B1 B2 B3 B4
20th floor
18th floor
15th floor
12th floor
11th floor
10th floor Ayub-0% Ayub-80% Sooraj-80% Ayub-70%

A1-B1 A1-B2 A1-B3 A1-Powder


6th floor HOLD (ayub) HOLD (ayub) HOLD (ayub) 0% (ayub)
5th floor HOLD (ayub) HOLD (ayub) HOLD (ayub) Suraj-100%
4th floor anwar-100% Ayub-90% Suraj-90% Ayub-100%
3rd floor ayub-65% to start ayub-90% ayub-20% Ayub- 0%(w/p issue)
te

Powder

Ayub-90%

A2-B1 A2-B2 A2-B3 A2-Powder


Suraj-0% (marble lift) Ayub-70% Ayub-70% Suraj-0% (marble lift)
Suraj-0% (marble lift) Suraj-80% suraj-80% Suraj0% (marble lift)
Ayub-100% Suraj-100% Suraj-100% Suraj-100%
Suraj- 70% Suraj-90% Suraj- 90% Suraj-20%