Professional Documents
Culture Documents
Sl.
Rule / Section No.
No
1 U/S 67
2 U/S 43 (1)
3 U/S 53
4 U/S 57
Applicable Act / Rule : Central Electricity Authority ( Measures Relating to Safety and Electric
Sl.
Rule / Section No.
No
1 Regulation 3
3 Regulation 16
4 Regulation 18
5 Regulation 19
6 Regulation 23(1)
7 Regulation 30(1)
8 Regulation 31
9 Regulation 36
10 Regulation 42
11 Regulation 43(2)
12 Regulation 45
13 Regulation 60
14 Regulation 61
1 Regulation 4
Applicable Act / Rule : Central Electricity Authority (Installation and Operation of Meters) Reg
1 Regulation 4.1
2 Regulation 7.2(b- I)
3 Regulation 8
4 Regulation 9 (1,2)
5 Regulation 10
6 Regulation
(ii)
12 (1) (a),
7 Regulation 13(2)&(3)
8 Regulation 14(2)
9 Regulation 15(2)
10 Regulation 18(2)
Applicable Act / Rule : Gujarat Electricity Regulatory Commission (Electricity Supply Code an
Sl.
No Rule / Section No.
1 Regulations 3.1
2 Regulation 4.26
3 Regulation 4.27(4)
4 Regulation 4.28
5 Regulation 4.36
6 Regulation 4.37
7 Regulation 4.39
8 Regulation 4.40
9 Regulation 4.47
10 Regulation 4.49
11 Regulation 4.56
12 Regulation 5.13
13 Regulation 5.16,
5.17 & 5.18
14 Regulation 6.1
15 Regulation 6.2
16 Regulation 6.12
17 Regulation 6.26
18 Regulation 6.31
19 Regulation 6.33
20 Regulation 6.35
21 Regulation 9.4
22 Regulation 9.7
Applicable Act / Rule : Gujarat Electricity Regulatory Commission (Licensees Power to Recove
Sl.
Rule / Section No.
No
1 Regulation 4.1
3 Regulation 5 (I)
4 Regulation 6
Applicable Act / Rule : Gujarat Electricity Regulatory Commission (Standard of Performance o
Sl.
No Rule / Section No.
1 Regulation 3.7
2 Regulation 5.1
3 Regulation 5.2
4 Regulation 5.3
5 Regulation 5.4
6 Regulation 5.5
7 Regulation 5.6
8 Regulation 5.7
9 Regulation 5.9
10
Regulation 5.11
11
13 Regulation 6.3
14 Regulation 6.5
15 Regulations
8.3
8.1, 8.2,
Regulations 9.2 to
16 9.4
Regulation 12.1,
17 12.2
18 Regulation 13.1
Applicable Act / Rule : Gujarat Electricity Distribution Code 2004 and its amendments
1 Section 4.5
2 Section 5.3
3 Section 6.3(7)
4 Section 6.4(3)
5 Section 6.8
Attachment 1
6 Section 12(1)
Applicable Act / Rule : Gujarat Electricity Regulatory Commission (Demand Side Managemen
2 Regulation 7.1
3 Regulation 7.2
4 Regulation 8
5 Regulation 9.1
6 Regulation 10.1
7 Regulation 11.1,
11.2
8 Regulation 12
9 Regulation 13
10 Regulation 15
11 Regulation 17
Applicable Act / Rule : Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar
Sl.
Rule / Section No.
No
1 Regulation 4
2 Regulation 5
5 Regulation 7
Prepared by
Core Team / Legal Team
1- Fully complied, 2- Not relevant , 3- Partially complied, 4- Not complied
Torrent Power
EVALUATION OF COM
: Electricity Act 2003
Rule : Central Electricity Authority ( Measures Relating to Safety and Electric supply) Regulations, 2010
Requirement and expectation
Ensure:
1) all electric supply lines, wires, fittings and apparatus which are on a
consumer's premises, are in a safe-condition and fit for supplying
electricity.
(a) every motor, generator, transformer and other electrical plant and
equipment together with apparatus used for controlling or regulating
the same;
(b) all supports of overhead lines of voltage exceeding 650 V which can
be easily climbed upon without the aid of ladder or special appliances;
(c) luminous tube sign requiring supply, X-ray and similar high frequency
installations of voltage exceeding 650 V but not exceeding 33 kV
Street Boxes shall not contain gas pipe, and precaution shall be taken to
prevent, as far as reasonably possible, any influx, of water or gas.
Where an installation is already connected to the supply system o the
supplier or trader, every such installation shall be periodically inspected
and tested at interval not exceeding five years by Electrical Inspector or
by the supplier as many be directed by State Government in this behalf
or in the case of installations belonging to or under the control of
Central Government, And in the case of Installation in mines, oil fields
and railways, by the Central Government.
