Professional Documents
Culture Documents
Compañía de
de Minas
Minas
Buenaventura
Buenaventura S.A.A.
S.A.A.
Results
Results &
& Outlook
Outlook
September,
September, 2006
2006
Cautionary Statement
Million Oz
10
Million Oz
60
8
6 40
4
20
2
0 0
2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
Copper
2,500 2,246
2,000
1,500 1,275
000 ST
1,000
0
2000 2001 2002 2003 2004 2005
Increased our equity gold, silver and copper
production
Gold Silver
16.0
2.00 1.81 15.4
16 14.3
1.80 1.64
1.54 1.50 12.9 13.1
14 12.5
1.60 11.6
1.25
1.40 12
1.20 1.04
M illio n O z
0.91 10
Million O z
1.00
8
0.80
6
0.60
0.40 4
0.20 2
0.00
2000 2001 2002 2003 2004 2005 2006e 0
2000 2001 2002 2003 2004 2005 2006e
Copper
25 20.90
19.10
20
15
8.95
000 ST
8.73 8.83
7.21 7.78
10
0
2000 2001 2002 2003 2004 2005 2006e
Improved our economic results
Total Revenues EBITDA BVN's operations
336.9 344.4 112.5
120
350
96.6
259.6
300 100 83.5
US$ Million
250 80
181.3 59.3
US$ Million
200
60
150
40
100
50 20
0 0
2002 2003 2004 2005 2002 2003 2004 2005
600
250
208.9
500 427.9
341.0 200
400
US$ Million
US$ Million
100
200 53.4
100 50
0 0
2002 2003 2004 2005 2002 2003 2004 2005
Improved quartely economic results
2Q04 / 2Q05 / 2Q06
Total Revenues EBIT DA BVN's operations
168.6 84.9
90
180
80
160
140 70
US$ Million
120 88.1 60
79.4
US$ Million
100 50
40
28.5 28.0
80
60 30
40 20
20 10
0 0
2Q04 2Q05 2Q06 2Q04 2Q05 2Q06
250 120
100 77.2
200
66.1
US$ Million
116.9 U S$ M illion 80
150
87.3
60
100
40
50
20
0 0
2Q04 2Q05 2Q06 2Q04 2Q05 2Q06
To achieve this, it was required:
Orcopampa: Production vs. Reserves & Resources
1,400
1,200
1,000
Resources
800
000 O z
Reserves
600
400
211 233 235
146 160 181
200
00
2001 2002 2003 2004 2005 2006E
600
500
Resources
400
000 Oz
Reserves
300
200
97 104 105
72 84
100 35
00
2001 2002 2003 2004 2005 2006E
70
60 Resources
50 Reserves
40
30
20
8.7 9.8 9.4 9.6 10.2 11.0
10
10
0
0
2001 2002 2003 2004 2005 2006E
55
50
45
40
35
Million Oz
30
25
20 Resources
15 Reserves
10
55 1.90 2.29 2.85 3.02 3.33 2.50
0
0
2001 2002 2003 2004 2005 2006e
….and has already produced 21.0 million Oz of gold since
1993
CERRO VERDE
Highlights
Future Production
• Oxides ~ 100k tons / year Cu in Cathodes
• Sulfides ~ 200K tons / year Cu in Concentrates
• Total ~ 300K tons / year Cu
CERRO VERDE
Primary Sulfide Project – Key Parameters
Tantahuatay
4. Mine Marcapunta
Marcapunta
Projects
Hualgayoc development
Los Pircos Poracota
Poracota
LA ZANJA YANACOCHA 3. Feasibility and
8°S reserve generation La
La Zanja
Zanja
Tantahuatay
Pozo Rico In Out
COLQUIJIRCA Pozo Rico Soras
2. Resource
Prospects
UCHUCCHACUA
MARCAPUNTA delineation
Los Pircos Layo
Lima
1. Drilling & Trapiche Hualgayoc
tunneling
Pampa Andino Trapiche El Faique Pampa Andino
ANTAPITE ORCOPAMPA
Layo
PORACOTA
16°S
Soras Development projects
CERRO VERDE
Advanced projects
500 Km
Orcopampa Mining District
PORACOTA Layo
(75%BVN) SORAS
(BVN)
Huamanihuayta ORCOPAMPA
Sorayas (BVN)
Chipmo
GAL 855 E
3,600 14R
13R
3640 Level
3540 Level
1
3,500 2
3490 Level
11 3
7 6 10
9 3440 Level
3,400 5 3390 Level
4
500 m 8
3 800 V V V V V V
V V V
V V
V V V V
V V
V V
V V
V
V V V V V
V
V
3 700
V
V V
V
V
3660 level V V
V
3610 Level
3 600
3540 Level
SW NE
Height
(m)
Ch-2
Qcol
2.0 / 21.1 8.8 / 27.4
4800 m Manto Rojo 4.6 / 10.6 C. 785
13.3 /9.5 Manto Dorado
2.1 / 8.1 Ch-1
2.25 / 9.0 5.1 / 8.2
C. 720
9.2 / 15.1 15.8 / 13.1
3.2 / 11.0
Manto Aguila 14.6 / 12.3
2.5 / 14.4
2.1 / 13.4
4600 4.4 / 19.8
Silicification
NRM
NRM -- Sulfides:
Sulfides: 1’256,150
1’256,150 DST
DST @
@ 10.2
10.2 g/t
g/t Au
Au
Uchucchacua Mining District
UCHUCCHACUA RESERVES:
RESERVES:3.96
3.96Mt
