INSPECTION REPORT

-Dafe: - - I-oa.os.iozz
lnspection Report Number I zoAASg-O+0622-1 Rev: 00
Project code | 409418
l. General
Client: Tata Power Solar System Ltd NTPC _ GUVNL 150 MW
Supplier Ornet Transformer LLP Location Ahmedabad
Sub- Supplier DH Cube lndustries Pvt. Ltd Location Kheda Ahmedabad
P.O. Number 5000042'149 Rev. 00 Date I zs.to.zozt
Sub- Supplier P.O. oTLt2021-22lSO/15r Rev. 00 Date 07.03.2022
Number:

ll. Visit Details:


\Ol/E-mail Ref: Emailfrom Mr. Rajkiran Jate: 104 05.2022
nspection Location DH Cube Kheda Ahmedabad
lntact Details
Supplier I Name Mr. Hardik Zala 1 97230 22266
Sub Name Vlr. Anirban )hone 1 6351236078
Suoolier
r/isit Date(s) 4.05.2022 (01 Day)
nspection Stage ffil EPreDispatch
P O Order Status Partially Completed

I a). Items (Annexure may red,t if required)


Sr. No. / Description P.O. Qty. Offered lnspection Accepted Rejected Hold
PO ltem Qtv Sample Qtv. Qtv. Qtv.
No/BBU Qtv.
\'\.'. \
,

No .

Transformer MSYank & Accesso-ries


(HV, LV Cable box and conservator)
1
. (oRT-0100364) 06 Nos. 0'l No. 01 No. 01 No.
12.5 MVA
SR No : DH3-364-05

I ulrcnffiimer tank offered in the Black condition


I

lV. Summary of lnspection Activities Performed:


a) Reference Documents
Document No. Rev Title Approval Status Document
Supplied by
5000042 1 49 00 Purchase Order Vendor

TPSSL-SQP-O2O 06 MQP for ms Tank, conservator & Approved Vendor


Accessories
1 1-02083 02 Sht. 01 / 01 02 GAD of Transformer Approved by TPS Vendor

1 1-02086 01 Sht. 01 / 01 01 GA of HV Cable Box Approved by TPS Vendor

Page I of4 Format No: 15.03.0'l/F-01/R5 Date. 08-05-2021


IATA INSPEGTION REPORT
T'TTA PROJECTS

1 1-02088 02 Sht. 01 I 01 02 GA of LV Cable Box Approved by TPS Vendor


11-0209101 Sht. 01 / 0.1 0'l Foundation detail drawing Approved by TPS Vendor
22-2-032222 05 05 GAD of transformer Tank Approved by Ornet Vendor
22-2 04222 00 Pressure tank calculation As per CBIP Vendor
CBIP Manual Manual on Transformer Vendor
o) Hrevtous repott reference, if any: None

c) lnspection, Measuring and Test Equipment:


Sr.
Traceability
No.
to
NABL/NPL
0 -2.1Kglcm2 18.06.2022

0 - 1000 mm 18.06 2022


1.2 - 225 mm 2410.2022
Measuring Tape to 5000 mm
O 01.03.2022
1815382 24.10.2022
a) Accuracy of measurements ensured - yes I
b). Test witnessed at NABL Approved Laboratory _ yes ! No X NA X
!l Y"", Verify and note the NABL certificate number and its vatiditfi
lf No, Verify the facitities as per check list: TQS-|S-CL-02**
**This is applicab.le
for'(ests witnessed at unapproved Laboratories/manufacturing facility.
(Tick applicaUtE t'iaus{

d) IrP/QAP/MQP -Activities: (H-Hold, w- witness, R- Review, s- surveiilance)

