Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
MECHANICAL
Page 5:
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
SS316L shall be used as metallurgy for all
tanks. Vendor to confirm same and update
pointwise response with date to each open
TBC point through page 1 to 22 based upon
this new change. Vendor to submit revised
quotation / editable deviation list / P&ID
accordingly and submit together in one lot
along with TBC response. TBC response will
not be reviewed if any of the four items in
preceding statement is missing.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
in sales meeting with client, Alderley
details of vendor and catalogues
considered Electric driven pump.
Alderlay to submit the experience list for
Noted.
aviation fuel dosing.
9. Mechanical Alderley reply dtd: 18th Mar 2020: Please find Closed
SLFE Response 15th March-20:
attached Alderley reference list (not in aviation
Vendor to submit the list along with revised
fuel).
quotation.
Commissioning spares and special tools are
Confirmed. :
10. Mechanical to part of base offer. These are no longer Closed
Alderley reply dtd: 27th Feb 2020 : Confirmed.
optional. Confirm.
Confirm that external ladder provided is
11. Mechanical galvanized and painted, also safety color Confirmed. Closed
painted per SAES-B-067
12. Mechanical a. The transfer pump scope is not clear from Please confirm, whether Motor operated Closed
quotation. Confirm, vendor considered same manufacturer standard centrifugal pumps are
as per its datasheet. accepted or not.
b. The transfer pumps offered are API 675?
Alderley reply dtd: 27th Feb 2020 : As per the
received transfer pump datasheets, we
SLFE Response 15th March-20: understood that these pumps are API675
Vendor to follow transfer pump design Positive displacement pumps.
requirements as per project documents (Data Client has not replied our query.
sheet & specification). Electric motors are
acceptable. Since the purpose of these pumps are only
SLFE Response 30th March-20: loading the chemicals, Alderley will consider
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
manufacturer standard Centrifugal pumps in
our revised proposal.
14. Mechanical Transfer Pumps are supplied loose or It will be loose supplied Closed
mounted on the skid?
SLFE Response 15th March-20: Alderley reply dtd: 18th Mar 2020: Confirmed.
Vendor to have transfer pumps mounted on
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
skids as per PID and project requirement.
SLFE Response 30th March-20:
Transfer pump of drum type as per
manufacturer standard is acceptable.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
from our offer.
provide the internal skid logic, sequence of
operations/control of internal skid process
Alderley reply dtd: 18th Mar 2020: Noted and
instruments.
confirmed.
Please provide the Pump manufacturer
All the dosing pumps considered are Motor
catalogue and details for hydraulic Rotor
19. Mechanical Operated API 675 Double Diaphragm Pumps. Closed
driven dosing pump. The hydraulic motive
Please confirm.
fluid will be DPK itself.
All the dosing pumps considered are Motor
Operated API 675 Double Diaphragm Pumps.
What input required from us for hydraulic Please confirm
20. Mechanical rotor driver of the pump. Do vendor require Alderley reply dtd: 27th Feb 2020, As confirmed Closed
pressure , flow etc of DPK(the motive fluid) in sales meeting with client, Alderley
considered Electric driven pump.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
required.
Mechanical/ Vendor to quote Analyzer optional
27. Electrical SLFE Reply 15th Mar-2020: Please advise and proi Closed
Analyzer is not required.
Mechanical All tanks shall be vertically mounted as
28 specified in data sheet and technical Noted and confirmed. Closed
specification
29 Mechanical First fill of all chemical to be filled by Vendor Confirmed. Closed
Provide exception/Deviation list. If there is no
deviation, write down NO DEVIATION and Noted.
submit the list
30 Mechanical Closed
SLFE Response 15th March-20 : Alderley reply dtd: 18th Mar 2020: Noted and
Please submit editable deviation list confirmed. Please find attached.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
induced by forces and moments of
interconnecting piping, Lifting and transport
load. Vendor to confirm.
Mechanical Skid shall be manufactured as per Alderley reply dtd: 18th Mar 2020: Noted and
38 Closed
requirements of 32-SAMSS-38. confirmed.
