Installation Demonstration of AMCT18


Complete Rice Mill

1. Fix the concrete foundation of the machine’s foot. (Pay attention

the correct direction of the main parts’ foots and de‐stoner’s foots)

1
.

2. Install the paddy separator.(Be fixed with the corresponding screw

hole)

2
.

3. Install the whitener(It need to assemble the protection covers of the

paddy separator and whitener firstly.)

3
.

4.Install the the husker head and component.

4
.

5. Install the de‐stoner and components.

5
.

6
.

7
.

6. Install the double elevator, feed‐in pipe and other parts.

8
.

9
.

10
.

7. Install the triangle belts

11
.

12
.

8. Install the single elevator and some other parts

13
.

14
.

15
.

9. Install the storage hopper of the husker and component

16
.

17
.

18
.

10. Install the Observed hole transparent plates and repair gate of the elevators.

19
.

20
.

21
.

11. Install the integrated electrical control box and other parts

22
.

23
.

24
.

25
.

26
.

27