Cutting Chart for Re-excavation of Angaria Kirtinasha to Shologhar Khal from KM

0.000 to KM 2.500 = 2.500 KM in C/W "Re-excavation of Sureswar Khal & Drainage


Project" under Shariatpur O&M Division, BWDB, Shariatpur during the year 2019-20.

Existin Design Design


Cutting Top
SL Chainag g Bed Bed Bed Side Slope
Bank Level Depth Wide Remarks
: e Level Level width (m)
(m) (m)
(m) (m) (m)
  (Km) L/B R/B         R/B L/B    
1 2 3 4 5 6 7 8 9 10 11 12
1 0.000 4.30 0.85 0.83 0.00 0.83 3.00 6.45 1.28 10.73  
2 0.150 3.60 2.30 2.34 0.00 2.34 3.00 5.40 3.45 11.85  
3 0.300 3.11 3.30 2.60 0.02 2.59 3.00 4.64 4.93 12.57  
4 0.450 3.80 2.50 2.34 0.02 2.32 3.00 5.67 3.72 12.39  
5 0.600 4.75 3.30 2.14 0.02 2.12 3.00 7.10 4.92 15.02  
6 0.750 4.05 4.50 2.05 0.04 2.01 3.00 6.02 6.69 15.71  
7 0.900 3.40 2.80 1.79 0.04 1.75 3.00 5.04 4.14 12.18  
8 1.050 3.15 2.80 2.77 0.05 2.72 3.00 4.65 4.13 11.78  
9 1.200 3.30 3.00 2.67 0.06 2.61 3.00 4.86 4.41 12.27  
10 1.350 2.70 2.27 2.27 0.07 2.20 3.00 3.95 3.30 10.25  
11 1.500 2.85 2.80 2.15 0.07 2.08 3.00 4.17 4.10 11.27  
12 1.650 2.40 2.30 1.90 0.07 1.83 3.00 3.50 3.35 9.84  
13 1.800 2.60 1.80 1.73 0.09 1.64 3.00 3.77 2.57 9.33  
14 1.950 2.30 1.71 1.70 0.09 1.61 3.00 3.32 2.43 8.75  
15 2.100 2.40 1.50 1.01 0.11 0.90 3.00 3.44 2.09 8.54  
16 2.250 1.80 1.40 0.97 0.11 0.86 3.00 2.53 1.93 7.46  
17 2.400 0.70 1.70 0.46 0.12 0.34 3.00 0.87 2.37 6.24  

Cutting Chart for Re-excavation of Kachari Kandi House to Burhan Kazi House
KhalKhouspur tekerhat to angaria kritinasha river from km 0.00 to km 1.000 = 1.000 km in
C/W "Re-excavation of Sureswar Khal & Drainage Project" under Shariatpur O&M
Division, BWDB, Shariatpur during the year 2019-20.
Existing Design Design
Cutting Top
SL Bed Bed Bed
Chainage Bank Level Depth Side Slope (m) Wide Remarks
: Level Level width
(m) (m)
(m) (m) (m)
  (Km) L/B R/B         R/B L/B    
1 2 3 4 5 6 7 8 9 10 11 12
2.2
1 0.000 6.80 0 1.30 0.00 1.30 3.00 10.20 3.30 16.50  
2.5
2 0.150 5.80 0 2.67 0.01 2.66 3.00 8.69 3.74 15.43  
2.5
3 0.300 4.70 0 2.26 0.02 2.25 3.00 7.03 3.73 13.76  
2.3
4 0.450 4.63 0 3.65 0.02 3.63 3.00 6.91 3.42 13.33  
2.5
5 0.600 4.00 0 2.18 0.03 2.15 3.00 5.96 3.71 12.66  
3.5
6 0.750 5.50 0 2.31 0.04 2.28 3.00 8.19 5.19 16.39  
2.9
7 0.900 4.00 0 2.17 0.05 2.13 3.00 5.93 4.28 13.22  
Cutting Chart for Re-excavation of Khouspur tekerhat to angaria kritinasha river from km
0.00 to km 2.850 = 2.850 km in C/W "Re-excavation of Sureswar Khal & Drainage Project"
under Shariatpur O&M Division, BWDB, Shariatpur during the year 2019-20.

