During 6:00 PM load change over, there is observed that HV persists in the grid. All BR/LR would be
switch IN, Parallel lines as per simulation studies will be OEN as per the list in annexure-I.
KADRA(3*50) 150
STRP(4*60) 240
Kerala
IDDUKKI( 6 * 130 ) 780 9446008454/55/56
SABARIGIRI( 2 * 60 + 4 *
340 9446008457/58
55 )
Tamilnadu
KADAMPARAI ( 4 * 100 ) 400 9443036224 Pump 3x110
Kundah 415 9445857110
Pushep 150 9445857110
8161
List of State Thermal Generation participating in Flexing
Tot
Capacity On Bar Capacity ON Bar TM
AP
VTPS 1760 630 441
KRSPTNM 1600 800 560
RAYALASEEMA 1650 210 147
Telangana
KTPS 1800 1000 700
Singareni 1200 1200 840
Kakatiya 1100 1100 770
Karnataka
RTPS 1720 880 616
YTPS 1600 800 560
UPCL 1200 600 420
Tamilnadu
NCTPS 1830 210 147
Mettur 1440 210 147
TTPS 105 210 147
NLC 600 360 252
17605 8210 5747
Thermal generation would be regulated to meet LGB. Preferably Thermal generation can be
maximized.
1. All identified Hydro stations starts ramping down from 8:57PM based on grid frequency
2. Grid security and frequency profile would be primary monitoring parameter during the short
time. As discussed during FOLD meeting on 4th April 2020, DSM and merit order should not
be the constraints for control. Only emergency unit tripping control can be given from
SLDC/SRLDC.
3. State Thermal units starts ramping from 9:05 PM
4. State Hydro units would be start ramping based on frequency from 9:09 PM
5. Pump at Kadamparai and Nagarjunasagar would be tripped in case low frequency
6. Wind generation infeed to ISTS has been configured by POWERGRID to trip at frequency
50.20Hz
230kV Tuticorin GS - Betam
230kV Tuticorin GS - Orange
230kV Tuticorin GS - Mytrah
230kV Tuticorin GS - GIREL (chandragiri)
7. All State thermal generation would be maximised as per control area LGB
8. All constituents would maintain ISGS requisition as per control area LGB
9. All Hydro generation would be regulated as per control area LGB
10. Grid normal operation
x-x-x