Department of Civil Engineering

Indian Institute of Technology Roorkee

Table –1 : Results of Roughness Measurements

Name of Road: MP Road No. 1 (From DND to T. Point, Sector – 12, 22, & 56)

Direction 1 - DND to T. Point Sector – 12, 22, & 56


Direction 2 - T. Point Sector – 12, 22, & 56 to DND Date: 12.03.2010

Direction - 1 Direction - 2
Chainage
Lane - 1 Lane - 2 Lane - 3 UI Lane - 1 Lane - 2 Lane - 3 UI
(Km.)
Bump Length Bump Length Bump Length Cm/Km Bump Length Bump Length Bump Length Cm/Km
1 155 400 162 400 180 400 414.2 148 400 174 400 141 400 385.8
2 365 1000 427 1002 293 1000 361.7 349 1000 314 1000 278 1002 313.5
3 303 1002 279 1002 299 1000 293.3 322 1002 367 998 249 1000 312.7
4 400 1000 385 998 328 1002 371.0 344 1000 331 1002 266 1000 313.5

Bump in cm and Length in


m.

Lane – 1 : Outer Lane, Lane – 2 : Middle Lane, Lane – 3 : Inner Lane