Mechanical Tank shall be design in accordance to 32-
SAMSS-30 along with internal and external Alderley reply dtd: 18th Mar 2020: Noted and
39 Closed
attachments including ladders / platforms as confirmed.
required.
40 Mechanical Skids shall be suitable for chemical Alderley, confirms that skid will be designed Closed
properties. Please confirm the liquid and manufactured as per the given process
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
conditions and material of constructions.
However, suitability of skids with chemical
characteristic as per attached MSDS.
needs to be taken care by Client in
consultation with chemical vendor.
Mechanical Vendor to provide completed data sheet
Alderley reply dtd: 18th Mar 2020: Noted and
41 (pumps, tank, etc) as per Saudi Aramco Closed
confirmed.
requirements.
Mechanical Alderley reply dtd: 18th Mar 2020: Noted and
42 Vendor to confirm transportation to site Closed
confirmed.
43 Mechanical Vendor to provide delivery time period. 38-40 week Ex works Closed
INSTRUMENTATION
1. Instrument Please reconfirm the SKID will be supplied It is considered, please refer our BOM in offer. Closed
with PLC System. If yes: Alderley reply: 27th Feb 2020, As per our sales
1- It shall be added to the list. manager visit with client it has been discussed
2- The termination shall be done to the PLC that PLC is not required so it will be removed
system (or logic solver). from our offer.
3- Update all clouded text in this offer from
the "edge JBs" to the "Skid PLC system / Alderley reply dtd: 18th Mar 2020: Noted and
Logic Solver" confirmed.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
required for skid, however Vendor shall
provide provision to propagate the Instrument
& Control signals to DCS Marshalling/system.
Vendor shall submit the considered I/Os for
the skid to be added to DCS I/O list by
contractor.
SAES-J-902: As a minimum, all cable glands
2. Instrument Confirmed. Closed
shall be made of 316 stainless steel.
1- SAES-J-100: 7.3.2.4 MLI assemblies shall
be minimum 1.5 inch NPT or 2 inch RF
flanged, class 150 and 40S chamber of 2 inch
diameter. Installation is similar to external
cage displacers - refer to Library Drawing DB-
950047.
3. Instrument Confirmed. Closed
2- Isolation valves shall follow the same size.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Coriolis Type?
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
as per the above list (BOM). OR update the
list to match the P&ID.
13. Instrument 1- Provide the pressure gauge range. 1. Noted and confirmed. Closed
2- Bidder to confirm whether the PI will have 2. Please advise if diaphragm seal is
diaphragm seal process connection or mandatory. Alderley has considered
isolation valve as indicated in the above list normal PT.
(discharge side line items 8 & 9). Alderley reply dtd: 18th Mar 2020: Noted and
confirmed. Alderley has offered PG without
SLFE Reply 15th Mar-2020: diaphragm seal.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
2- This note is regarding the PG represented
in the P&ID as diaphragm seal type.
However, as per the table of the Discharge
Side on page 12 of the offer, the pressure
gauges are not indicated with diaphragm seal
requirements. Diaphragm seal shall not be
required if the process fluid is not high
corrosive or toxic. Bidder is requested to
make consistency of the details between the
BOM and the P&ID.
Pulsation dampers shall be assigned to
14. Instrument Confirmed. Closed
instrument tag numbers.
Local signals shall be inside the battery limit.
15. Instrument Confirmed Closed
Bidder to confirm.
Where is Detail-A?
Signals shall be represented correctly to
16. Instrument identify whether the signal will be connected Confirmed Closed
to the Skid PLC or to the 3rd party system
(outside battery limit).
17. Instrument No motor at this tank? Please advise it is required? Closed
SLFE Reply 15th Mar-2020: Alderley reply dtd: 27th Feb 2020, Motor is not
Noted for the skid X13-U-1110 that does not considered at tank
have a mixer on the tank. However, Bidder to
confirm the supply of the transfer pumps to all Alderley reply dtd: 18th Mar 2020: Noted and
skids. confirmed. Alderley confirm to supply of
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
transfer pump to all skids.
