FORMAT & CONTENT FOR DESIGN PROJECT 2

(FINAL REPORT)

TABLE OF CONTENT
Formatively

EXECUTIVE SUMMARY
Brief overall of the proposed project (maximum ½ page)

CHAPTER 1

Overview of the project


 Project background
 Feasibility/techno-economic study (Break down into subsets of available technology,
market analysis, governmental policies & capital funding’s, & etc.)
 Findings & recommendation on plant selection & location (supplies,
climate/environmental, political strategy, & etc.)

Proposed Process Plant


 Basic plant operation (raw material/s, main & intermediate products, by-product &
wastes, & etc.)
 Flow-Sheet (stylized pictorial of plant’s general & auxiliary equipment)
 Schedule & timeline of the project (project progress structure; from project
specification to operation & sales)

CHAPTER 2

Plant Design (Final)


 Process flow diagram drafting (Detailed stream numbers/name, Formative & peer
reviewed); suitable printout sizing
 Summarize process condition of every stream (stream composition, flow rate, temp
&pressure)
 List & summarize all Primary & Auxiliary equipment in the plant (Equipment
identification)
 Isometric Drawings of Plant/Equipment layout & piping (AVEVA PDMS, CAD, etc)

Piping & Instrumentation Diagram (Formative & peer reviewed)


 Detailed stream numbers of all primary & auxiliary equipment; suitable printout
sizing
 Detailed identification of valves & fittings
 Detailed identification of instrument controller and control loops.

Simulation
 Dynamic/steady state simulation of plant design (Aspen Plus, CHEMCAD, etc.)

DESIGN PROJECT 2_FINAL REPORT FORMAT | JANUARY 2020


CHAPTER 3

A. Main Equipment (Detailed design & Specification, Purchase Cost, Isometric Drawing)
 Reactor (CSTR, PFR, Packed-Bed, Fluidized-Bed, etc.)
 Separation (Distillation, Striping Column, Membrane Filtration, Dryer, Absorption,
Extraction, etc.)
 Storage & Containment (Vessel, tanks, silo, etc.)
 Heat Transfer (Heat exchanger, Reboiler, Heater, Condenser, Vaporizer, etc.)

B. Auxiliary Equipment (Detailed design & Specification, Purchase Cost, Isometric Drawing)
 Transport of fluids (Pumps, Compressors, etc.)
 Process equipment (Agitator, Mixer, grinder, etc.)
 Transport of solid (hopper, conveyor, etc.)
 Utility (steam generator, cooler, mill/crusher, furnace, etc.)
 Environmental (Scrubber, ESP, incinerator, etc.)

CHAPTER 4

Safety & Hazard Analysis


 Hazard & Operability (HAZOP) study of process/project design (pressure,
temperature, noise, containment failure, fire & ignition, explosion, human error, &
etc.)

Health & Environmental Analysis


 Identifying environmental regulation abatement required within process plant
(Toxicity, flammability, instability, radiation, & etc.)
 Improvement of Pollution Control System within initial plant design (Air pollution,
water pollution, solid waste disposal, Thermal & Noise control, & etc.)

CHAPTER 5
Identify & justify possible sub-optimization for best investment strategy via:

Process Optimization (Supported by software simulation, eg. ASPEN PLUS)


 Optimum Production Rates (catalytic converter, multi stages reactor, etc.)
 Other possible utility optimization (Reflux ratio, Cyclic Operation, etc.)

Utility Optimization (supported by software simulation, eg. Aspen Energy Analyzer, HINT)
 Pinch Analysis & Heat Exchanger Network
 Other possible utility optimization (Cooling water flow rate, Piping Diameter, etc.)

DESIGN PROJECT 2_FINAL REPORT FORMAT | JANUARY 2020


CHAPTER 6
Analysis and conclusion on the proposed plant based on:

Project Financial
 Tabulated estimation of total capital investment (fixed capital, working capital
investments, & etc.)
 Tabulated estimation of production cost (sales price, fixed & variable charges,
expenses, & etc.)
 Tabulated estimation of plant’s Product/By-Product revenues & margin

Project Economics
 Economic evaluation of project (taxes, depreciation, financing & repayment, etc.)
 Estimation of Gross & Net Profit over plant’s operational years.
 Project investment cash flow (NPV, Cash-flow, IRR, etc.)

REFERENCES
Bibliography
 Complete identification of literature sources referred to within the report.

APPENDIX
Formative tabulation of data contributing to the main information in the main body of
report:

A. (Calculations Sheets)
 Detailed calculations supporting the design or analysis in the main body of report
(Material & Energy Balance, Equipment Design Specification, Optimization Regime,
Financial & Economic, etc.)
 Presented formatively & peer reviewed

B. (Derivation of equations)
 Essential to understanding the report but not presented in detail in the main body of
report.

C. (Tables of data)
 Information engaged in the main body of report but not essential to be included
(with reference to sources)

D. (extras)
 Deemed required for better formatting or referencing.

DESIGN PROJECT 2_FINAL REPORT FORMAT | JANUARY 2020