ITP/QAF lnspectio@ H^^//RYS Quantum of Check


Clause
1.9 MS Tank, Conservatoi & AEEeEEsories
1.9.1 Plate Thickness 100 0/^
1.9.2 Dimension verification 10'.| 0/^
1.9.3 Air Leak Test W
1.9.8
",- ,es, on cnrrcar rlornrJ W-
_ 1.9.9 WPQ, WPS, PQR R 100 o/o
___ 1 9.10 Wetdrng Etectroqqg- R 100 %
1.9.13 Hydraulic test of Pipes R 100 Yo

e) lnspection Activity Narrative Summation:


Below mentioned activities performed at the vendor place during the inspection
' Transformer Tank identified with the Tank Sr. l"lo, t-tard Punch on it verified
order,
- and founcl in

' Dimensional inspection carried out including plate thickness checking for the
Transformer tank
along with the conservator and acce-ssories and all the dimensions aie found within
acceptable
Page 2 of 4 Format No: 15.03 01/F-01/RS Date: 0g-05-202.1
IAT'T INSPECTION REPORT
T'TTA PROJECTS

tolerance limits w.r.to approvgd drawing requirements.


. Air Leak test witnessed at 8,5 PSI for the offered transformer tank and conservator and neither
leakage nor pressure drop was observed during testing, All the joints are checked with the
liquid soap solution,
. LPT witnessed on the critical joints and no relevant indication was observed during the testing.
LPT found acceptable.
. Material test certificates for the plates and pipes are reviewed for its chemical and mechanical
properties and found in order w.Lto approved drawing and standard requiremerrt.s,
. WPS, PQR and WPQ reviewed and found in order.
. Hydraulic test reports for the pipes are reviewed and found in order.
. Welding electrodes test certificates reviewed and found in order.
o Calibration test certificates for the instruments / Equipments used for the inspection are
I

reviewed and found in order.

-;alance Activities : Visual inspection, PTVT test, , surface cleaning, flatness checking for the
transformer tank / conservator.
Note - All the Non-conformities to be recorded in Section g).

Notes/ Details of discussion with Client: None for this visit.

g) Non-Conformance /lssues:

Sr. No. Description of Component Description of Non-Conformance / lssues

None for this visit


h) ldentification:r \" \
Location of Stamping: NA'- Specimen

fl tuetat Stamp I Sticker E Marking


Specimen
lrlote. TPL Stamping is done for identification purpose only.

n: Based on above inspection activities carried out, offered items are found acceptable in
check, air leak test and LPT.

Vl. Attachments:

Sr. No. Descriptions No of Pages


1 Dimension lnspection report As attached
2 LPT Report, WPS, PQR, WPQ, Welding consumable TCs. As attached
2 Air leak test report, Hydro test report for pipe As attached
4 Calibration test certificates As attached

Vll. Safety Compliance:

Page 3 of4 Format No 15 03 01/F-01/R5 Date: 08-05-202'1


T,I?JT INSPECTION REPORT
T'TTN PROJECTS

a). Safety PPE Used: Safety Shoe I Hetrfiet f] Goggtes f] far ptugs I Nose mask X Hand Gtoves n

Supplier / Subr!ffirffiq - Tata Projects Ltd Client / Client Representative

?
6ji r r KugDrA
D

qignature & date: O+@ffi '^3x[irjlii;ird't


Signature & date: 04.05.2022 Signature & date:
me: Mr. Hardik Zala Name: Jatin K Kukadiya Name:
Mobile: +91 9096245564 Mobile: 9979207474 Mobile:
Liability: Client/vendor/supplier/manufacturer shall note that this inspection report is issued without prejudice to
obligations of the vendor/supplier/manufacturer and does not relieve hrm from the guarantee and obligation. sei forth in
.*tr".t*J
the purchase
order and other contractual documents. lt should also be noted that in all cases where the test certificlte/inspection reports
issued by
the vendor/supplier/laboratory are reviewed by the surveyor for conformity to the requirements of the siandard/specification,
the
Itp",tibilitY f"t t t results lies with the issuer of the said certificate/report.

,.\...
\

Page 4 of4 Format No: 15 03 01/F-01/RS Date: 08.05-2021