You are on page 1of 1

Attachment 1: Estimated Bill of Quantities(K150+000-K156+000)

Rate
Pay Item Description Unit Quantity Amount (ETB) Remark
(ETB)

2000 Site Clearance


21.01 Clearing and Grubbing Ha 45,369.89 -
22.01 Removing Existing Structure m3 174.36 -
3000 Drainage
31.01 Excavation for Open Drains
(a) Soft Excavation irrespective of Depth, no Over-haul m3 64.40 -
Hard Excavation irrespective of Depth, no Over-haul (Hard
(b) m 3
195.20 -
excavation only by quartering hammer)
(c) Channel Excavation irrespective of Depth, no Over-haul m3 58.44 -
31.07 Sub Surface Drain m 251.90 -
32.00 Culvert and Appurtenant Structure
32.01 Excavation
(a) Soft Excavation irrespective of Depth, no Over-haul m3 62.07 -
Hard Excavation irrespective of Depth, no Over-haul (Hard
(b) m3 195.20 -
excavation only by quartering hammer)
32.02 Backfilling
(b) Backfilling using selected material, no Over-haul m3 127.56 -
(d) Replacement fill using selected material, no Over-haul m3 127.56 -
32.03 Pipe culverts
(i) Single RC pipe culvert -1220mm m 777.63 -
(ii) Double RC pipe culvert -1220mm m 1,555.25 -
(c) Longitudinal Pipe
(i) RC pipe-750mm m 671.55 -
(ii) RC pipe-900mm m 694.12 -
32.07 Cast in situ concrete including formwork and sealed joints
(i) Concrete for bedding/foundation/water paving m3 302.49 -
32.10 Steel Reinforcement
(a) Reinforcement Bar ton 3,298.00 -
34.03 Cement Motored Stone Masonry
(i) Stone Masonry for pipe culvert/manhole m3 930.68 -
4000 Earthwork
42.01 Cut and borrow to fill
Cut/Borrow to Fill irrespective of Material Type, including free-haul
(a) m3 89.20 -
to 3km
(b) Overhaul on fill materials hauled in excess of 3.0km m ·Km
3
4.50 -
(i) Borrow to fill, Special Section Treatment (no over-haul, rock) m3 192.47 -
42.03 Cut to Spoil
(a) Cut to Spoil, Material obtained from: Soft excavation, no over-haul m3 46.10 -
Cut to Spoil, Hard excavation, no over-haul (Hard excavation only
(b) m 3
155.15 -
by quartering hammer)
(c) Cut to Spoil, Material obtained from Blasted Rock, no over-haul m3 112.48 -
44.05 Improved Subgrade Layer
Improved Subgrade Layer(Selected material), including free-haul to
(a) m3 109.00 -
5km
(b) Overhaul on fill materials hauled in excess of 5.0km m3·Km 4.20 -
(c) Improved Subgrade material Blending m3 14.00 -
5000 Sub base
51.01(a) Natural Sub Base, including free-haul to 5Km m3 134.76 -
51.01(b) Overhaul on fill materials hauled in excess of 5.0km m3·Km 4.20 -
51.01(c) Sub Base material Blending m3 14.00 -
Crushed stone Base Layer of Walkway/Link road, including free-
51.02 m3 171.44 -
haul to 10Km
(i)Overhaul on fill materials hauled in excess of 10.0km m ·Km
3
4.50 -
Sub-total -
15%VAT -
Grand-total #REF!

Main Contractor: Sub-Contractor:


Date: Date:

You might also like