CONTRACT - 464, CONSTRUCTION OF FOUR LIFTING STATIONS

EMIRATE OF ABU DHABI - DEPARTMENT OF MUNICIPAL AFFAIRS - MUNICIPALITY OF ABU DHABI CIT
BILL OF QUANTITIES

M & E
Item Description Unit Quantity new Rate amount

DH
SECTION XXIV
LIFTING /PUMPINGSTATIONS
& SUBSTATIONS -M & E WORKS

Re-design, engineering, Modelling,


shop drawings, submit for approval,
manufacture, inspect, factory test,
deliver to Site, store, erect, install,
join, test on Site, re-test, commission
all Plant, material etc. as specified.
Allow for services to the Department
and Engineer, training of operators,
co-ordination with authorities and
other parties working in or near to
the Site, for performance testing,
guarantee & maintenance and all
incidental labour material.
Dimensions for pipes and fittings
may alter subject to the
requirements of the plant proposed
by the Contractor.
Double flanged non-return valve DN 900,
No. 3
24.10 PN16.                                ‐
Carried forward                               ‐
Brought forward                               ‐
24.11 Double flanged non-return valve DN 400,
No. 2
PN16.                                ‐

Carried forward                               ‐

24.26 Flap valve DN 700. As specified No. 6                               ‐

24.27 Flap valve DN 400. As specified No. 6                               ‐

24.29 Stainless steel 316L basket Screen including No. 3                               ‐


guide rail and chain