TO EXCAVATIONS UTILIZING MATERIAL FROM THE EXCAVATION m3 407.93
81.05 (b) BACK FILL UTILIZING IMPORTED MATERIAL (SELECTED GRANULAR MATERIAL) m3 450.51
81.09 (a) HANDLAID ROCK FOUNDATION FILL MATERIAL m3 224.93
81.09 (d) CYCLOPEAN MASS CONCRETE m3 -
81.52 SHEATHING MATERIAL m2 25.00
82.01(a) FORMWORK, CLASS F2 SURFACE FINISH m2 2,526.56

83.01 (a) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 40 Kg 35,571.50

83.01 (b) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 60 Kg 64,717.76
84.01 (b) CAST INSITU CONCRETE, (C-30) FOR BRIDGE m3 701.17
84.01 (c) CAST INSITU CONCRETE, (C-20) FOR BRIDGE m3 40.22
87.03(ii) ELASTOMERIC BEARINGS No. 24.00
87.07 CONCRETE BRIDGE RAILING, CLASS Y CONCRETE Lm 124.40
87.13(a) EXPANSION JOINT INCLUDING 20MM COMPRESSIBLE JOINT FILLER BOARD Lm 29.28
87.16(a) JOINT SEALANT, 20MM DEEP GROUTED POLYSULPHIDE SEALANT Lm 29.28
87.19(a) DRAINAGE PIPES, 100MM INTERNAL DIAMETER PVC (deck drain) Lm 43.94
89.01(a) PLAIN PACKED STONE MASONRY WALL (CLASS 3), RIPRAP m3 16.14
89.01(b) CEMENET MORTARED CLASS "B" MASONRY WALL FOR BRIDGE m3 979.00
ESTIMATED QUANTITIES FOR BRIDGE -240+640
Bill Item DESCRIPTION UNIT
81.02 (a) EXCAVATION OF SOFT MATERIAL IRRESPECTIVE OF DEPTH m3
81.02 (b) EXCAVATION OF HARD MATERIAL IRRESPECTIVE OF DEPTH m3
81.05 (a) BACK FILLING TO EXCAVATIONS UTILIZING MATERIAL FROM THE EXCAVATION m3
81.05 (b) BACK FILL UTILIZING IMPORTED MATERIAL (SELECTED GRANULAR MATERIAL) m3
81.09 (a) HANDLAID ROCK FOUNDATION FILL MATERIAL m3
81.09 (d) CYCLOPEAN MASS CONCRETE m3
81.52 SHEATHING MATERIAL m2
82.01(a) FORMWORK, CLASS F2 SURFACE FINISH m2

83.01 (a) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 40 Kg

83.01 (b) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 60 Kg


84.01 (b) CAST INSITU CONCRETE, (C-30) FOR BRIDGE m3
84.01 (c) CAST INSITU CONCRETE, (C-20) FOR BRIDGE m3
87.03(ii) ELASTOMERIC BEARINGS No.
87.07 CONCRETE BRIDGE RAILING, CLASS Y CONCRETE Lm
87.13(a) EXPANSION JOINT INCLUDING 20MM COMPRESSIBLE JOINT FILLER BOARD Lm
87.16(a) JOINT SEALANT, 20MM DEEP GROUTED POLYSULPHIDE SEALANT Lm
87.19(a) DRAINAGE PIPES, 100MM INTERNAL DIAMETER PVC (deck drain) Lm
89.01(a) PLAIN PACKED STONE MASONRY WALL (CLASS 3), RIPRAP m3
89.01(b) CEMENET MORTARED CLASS "B" MASONRY WALL FOR BRIDGE m3
QUANTITY
-
1,601.51
376.32
450.51
184.21
-
25.00
1,910.38

32,346.25

49,732.98 19949.22 43907.1


728.84
40.48
24.00
150.80
29.28
29.28
50.70
20.34
568.14
ESTIMATED QUANTITIES FOR BRIDGE -255+490
Bill Item DESCRIPTION UNIT
81.02 (a) EXCAVATION OF SOFT MATERIAL IRRESPECTIVE OF DEPTH m3
81.02 (b) EXCAVATION OF HARD MATERIAL IRRESPECTIVE OF DEPTH m3
81.05 (a) BACK FILLING TO EXCAVATIONS UTILIZING MATERIAL FROM THE EXCAVATION m3
81.05 (b) BACK FILL UTILIZING IMPORTED MATERIAL (SELECTED GRANULAR MATERIAL) m3
81.09 (a) HANDLAID ROCK FOUNDATION FILL MATERIAL m3
81.09 (d) CYCLOPEAN MASS CONCRETE m3
81.52 SHEATHING MATERIAL m2
82.01(a) FORMWORK, CLASS F2 SURFACE FINISH m2

83.01 (a) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 40 Kg

83.01 (b) REINFORCEMENT FOR STRUCTURES,HIGH YIELD DEFORMED BARS OF GRADE 60 Kg


84.01 (b) CAST INSITU CONCRETE, (C-30) FOR BRIDGE m3
84.01 (c) CAST INSITU CONCRETE, (C-20) FOR BRIDGE m3
87.03(ii) ELASTOMERIC BEARINGS No.
87.07 CONCRETE BRIDGE RAILING, CLASS Y CONCRETE Lm
87.13(a) EXPANSION JOINT INCLUDING 20MM COMPRESSIBLE JOINT FILLER BOARD Lm
87.16(a) JOINT SEALANT, 20MM DEEP GROUTED POLYSULPHIDE SEALANT Lm
87.19(a) DRAINAGE PIPES, 100MM INTERNAL DIAMETER PVC (deck drain) Lm
89.01(a) PLAIN PACKED STONE MASONRY WALL (CLASS 3), RIPRAP m3
89.01(b) CEMENET MORTARED CLASS "B" MASONRY WALL FOR BRIDGE m3
QUANTITY
- 7,466.78
3,363.69
776.28
450.51
192.34
-
25.00
1,449.39

19,949.22

43,907.10
571.39
58.65
8.00
126.00
29.28
29.28
45.63
14.23
769.28