PROJECT NAME: Corrective Action No.

:
AM LC HSM & HSPM AC-PT/CCN-AMLC-008
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 1 from 3

REPORT NO.: AC-008


ANSWER FOR THE CLOSURE OF NON-CONFORMITY NO. NC-CA-
PTC-097 / RESPUESTA PARA EL CIERRE DE LA NO CONFORMIDAD
NO. NC-CA-PTC-097

The holes are drilled and it is checked that they comply with the
embedment depth of the additional reinforcements. / Se perforan los
agujeros y se comprueba que cumplen con la profundidad de empotramiento
de los refuerzos adicionales
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-008
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 2 from 3

The length of the additional reinforcement is checked. / Se comprueba la


longitud del refuerzo adicional.
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-008
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 11-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 3 from 3

Closure works for non-compliance completed, carried out according to


the proposal approved by GPI. / Trabajos para cierre de la no
conformidad Concluidos, realzados deacuerdo a la propuesta aprobados por
GPI
PROJECT NAME: Corrective Action No.:
AM LC HSM & HSPM AC-PT/CCN-AMLC-008
Civil and Building Works for packages 1 + 2 of the AM
Lázaro Cárdenas HSM & HSPM Date: 06-08-20
Revision: 001
CORRECTIVE ACTION FOR THE
CLOSURE OF NON-CONFORMITY Page 1 from 1

REPORT NO.: AC-008


ANSWER FOR THE CLOSURE OF NON-CONFORMITY NO. NC-CA-
PTC-097 / RESPUESTA PARA EL CIERRE DE LA NO CONFORMIDAD
NO. NC-CA-PTC-097
B4
700 1450

450 250

325 MC-02
LOSA EXISTENTE
( ) 3#8 175
N.T.C.= 0.000 / EXISTING SLAB
T-02

190
E#4@15

600
( ) 6 #4

GR#4@15

1250
X
( ) 3#8
APLICAR ADHESIVO HIT RE 500 /
APPLY ADHESIVE HIT RE 500
Additional
reinforcements
# 6 @ 150

650
TRABE EXISTENTE
/ EXISTING BEAM
X'
900 255
LC-01

ESCARIFICAR HASTA 1" DE ESPESOR


POSTERIORMENTE LIMPIAR SUPERFICIE DE NOTA / NOTE:
CONCRETO Y ACERO CON CEPILLO DE
ALAMBRE, APLICAR SIKADUR 32 PARA UNIR PERFORACION CON BROCA DE 5/8 PARA VARILLA #4
CONCRETO NUEVO A CONCRETO VIEJO / PERFORACION CON BROCA DE 3/4 PARA VARILLA #5
SCARIFY UP TO 1" THICKNESS AFTER CLEAN PERFORACION CON BROCA DE 7/8 PARA VARILLA #6
A SURFACE OF CONCRETE AND REBAR WITH PERFORACION CON BROCA DE 1 1/8 PARA VARILLA #8
A WIRE BRUSH, APPLY SIKADUR 32 TO JOIN
NEW CONCRETE TO OLD CONCRETE PERFORATION WITH 5/8 " DRILL FOR REBARD #4
PERFORATION WITH 3/4 " DRILL FOR REBARD #5
MURO MILAN EXISTENTE / PERFORATION WITH 7/8 " DRILL FOR REBARD #6
DIAPHRAGM WALL EXISTING PERFORATION WITH 1 1/8 " DRILL FOR REBARD #8

Additional reinforcements
900 mm # 6 @ 150
75 #6 @15
#6 @15
REC
75
400

REC
75

#6 @15 PLANTILLA DE CONCRETO


#6 @15 f'c=100 kg/cm2. e=5cm /
MUD SLAB CONCRETE
f'c=100 kg/cm2. e=5cm

SECCION X-X' LC-01


1 : 20

It is proposed to include additional reinforcements of 900 mm # 6 @


150 as the detail shows/ Se propone incluir refuerzos adicionales de 900
mm # 6 @ 150 como lo muestra el detalle