Clearance from building of lines of voltage and service line not exceed
to 650V
Ensure to comply with the provisions specified in the log sheet attached
Rule : Central Electricity Authority Furnishing of Statistics, Returns and Information Regulations- 2007
Requirement and expectation
Rule : Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006. and its all
All interface meters, consumer meters and energy accounting and audit
meters shall be of static type.
The consumer meter shall be installed by the licensee either at
consumer premises or outside the consumer premises: Provided that
where the licensee installs the meter outside the premises of the
consumer, then the licensee shall provide real time display unit at the
consumer premises for his information to indicate the electricity
consumed by the consumer: Provided further that for the billing
purpose, reading of consumer meter and not the display unit shall be
taken into account.
Installation of meters
(1) Generating company or licensee, as the case may be, shall examine,
test and regulate all meters before installation and only correct meters
shall be installed.
(2) The meter shall be installed at locations, which are easily accessible
for installation, testing, commissioning, reading, recording and
maintenance. The place of installation of meter shall be such that
minimum inconvenience and disruptions are caused to the site owners
and the concerned organizations.
Sealing of meters
(1) Sealing Arrangements
(a) All meters shall be sealed by the manufacturer at its works. In
addition to the seal provided by the manufacturer at its works, the
sealing of all meters shall be done as follows at various sealing points as
per the standards given in the Schedule:
Sealing of interface meters, shall also be done by both the supplier and
the buyer.
(ii) Sealing of consumer meters shall be done by the licensee.
(2)The consumer shall, as far as circumstances permit, take precautions
for the safety of the consumer meter installed in his premises belonging
to the licensee.
(3) Licensee shall be responsible for the safety of the consumer meter
located outside the premises of the consumer and the consumer shall
be responsible for the safety of the real time display unit installed by
the licensee in consumer premises.
Rule : Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regula
The Distribution Licensee will not provide more than one connection for
one premise or it adjoining/contiguous premises belonging to same
owner if these are not separated by a public road or by private premises
-
The overall timeline for releasing new electricity connection, from the
date of receipt of application, shall be as per GERC (Standard of
perfpormance of Distribution Licensee) Regulations, 2005 and
amendments thereof.
In case the applicant had opted to get the extension work done himself
and/or the applicants installation in the premise where the supply has
been demanded is completed in all respect and tested by the
supervisor, holding a certificate of competency issued or recognized by
the Government, the applicant should sign and submit to the
Distribution Licensee, completion and test report of the installation
along with necessary test report charges specified in GERC (Licensee's
Power to recover Expenditure incurred in providing electricity and other
Miscellaneous Charges) Regulations, 2005, as amended from time to
time, the licensee shall on receipt of the test report stipulate a date for
testing the consumer installation through mutual consultation, under
written acknowledgment. The date of testing must by scheduled within
7 working days in Class-l cities and urban Areas and l0 working days in
Rural areas form the date of receipt of such information:
The applicant or his authorised representative shall be present during
testing along with licensed Electrical Contractor or his authorised
representative who had under taken the installation. If the consumer
installation is found satisfactory the licensee shall arrange to install the
meter and accessories and seal the meter, meter box, and accessories
in the presence of consumer and provide electricity supply with in 2
working days or the date of testing.
The applicant shall apply for temporary supply in the format prescribed
in Annexure I or II (as applicable) to this Code along with the documents
prescribed in clauses 4.15 - 4.20 of this Code as
well as a No Objection Certificate (NOC) from the local authority if the
supply is required at a place owned by the local authority:
After the period of temporary supply is over and supply has been
disconnected, the licensee shall prepare the final bill on the basis of
actual consumption. Deposit amount after adjusting unpaid dues, and
after deducting material (meter, transformer, isolator etc.) charges at
the rate of l% every month and actual cost incurred for erection and
dismantling charges, which shall not be more than 100% of the material
cost, shall be refunded by the licensee. Refund of these securities shall
be made within
60 days from the date of disconnection, failing which the licensee shall
be liable to pay interest at a rate equivalent to the late payment
surcharge.
The consumer shall provicle space of requisite dimensions and at
convenient location as mutually agreed between the consumer and the
licensee. free of charge, for erection / installation of that part
of service line that falls within his premises, transformers, switch gear,
meter and all other apparatus up to the point of commencement of
supply. The whole of service line and other apparatus shall be deemed
to be the property of the licensee and shall remain under his control.
Retain one copy signed by the consumer regarding the intimation of all
seals affixed on the meter and metering Apparatus.
Retain one copy signed by the consumer regarding the information any
abnormalities or irregularities in meter or meter seals or cut outs.
