Southern Region Implementation Plan for 9:00PM switch off light call by

Ho’ble PM
During 6:00 PM load change over, there is observed that HV persists in the grid. All BR/LR would be
switch IN, Parallel lines as per simulation studies will be OEN as per the list in annexure-I.

List of Hydro Generation participating in Flexing


AP Capacity Contact Number Pumping
LOWER SILERU( 4 * 115 ) 460 8333805891
SRISAILAM RBPH( 7 * 110
770 9490612540
)
UPPER SILERU( 4 * 60 ) 240 9490153116
Tealnagana
NAGARJUNA SAGAR( 1 *
816 9490672016
110 + 7 * 100.8 ) Pump 4x120
SRISAILAM LBPH( 6 * 150
900 9490612531
)
Karnataka
NAGJHERI( 1*135 + 5 *
885
150 ) 9480182710
SHARAVATHI( 10 * 103.5 ) 1035 9481076452/9449598801
VARAHI UGPH( 4 * 115 ) 460 9449598871
KODASALLI(3*40) 120

KADRA(3*50) 150
STRP(4*60) 240

Kerala
IDDUKKI( 6 * 130 ) 780 9446008454/55/56
SABARIGIRI( 2 * 60 + 4 *
340 9446008457/58
55 )
Tamilnadu
KADAMPARAI ( 4 * 100 ) 400 9443036224 Pump 3x110
Kundah 415 9445857110
Pushep 150 9445857110
8161
List of State Thermal Generation participating in Flexing
Tot
Capacity On Bar Capacity ON Bar TM
AP
VTPS 1760 630 441
KRSPTNM 1600 800 560
RAYALASEEMA 1650 210 147
Telangana
KTPS 1800 1000 700
Singareni 1200 1200 840
Kakatiya 1100 1100 770
Karnataka
RTPS 1720 880 616
YTPS 1600 800 560
UPCL 1200 600 420
Tamilnadu
NCTPS 1830 210 147
Mettur 1440 210 147
TTPS 105 210 147
NLC 600 360 252
17605 8210 5747

List of ISGS thermal Generation participating in Flexing


UNIT
PLANT IC DC RAMP Tech Min
NO
RAMAGUNDAM 1 200 100.1
RAMAGUNDAM 2 200 100.1
RAMAGUNDAM 3 200 100.1
1965 292.9
RAMAGUNDAM 4 500 257.8
RAMAGUNDAM 5 500 257.8
RAMAGUNDAM 6 500 257.8
RAMAGUNDAM 7 -
KUDGI 1 800 412.5
KUDGI 2 1500 225 -
KUDGI 3 800 412.5
TALCHER STG-II 3 500 257.8
TALCHER STG-II 4 500 257.8
1930 282
TALCHER STG-II 5 500 257.8
TALCHER STG-II 6 500 257.8
SIMHADRI STG-I 1 500 259.2
952 142
SIMHADRI STG-I 2 500 259.2
SIMHADRI STG-
500 259.2
II 3
952 142
SIMHADRI STG-
500 259.2
II 4
NTECL-VALLUR 1 500 257.8
NTECL-VALLUR 2 468 70.3 -
NTECL-VALLUR 3 -
NTPL 1 500 259.2
952.5 150
NTPL 2 500 259.2
NEYVELI-II 1 210 122.85
NEYVELI-II 2 210 378 57 122.85
NEYVELI-II 3 -
NEYVELI-II 4 210 122.85
NEYVELI-II 5 210 122.85
756 113
NEYVELI-II 6 210 122.85
NEYVELI-II 7 210 122.85
NEYVELI1EXP 1 210 125.15
388 59
NEYVELI1EXP 2 210 125.15
NEYVELI2EXP 1 250 146.25
360 68
NEYVELI2EXP 2 250 146.25
11380 6022.8

Operation during peak time up to 8:00PM

Hydro generation would be regulated so as to conserve water to maintain flexibility subsequently


during light Switch Off condition. Preferably Hydro generation can be minimized. Hydro Units
participating in flexibility droop has been configured to 2%.

Thermal generation would be regulated to meet LGB. Preferably Thermal generation can be
maximized.

Operation during 8:00 PM - 8:45 PM

1. All designated senior officers are site


2. Efforts to make ISGS requisition for TM schedule
3. All Hydro station as per table above – should be maximum
4. All on-bars state thermal Unit would be brought to TM as per table above
5. Check all capacitors are Off
6. Check all Reactors are ON
7. Check all Pumps in service (Kadamparai and Nagarjuna Sagar)
8. All Irrigation load would be in service as planned by respective SLDCs
9. Frequency targeted to maintain at lower side of IEGC band i,e 49.90Hz or little below.

Operation during 8:45 PM - 9:15 PM

1. All identified Hydro stations starts ramping down from 8:57PM based on grid frequency
2. Grid security and frequency profile would be primary monitoring parameter during the short
time. As discussed during FOLD meeting on 4th April 2020, DSM and merit order should not
be the constraints for control. Only emergency unit tripping control can be given from
SLDC/SRLDC.
3. State Thermal units starts ramping from 9:05 PM
4. State Hydro units would be start ramping based on frequency from 9:09 PM
5. Pump at Kadamparai and Nagarjunasagar would be tripped in case low frequency
6. Wind generation infeed to ISTS has been configured by POWERGRID to trip at frequency
50.20Hz
 230kV Tuticorin GS - Betam
 230kV Tuticorin GS - Orange
 230kV Tuticorin GS - Mytrah
 230kV Tuticorin GS - GIREL (chandragiri)

Operation during 9:15 PM Onwards

7. All State thermal generation would be maximised as per control area LGB
8. All constituents would maintain ISGS requisition as per control area LGB
9. All Hydro generation would be regulated as per control area LGB
10. Grid normal operation

x-x-x