Mt@@17.0
17.0oz/t
oz/tAg,
Ag,67.43
67.43Moz
MozAg
Ag
N
UCHUCCHACUA
(December31,
(December 31,2004)
2004) NRM
NRM ::1.06
1.06Mt
Mt@@16.1
16.1oz/t
oz/tAg,
Ag,17.00
17.00Moz
MozAg
Ag
UCHUCCHACUA RESERVES:
UCHUCCHACUA RESERVES:5.42
5.42Mt
Mt@@16.4
16.4oz/t
oz/tAg,
Ag,88.95
88.95Moz
MozAg
Ag
(December31,
(December 31,2005)
2005)NRM
NRM ::1.78
1.78Mt
Mt@@17.4
17.4oz/t
oz/tAg,
Ag,30.94
30.94Moz
MozAg
Ag
Uchucchacua
Oyó
Oyón
Mallay
0
Jatun Chacua
10 5Km 10
kilometers
60 veins & 15 orebodies, Uchucchacua District
LEGEND
N-8828
NW Upper Jumasha Formation
LUCRECIA
Marker Horizon
Middle Jumasha Formation
Lower Jumasha Formation
A
SOCORRO Intrusives
MP
IPA ELIANA
CH VANESA
CA
1
EA
DR
SOC
MAGALY
AN
ORR
O3
SOC
ORRO LUCERO
KEY
Veins
Z
LU
ROSA ROSARIO
IRMA VIVIANA
ROSA 2 Ore bodies
RIA 1
N-8826
RA
LUCIA
PET
VICTO
BONNIE
A
EL
JULIAN
UR RA
QU CA
CARMEN Faults
AS
RL
NI
KA
RO
MONICA
VE
CASUALIDAD Intrusives
SANDRA RUBI - RITA RUB
M
I
AR
KE
JAQUELINE
R
RI
-2
Target areas
TA
EDITH
40
LE
A1
VE
AMP
MOP
L
2
PLO
PA
AM
MARION MA
Syncline
OP
RIO
3A N
OM
PLOMOPAMPA
PL
V-
3 A
12
0L
Anticline
4
EV
VE
EL
NT
AN
ILL
A
HUANTAJALLA
Tunnel
N-8824 Lakes
SE
1 Km
E-316
E-318
60 veins & 15 orebodies, Uchucchacua District
NW SE
Height
(m)
CARMEN AREA
5,000
A2
4,600 ROSA 2
P
PAM
IRMA - VIVIANA
MO
MARION
P LO
EDITH
CA
RIT
S
RDE
GINA
TIN
CH
LUCERO
MELISA
A
VA N
A
IPA
4A
LUCIA
LOU
ESA
MP
A
4,200 LIZA
ELIANA
3A
CPO. RUBI
MARION S 120 Level
MAGALY
A
CHACU
EL
QU
RA
ROSA
UCHUC
3,800
OR R
AMPA
S OC
CACHIP
LEGEND KEY
Upper Jumasha Formation Sulfide orebodies
Marker Horizon Oxide orebodies
1 1Km
Km Middle Jumasha Formation Veins
Lower Jumasha Formation Faults
Intrusives
Marcapunta Project: Section 360,610 E
N
Height (m)
C° M arcapunta S
4500 m
4000 m
?
Porphyry
Dom os dedacite domes
dacitas argilizadas O xidos
Oxides OGold in óxidos
ro en oxides
Mineralized
Brechas limestone
de caliza breccias
silicificadas Arsenical
Cobre copper
y oro arsenicales
Sulfuros
Sulfides and gold
Red
A bed sandstones
reniscas rojas frescas Cobre no arsenical
Non arsenical copper
Marcapunta west declineRampa Marcapunta Oeste
Infill drilling: 18,000 m, completed
Advanced A vance Sondaje diam antino 500
(33 DDH m
– RC)
Projected Proyectada Total: 35,000 m. (118 DDH – RC)
NRM 200 m
NRM -- Sulfides:
Sulfides: 123’135,520
123’135,520 DST
DST @
@ 1.9%
1.9% Cu,
Cu, 0.5
0.5 g/t
g/t Au,
Au, 0.7
0.7 oz/t
oz/t Ag
Ag
NRM - Oxides : 13’216,210 DST
NRM - Oxides : 13’216,210 DST @ @ tr Cu, 1.9 g/t Au, 2.0 oz/t Ag
tr Cu, 1.9 g/t Au, 2.0 oz/t Ag
La Zanja: Care & maintenance plus engineering and
exploration … ¡More ounces!
Pampa Verde
Open Pit
9’246,000 N
NRM
NRM -- Oxides:
Oxides: 19’196,000
19’196,000 DST
DST @
@ 0.8
0.8 g/t
g/t Au,
Au, 0.2
0.2 oz/t
oz/t Ag,
Ag, in
in San
San Pedro
Pedro &
& Pampa
Pampa Verde
Verde
Vision to 2014
Buenaventura pursues to be a globally
competitive Mining and Metallurgical
Company, as well as leaders in terms of
profitability, value creation for its
shareholders, and safety and opportunities
for its employees. The Company is
committed to environmental issues and
generating strategic alliances with its partners
to promote sustainable community
development.
Strategy
• Focus on precious metals mining in Peru and open to base
metals
• Remain a strong operating company
• Upgrade operations and maintain high standards of safety,
environmental protection & social responsibility
• Generate reserves through exploration
• Pursue acquisitions preferably in Latin America
• Share risks through joint ventures
• Permanent contact with our investors
• Commitment to best practices of corporate governance
www.buenaventura.com