It shall be the licensee's responsibility to satisfy itself regarding the
accuracy of the meter before it is installed and the licensee may test
them for this purpose. The licensee shall conduct periodical
inspection/testing and calibration of the meters as specified by the CEA
(Installation & Operation of Meters) Regulations, 2006 and all
subsequent amendments. The licensee shall give the accuracy report of
the meter by the laboratory to the consumer and also give periodical
inspection and testing and calibration report of the meter to the
consumer.
The licensee shall inspect and check the correctness of 'the meter
within time period specified in GERC (Standard of Performance of
Distribution Licensee) Regulations,2005. as amended from time to time.
The total harmonic distortion for voltage at the connection point shall
not exceed 5% with no individual harmonic higher than 3% and the total
harmonic distortion for current drawn from the transmission system at
the connection point shall not exceed 8%.
Rule : Gujarat Electricity Regulatory Commission (Licensees Power to Recover Expenditure Incurred in
After receiving the complaint, it's should be identified in one hour for
further investigation
In case of routine line fault, the licensee shall restore the power supply
to the consumer within 8 working hours of receiving the complaint
/information in urban areas and within 24 hours of receiving the
complaint /information in rural areas.
In case of fire due to short circuit of LT lines, the licensee shall restore
the power supply to the consumer within 6 working hours on control of
fire after isolation in urban areas and within 30 hours of receiving the
complaint /information in rural areas.
The licensee shall ensure that supply is normally restored `by 6 p.m. The
supply to essential services shall be maintained through prior
consultation with providers of such services.
The Licensee and the Consumers shall be responsible for the provision
and maintenance of clear, unambiguous signs and labels indicating the
numbering and / or name of the equipment / apparatus and circuit at
the substations and connection sites. The equipment installed shall
conform its relevant I.S specification and the ratings and salient
specification shall be maintained on the equipment’s nameplate. No
electrical equipment shall be used without its manufacturers nameplate
permanently affixed to it. In the event of such discrepancies observed,
the same
shall be treated as per pertinent section of Electricity Act, 2003.
Rule : Gujarat Electricity Regulatory Commission (Demand Side Management) Regulations, 2012
Submit the DSM Plan before 6 months of the filing of MYT Petition.
Rule : Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Syste
Requirement and expectation
Various activities and different authorities are associated with the Solar
Rooftop PV project. It is necessary that the different entities carry out
the works within
prescribed time limit.
Prepared by
Core Team / Legal Team
2- Not relevant , 3- Partially complied, 4- Not complied
Torrent Power Ltd. -Distribution
EVALUATION OF COMPLIANCE OBLIGATIONS
Compliance
Records/Form Action plan Resource
Observation / Findings status
Ref. (TPLD) proposed Requirement
(1/2/3/4)
Application process is
SAP Data followed 1
OCP followed. 1
Performance report
submitted to Regulatory
department and than
Available Regulatory department 1
submit to GERC in
specified format.
ectric supply) Regulations, 2010 and its all amendment 2015 & 2018
Records/Form Complianc Action plan Resource
Observation / Findings e status Requirem
Ref. (TPLD) (1/2/3/4) proposed ent
Meter
reading Record of complaint and 1
report, MSP MSP survey sheet.
survey data
Provision already 1
provided in our SA.
OCP followed. 1
OCP followed 1
Hard copy 1
It is mention TR where it
necessary 1
Approval of electrical
Hard copy inspector taken before 1
charging .
HV(TPD01-DIS01-GDL-
001 and TPD01-DIS01- 1
GDL002)
Data to commission
submit by Regulatory
department at
Available in prescribed interval i.e.
Electronic 30th June annually. 1
format Necessary data
information given by
distribution to regulatory
department.
Complianc Resource
Records/Form Observation / Findings e status Action plan Requirem
Ref. (TPLD) (1/2/3/4) proposed ent
Record of meter
PO copy maintained. 1
Meter installed after
mutual consultation with
consumer., Meter 1
installed on the
compound wall is on the
premises.
de and Related Matters) Regulations, 2015(2005- is repealed from 24/09/2015), and it amendments 201
Complianc Resource
Records/Form Action plan
Ref. (TPLD) Observation / Findings e status proposed Requirem
(1/2/3/4) ent
After receiving
application site survey is
carried out by
SAP Data Distribution team and 1
suspected cases are
referred back to CS/KA
for necessary act ion.
Monitoring the
application processing
SAP Data module and OCP 1
followed.
HV(TPD01-DIS01-GDL-
001 and TPD01-DIS01- 1
GDL002)
Meter connection is
provide at all service 1
connection.