Design
Existing Design Cutting Top
SL Bed Remark
Chainage Bank Level Bed Level Bed Depth Side Slope (m) Wide
: width s
(m) Level (m) (m) (m)
(m)
  (Km) L/B R/B         R/B L/B    
1 2 3 4 5 6 7 8 9 10 11 12
1 0.000 2.60 2.80 1.63 -0.40 2.03 3.00 4.50 4.80 12.30  
2 0.150 4.00 4.00 1.79 -0.39 2.18 3.00 6.59 6.59 16.17  
3 0.300 2.30 2.40 1.75 -0.39 2.14 3.00 4.04 4.19 11.22  
4 0.450 2.80 1.70 1.70 -0.38 2.08 3.00 4.77 3.12 10.89  
5 0.600 1.50 1.70 1.11 -0.37 1.48 3.00 2.81 3.11 8.91  
6 0.750 1.40 1.00 0.90 -0.36 1.26 3.00 2.64 2.04 7.68  
7 0.900 1.65 1.80 1.61 -0.35 1.96 3.00 3.00 3.23 9.23  
8 1.050 1.80 1.50 1.46 -0.35 1.81 3.00 3.23 2.78 9.00  
9 1.200 2.40 2.40 2.31 -0.34 2.65 3.00 4.11 4.11 11.22  
10 1.350 2.00 1.78 1.56 -0.33 1.89 3.00 3.50 3.17 9.66  
11 1.500 1.96 2.70 2.56 -0.33 2.89 3.00 3.44 4.55 10.98  
12 1.650 1.75 1.80 1.60 -0.32 1.92 3.00 3.11 3.18 9.29  
13 1.800 3.10 1.90 1.88 -0.31 2.19 3.00 5.12 3.32 11.43  
14 1.950 2.60 3.45 2.06 -0.30 2.36 3.00 4.35 5.63 12.98  
15 2.100 3.30 4.84 2.48 -0.30 2.78 3.00 5.40 7.71 16.11  
16 2.250 4.80 5.14 3.02 -0.29 3.31 3.00 7.64 8.15 18.78  
17 2.400 4.05 2.60 2.82 -0.28 3.10 3.00 6.50 4.32 13.82  
18 2.550 5.00 6.48 3.022 -0.27 3.29 3.00 7.91 10.13 21.03  
19 2.700 4.33 3.90 3.51 -0.27 3.78 3.00 6.90 6.26 16.16  
20 2.850 4.50 6.50 3.52 -0.26 3.78 3.00 7.14 10.14 20.28  
Cutting Chart for Re-excavation of of Kachikata river to Sosthal Assory Kendro
Kolchori Khal from KM 0.000 to KM 5.000 = 5.000 KM in C/W "Re-excavation of
Sureswar Khal & Drainage Project" under Shariatpur O&M Division, BWDB,
Shariatpur during the year 2019-20.

