You are on page 1of 1
C PRIMETALS PROJECT NAME: Notification number tenmereste ; C.7WY0_AMLC_HSM/HSPM | pe) pticcn-AMLC-0005 coconal @ REQUEST FOR INSPECTION = FROM so = PRIMETALS / COCONAL ARCELORMITTAL / IDOM [copies Application date:_ 27/02] 2o20~ SUBJECT: FLUME SLAB CONCRET PAURING (COLADO DE LOSA DE CANAL) Module (RKSIMLD: wa Meeting Point: next to the structure EPC Contractor representative: TOMASZ LOZYNSKI SubcontractorRepresentative: MARCO MOJICA Description : ‘Area Identification: B01 scope: suap Document references Description Drawing N" c.7wy0.wH.17 20201-2F_sLP040 | Volume o Roport N° RFI-PT/CCN-AMLC-0004 Resistance: 280 Kaiem? npn | ACCEPTED esECTED ut Survey report postion of ovr and einen) o o a Chemise o o 3 . Conese cover 0 a im “Concce (empress atch che) a a COMMENTS: LOCATION OF INSPECTION DATE AND TIME OF DATE AND TIME OF POURING INSPECTION See drawing no, 21)oz] oz « 28 Joz| z0z0 « C.7Wy0.WH.17 20201-2F_SLPO40 hed oan attached to this sheet 2 OO am. aie PRIMETALS / COCONAL ARCELORMITTAL / IDOM ame SIGNATURE AND DATE:

You might also like