Regular random
harmonic measurement
at customer premises is
being carried along with
third party observer of
SAP data / CERS ( Consumer 1
Excel Education and Research
Society). In addition to
this we have introduced
harmonic measurement
of LT services during
accuracy check.
ecover Expenditure Incurred in Providing Supply and Other Miscellaneous Charges) Regulations, 2005 a
SAP Data 1
SAP Data 1
Website 1
ance of Distribution Licensee) Regulations, 2005
Complianc Resource
Records/Form Action plan
Ref. (TPLD) Observation / Findings e status proposed Requirem
(1/2/3/4) ent
Complianc Resource
Records/Form Observation / Findings e status Action plan Requirem
Ref. (TPLD) proposed
(1/2/3/4) ent
HV(TPD01-DIS01-GDL-
001 and TPD01-DIS01-
GDL002) and LV(TPD01- 1
DIS00-GDL-002) Network
Guideline manual
SCADA and
intermediate 1
meter
proper size of SA
provided. 1
Complianc Resource
Records/Form Observation / Findings e status Action plan Requirem
Ref. (TPLD) (1/2/3/4) proposed ent
Physical
record &
Electronic Assessment Report 1
data
Physical
Record &
Electronic 1
Data
Physical
Record & 1
Electronic
Data
Physical
Record & 1
Electronic
Data
Physical
Record & 1
Electronic
Data
Physical
Record & 1
Electronic
Data
Physical
Record & 1
Electronic
Data
p Solar PV Grid Interactive Systems) Regulations, 2016 and its amendment 2017, 2020
Records/Form Complianc Action plan Resource
Observation / Findings e status Requirem
Ref. (TPLD) (1/2/3/4) proposed ent
Reviewed by
Section Head
Manager / AGM
Doc No.: TPD01-DIS00-ECO-2019-20-Q3
Department: Distribution
Date :
Responsibility Target
sanjeevchauhan@torrentpower.comvinaypagedar@TORRENTPOWER.COM
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhantorrentpower.com,
dipakthakkar@torrentpower.com
sanjeevchauhantorrentpower.com,
zahirwykes@torrentpower.com
Responsibility Target
sanjeevchauhan@torrentpower.com,
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com,dipakthakkar@torrentpower.com
sanjeevchauhan@torrentpower.com,dipakthakkar@torrentpower.com
sanjeevchauhan@torrentpower.com,dipakthakkar@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrnetpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrnetpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrnetpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com,dipakthakkar@torrentpower.com
sanjeevchauhan@torrentpower.com,
sanjeevchauhan@torrentpower.com
Responsibility Target
sanjeevchauhan@torrentpower.comchetanbubdela@torrent.com
Responsibility Target
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
Responsibility Target
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.comvinaypagedar@TORRENTPO
sanjeevchauhan@torrentpower.com,zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
vinaypagedar@TORRENTPOWER.COM
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.com
zahirwykes@torrentpower.com
mayurdave@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.comvinaypagedar@TORRENTPOWER.COM
sanjeevchauhan@torrentpower.com,
zahirwykes@torrentpower.com
sanjeevchauhan@torrnetpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com, dipakthakkar@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
medidiphanendra@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com,zahirwykes@torrentpower.commedidiphanendra@torren
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
Responsibility Target
zahirwykes@torrentpower.commayurdave@torrentpower.comsanjeevchauhan@torrnetpower
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.commayurdave@torrentpower.comsanjeevchauhan@torrnetpower
Responsibility Target
sanjeevchauhan@torrentpower.comdipakthakkar@torrentpower.comzahirwykes@torrentpow
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
sajeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
sajeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrnetpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.comzahirwykes@torrentpower.com
Responsibility Target
sanjeevchauhan@torrnetpower.comdipakthakkar@torrentpower.com
sanjeevchauhan@torrnetpower.comdipakthakkar@torrentpower.com
sanjeevchauhan@torrnetpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrentpower.com
sanjeevchauhan@torrnetpower.comzahirwykes@torrentpower.com
sanjeevchauhan@torrnetpower.comdipakthakkar@torrentpower.com
Responsibility Target
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
sanjeevchauhan@TORRENTPOWER.COM
17, 2020
Responsibility Target
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
zahirwykes@torrentpower.comsanjeevchauhan@torrentpower.com
Approved by
Department Head
VP
Format No: TPD00-COR00-MRP-006-F03, Rev No: 01
01-DIS00-ECO-2019-20-Q3
Distribution
24.02.2020
Remarks
Remarks
Remarks
Remarks
For LT Service :
Meter, PSM Meter
For HT and LTMD
service : Key account
For LT Service :
Meter, LT, PSM
For HT and LTMD
service : Key account
For LT Service :
Meter, PSM
For HT and LTMD
service : Key account
Remarks
Remarks
Remarks