PROJECT NAME: Corrective Action No.

:
AM LC HSM & HSPM AC-PT/CCN-AMLC-010
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 1 from 3

REPORT NO.: AC-010


ANSWER FOR THE CLOSURE OF NON-CONFORMITY NO. NC-CA-
PTC-100 / RESPUESTA PARA EL CIERRE DE LA NO CONFORMIDAD
NO. NC-CA-PTC-100

The holes are drilled and it is checked


that they comply with the embedment
depth of the additional reinforcements. /
Se perforan los agujeros y se comprueba que
cumplen con la profundidad de
empotramiento de los refuerzos adicionales
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-010
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 2 from 3

The placement of the RE-500 anchoring system for additional


reinforcements is verified. / Se verifica la colocación del sistema de anclaje
RE-500, para los refuerzos adicionales.
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-010
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 3 from 3

Closure works for non-compliance completed, carried out according to


the proposal approved by GPI. / Trabajos para cierre de la no
conformidad Concluidos, realzados deacuerdo a la propuesta aprobados por
GPI

More additional reinforcements were embedded in the center of the


walls than those requested by the proposal originally authorized by
GPI, due to the fact that the supervision detected some reinforcements
that when placing the anchoring system needed more resin / Se
empotraron más refuerzos adicionales al centro de los muros de los que pide
la propuesta autorizada originalmente por GPI, debido a que la supervisión
detecto unas refuerzos que al colocar el sistema de anclaje les hizo falta más
resina
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-010
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 07-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 1 from 2

REPORT NO.: AC-010


ANSWER FOR THE CLOSURE OF NON-CONFORMITY NO. NC-CA-
PTC-100 / RESPUESTA PARA EL CIERRE DE LA NO CONFORMIDAD
NO. NC-CA-PTC-100
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-010
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 07-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 2 from 2

#8 @15 Additional reinforcements


#8 @15 1220 mm # 8 @ 150
450

1220

Embedment 230 mm

Seccion X-X' MC-2

Se propone anclar un refuerzo adicional de 1220 mm, con un


empotramiento de 220 mm / Se propone anclar un refuerzo adicional de
1220 mm, con empotramiento de 220 mm