SLFE Reply 15th Mar-2020: Alderley reply dtd 27th Feb 2020, As reply is
18. Instrument Closed
As per the MR package, the not provided offer is based on information
ANTI-STATIC/CONDUCTIVITY INJECTION provided in our revised offer.
TANK J60-D-2104 is 1890 Gallon. However,
other tanks (3 Qty) are 220 Gallon each. Alderley reply dtd: 18th Mar 2020: Noted and
confirmed.
CIVIL
Please confirm if any drain points required
Suction and Discharge common drain line is
1 Civil which require connection to gravity oily water Closed
provided.
system
ELECTRICAL
Bidder to confirm that all Electrical Installation
1. Electrical on skid shall be as per NFPA 70 and 17- Confirmed. Closed
SAMSS-515
Bidder to confirm that all Equipment are
2. Electrical suitable for 50 0C Maximum daily Peak Confirmed. Closed
Ambient Temperature
3. Electrical Bidder to confirm that 230V Task lighting shall Confirmed. Closed
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
be provided and NEMA 4X/7 enclosure
suitable for Class 1 Zone 2 location,
Temperature class T3 & Gas Group
IIA .Bidder to note that no Lighting Control
panel is required.
Electrical Bidder to confirm that Task lighting shall meet
4. Confirmed. Closed
requirement of SAES-P-123, Table 4
Electrical Bidder to confirm that separate Junction
Boxes shall be provided for Motor and Task
Lighting circuits at the edge of the skid and
5. Confirmed. Closed
NEMA 4X/7 enclosure suitable for Class 1
Zone 2 location, Temperature class T3 & Gas
Group IIA
Electrical Bidder to confirm that all wiring and
accessories shall be suitable for Class 1 Zone
6. Confirmed. Closed
2 location, Temperature class T3 & Gas
Group IIA .
Electrical Bidder to provide master Instrument Ground
7. Bus bar and Master Safety Ground bus bar Confirmed. Closed
on the skid for Grounding all Skid Equipment.
8. Electrical Bidder to confirm that all Motors larger than Alderley considered 0.75KW motor, please Closed
0.75 KW shall comply with 17-SAMSS- advise.
503and shall be TEFC suitable for Class 1
Zone 2, T3, Gas group IIA or Ex-nA suitable
for Class 1 Zone 2, T3, Gas Group IIA. Alderley reply dtd: 18th Mar 2020: Noted and
confirmed.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
SLFE Response 15th March-20
Bidder to confirm compliance to 17-SAMSS-
503 as it is applicable for 0.75 kW motor also.
Furthermore, Bidder to confirm that motor is
TEFC suitable for Class 1 Zone 2, T3, Gas
group IIA or Ex-nA suitable for Class 1 Zone
2, T3, Gas Group IIA
12. Electrical Bidder to provide Junction Boxes suitable for Confirmed. Closed
Class 1 Zone 2, T3 Temperature class, Gas
Group IIA only at the Edge of the skid . Motor
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
starter and cables upto the skid shall be
provided by the customer /Client.
PIPING
Piping As per P&ID all skids inlet and outlet lines are
2”.However, vendor to ensure the minimum
nozzle size for all skid connection is 1”.
Alderley reply dtd: 18th Mar 2020: Noted and
1 Closed
SLFE Response (03/11/2020): confirmed.
Vendor to provide their response regarding
above requirement.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
Downstream straight-line distance
requirement at injection point
MRK
Procurement All the materials i.e pumps, tanks, mixers,
instruments, electrical and structural materials
1 Confirmed. Closed
shall be from ARAMCO approved source.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
QC All the procedures i.e. welding, painting and
Closed
2 other applicable procedure need prior Confirmed.
approval from client/ARAMCO
Engineering All the NMR-601 documents need to be
submitted by vendor as a single package, Closed
3 Confirmed.
partial submission not acceptable.
Cost Status
Sl. SLFE
SLFE Comments Bidder Response Impact? (Yes (Closed
No. Discipline
/ No) Open)
SA approved third party Inspection shall be
the scope of Main Equipment Manufacturer