You are on page 1of 1

Request For Inspection

Date: 2020.3.1
Request no. 000032
Project Title: Design, Procurement, Furnishing & Execution of Ethiopian Skylight 5-star Hotel Phase-2 Project

Employer: Engineer: Contractor:

We request your attendance to inspect the following works :


1. Type : Buildings Reinforcement work of columns and shear walls for basement 2 at part 4-1 area
2. Inspection time: 9:00 am Date : 2020.3.2
3. Location :project site Building √ Floor Element Drawing no.
19AH03M-J2-03g2
19AH03M-J2-12g2/13g2
4. Inspection First Second Third

5. Purpose of the inspection:


3. Structure
1. Surveying 5. Architecture
Setting out Formwork
Blockwork Floor Finish
Levels Reinforcement
Plaster False Ceilings
Verticality Concreting
Metals Roofing
Woods & Plastics Waterproofing
2. Earthworks 4. Electro-Mech.
Formation First Fix
Doors & Windows Painting
Sides of Excavation Second Fix
Wall Finish Furniture

Others (specify) -
We have complete the reinforcement work of columns and shear walls for basement 2 at part 4-1 area,here with
Particular Details the inspection request for form shutter close

Submitted by : Song Baoliang Signature

6. Inspection report Signature

Date/Time of inspection :

7. Engineer's Representative comments:

The works are : Approved Approved as Noted Rejected

Signature: Date:

Attach all relevant particular test forms IR-BLDG-1


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.