Chainag Bank Design Side Slope Remark


Existing Design Cutting Top
SL e Level Bed (m) s
Bed Level Bed Depth Wide
: R/ width
(m) Level (m) (m) (m)
(Km) B L/B (m) R/B L/B  
1 2 3 4 5 6 7 8 9 10 11 12
2.5 2.5 4.3 4.3
1 0.000 0 0 2.43 -0.40 2.83 6.00 5 5 14.70  
2.8 3.0 4.7 5.1
2 0.150 0 3 2.13 -0.39 2.52 6.00 9 3 15.92  
2.5 2.6 4.3 4.6
3 0.300 0 9 2.29 -0.39 2.68 6.00 4 2 14.96  
3.2 3.0 5.3 5.0
4 0.450 0 0 2.27 -0.38 2.65 6.00 7 7 16.44  
3.2 3.5 5.3 5.8
5 0.600 0 0 2.26 -0.37 2.63 6.00 6 1 17.16  
3.0 2.8 5.1 4.7
6 0.750 5 0 2.25 -0.36 2.61 6.00 2 4 15.86  
2.4 2.4 4.1 4.1
7 0.900 0 0 2.23 -0.36 2.59 6.00 4 4 14.28  
2.4 2.8 4.1 4.7
8 1.050 0 0 2.23 -0.35 2.58 6.00 3 3 14.85  
2.3 1.5 3.9 2.7
9 1.200 0 0 1.12 -0.34 1.46 6.00 6 6 12.72  
1 2.8 2.7 4.7 4.5
0 1.350 0 0 2.21 -0.33 2.54 6.00 0 5 15.24  
1 1.9 1.7 3.3 3.0
1 1.500 0 0 1.38 -0.32 1.70 6.00 3 3 12.36  
1 1.7 1.7 3.0 3.0
2 1.650 0 0 1.27 -0.32 1.59 6.00 3 3 12.06  
1 2.1 1.9 3.6 3.3
3 1.800 5 0 1.25 -0.31 1.56 6.00 9 2 13.01  
1 1.8 1.8 3.1 3.1
4 1.950 0 0 1.38 -0.30 1.68 6.00 5 5 12.30  
1 1.9 1.9 3.2 3.2
5 2.100 0 0 1.52 -0.29 1.81 6.00 9 9 12.57  
1 2.0 1.9 3.4 3.3
6 2.250 0 5 1.50 -0.29 1.79 6.00 4 6 12.80  
1 1.9 1.7 3.2 2.9
7 2.400 0 0 1.48 -0.28 1.76 6.00 7 7 12.24  
1 1.8 1.8 3.1 3.1
8 2.550 0 0 1.44 -0.27 1.71 6.00 1 1 12.21  
1 1.9 1.7 3.2 3.0
9 2.700 0 5 1.43 -0.27 1.70 6.00 6 3 12.29  
2 2.4 2.1 3.9 3.5
0 2.850 0 0 1.91 -0.26 2.17 6.00 9 4 13.53  
2 1.8 1.9 3.1 3.2
1 3.000 5 0 1.40 -0.25 1.65 6.00 5 3 12.38  
2 1.8 1.6 3.0 2.7
2 3.150 0 0 1.30 -0.24 1.54 6.00 6 6 11.82  
2 3.300 2.0 1.5 1.49 -0.24 1.73 6.00 3.4 2.6 12.05  
Cutting Chart for Re-excavation of of Kachikata river to Sosthal Assory Kendro
Kolchori Khal from KM 0.000 to KM 5.000 = 5.000 KM in C/W "Re-excavation of
Sureswar Khal & Drainage Project" under Shariatpur O&M Division, BWDB,
Shariatpur during the year 2019-20.

Chainag Bank Design Side Slope Remark


Existing Design Cutting Top
SL e Level Bed (m) s
Bed Level Bed Depth Wide
: R/ width
(m) Level (m) (m) (m)
(Km) B L/B (m) R/B L/B  
1 2 3 4 5 6 7 8 9 10 11 12
3 5 0 4 1
2 1.9 1.7 3.2 2.9
4 3.450 0 0 1.53 -0.23 1.76 6.00 0 0 12.09  
2 1.9 1.7 3.1 2.8
5 3.600 0 0 1.53 -0.22 1.75 6.00 8 8 12.06  
2 1.6 2.0 2.7 3.3
6 3.750 0 5 1.60 -0.21 1.81 6.00 2 9 12.11  
2 2.1 2.0 3.4 3.3
7 3.900 0 0 1.76 -0.21 1.97 6.00 7 2 12.78  
2 1.9 2.4 3.1 3.9
8 4.050 0 0 1.64 -0.20 1.84 6.00 5 0 13.05  
2 1.9 2.3 3.1 3.7
9 4.200 0 0 1.52 -0.19 1.71 6.00 4 4 12.87  
3 1.6 3.7 2.6 5.8
0 4.350 0 0 1.40 -0.18 1.58 6.00 7 2 14.49  
3 2.3 2.7 3.7 4.3
1 4.500 0 0 1.66 -0.18 1.84 6.00 2 2 14.04  
3 3.7 3.9 5.8 6.1
2 4.650 0 0 1.50 -0.17 1.67 6.00 1 1 17.91  
3 2.2 2.0 3.5 3.2
3 4.800 0 0 2.06 -0.16 2.22 6.00 4 4 12.78  
3 2.0 2.0 3.2 3.2
4 5.000 0 0 1.87 -0.15 2.02 6.00 3 3 12.45  