Inspection Certificate for LR Bends

This inspection certificate summarizes the inspection of 20 long radius bends produced by Lalit Rohr Fittings Pvt. Ltd. for GAIL (India) Limited. The bends passed inspection and met relevant specifications. Documentation submitted for inspection included material identification reports, pipe certificates, non-destructive testing reports, mechanical testing reports, inspection release notes, and MECON inspection reports. The bends were manufactured from Welspun pipe and accepted based on review of fabrication and inspection documentation.

Uploaded by

kbpatel123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views3 pages

Inspection Certificate for LR Bends

This inspection certificate summarizes the inspection of 20 long radius bends produced by Lalit Rohr Fittings Pvt. Ltd. for GAIL (India) Limited. The bends passed inspection and met relevant specifications. Documentation submitted for inspection included material identification reports, pipe certificates, non-destructive testing reports, mechanical testing reports, inspection release notes, and MECON inspection reports. The bends were manufactured from Welspun pipe and accepted based on review of fabrication and inspection documentation.

Uploaded by

kbpatel123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Form No. 11.20(DQM)F-19 Rev.

01

IC No. : 05.20.23U2.00387.IC.01
Regd. office : Doranda, Ranchi -834002; Jharkhand, India. Tel : +91 651 2482183; Fax : +91 651 2482214 Date : 22-Apr-2021
CIN No. INSPECTION CERTIFICATE Page 1 of 3
U74140JH1973GOI001199

Client : GAIL (India) Limited - Assam Project : 23U2 - EPMC Services for Barauni
Guwahati Pipeline Project - Engineering
S46 - PROCUREMENT OF LR Date of 12th April, 2021 & 13th April, 2021.
Package :
BENDS FOR BGPL PROJECT Inspection :

M/S LALIT ROHAR FITTINGS Contractor FOA NO.


Contractor :
(P) LTD. PO No. & date : 05.51.23U2.GAIL.015-R.FOA.719,
dated: 19-Dec-2020
Sub Contractor : Manufacturer : LALIT ROHR FITTINGS PVT LTD
LALIT ROHR FITTINGS PVT LTD
SAVLI- VADODARA, GUJARAT
Place of
PLOT NO-360, SAVLI- KARCHIA Inspecting Delhi
Inspection : Office :
ROAD
TALUKA-SAVLI, VADODARA,
GUJARAT
LRFPL/20-69/05, dated: Assignment 05.20.23U2.I.00387
Call no. :
01-Apr-2021 No. :

Hard copy received on : 01-April-2021

Following Items are inspected as per inspection documents in accordance with P.O specification and/or approved QAP
/ datasheet / drawing etc. ( as applicable ) and are accepted
B.S No. / Quantity
Item Description Unit
Equip. Id No. Total
Offered Accepted
Ordered
PRODUCTION 12” OD x 10.31 MM WT x 6D No, 20 20 20
BENDS BENDS, API 5L 415M {X 6OM} No 20 20 20
PSL 2 HFW

Identification Stamping : ¨ Yes þ No Type of Stamping :

Nil ¨ Punching ¨ Stenciled ¨ Sticker


Stamping Location : Rubber Stamp
¨
Specimen of Stamping :
Sampling Done :
¨ As per IS/IEC/ASTM/DIN/API/JEC/IEEE other standard
þ As per QAP ¨ 100 percent
¨ Other

SUB-CONTRACTOR/ PURCHASER / CLIENT'S


CONTRACTOR MECON
MANUFACTURER REPRESENTATIVE

Signature : Signature : Signature : Signature :

Name & Designation : Name & Designation : Name & Designation : Name & Desig : Harpreet
Singh, General Manager
(Project), Inspection & QA,

Note: 1.Acceptance of above equipment does in no way absolve the responsibilities of the contractor to supply and install the plant and equipment as
per T.S/Contract.
2.The issue of this Certificate by MECON or its authorised representative shall not bind Purchaser/MECON to accept the product should it on
further check /test before/during/after erection, be found not comply with the requirements of the contract.

Website: http://www.meconlimited.co.in; Email : inspranchi@meconlimited.co.in


Form No. 11.20(DQM)F-19 Rev.01

IC No. : 05.20.23U2.00387.IC.01
Regd. office : Doranda, Ranchi -834002; Jharkhand, India. Tel : +91 651 2482183; Fax : +91 651 2482214 Date : 22-Apr-2021
CIN No. INSPECTION CERTIFICATE Page 2 of 3
U74140JH1973GOI001199

Remarks : A} This Inspection Certificate is being Issued for 20 Nos. Long Radius Bends made from Welspun
manufactured Steel Pipes by M/s Lalit Rohr Fittings Pvt. Ltd. and offered for Inspection subsequently.

B} This Inspection Certificate is being Issued based on following Inspection Documents Issued Before/
During & After Inspection and submitted via Email by M/s Lalit Rohr Fittings Pvt. Ltd.:

1} M/s Lalit Rohr Fittings Material Identification Report Dated: 24.02.2021.

2} M/s Welspun Inspection Certificate as per EN 10204: 2004 Type 3.2 Dated: 08.06.2015 along with Pipe
Annexures of the same Date.

3} PQT Reports consisting of Sample Identification Report, Visual & Dimensional Inspection Report,
Ultrasonic Examination Report, Magnetic Particle Inspection Report & Hydro Test Report of the PQT
Bend.

4} Metheat Engineers Pvt. Ltd. following Test Reports of the Samples drawn from the PQT Bend:
A] Chemical Analysis {Spectro FE Base} Report
B} Tensile Test for finding out the Values of the following Technical Parameters:
1) Yield Strength
2) Ultimate Tensile Strength
3) Elongation %
4) V-Notch Charpy Impact Test
5) Reverse Bend Test
6) Vickers Hardness Test

5} TUV India Private Limited Inspection Release Note/ Certificate No.: IRN - 010102021321, Rev.: 00,
Dated: 15.04.2021.

6} M/s Lalit Rohr Fittings Test Certificate as per EN 10204 Clause 3.2 {TC No.: LRFPL/ PB/ MECON -
GAIL/ 20 - 69/ 03, R - 0, Dated: 15.04.2021.

7} MECON Inspection Report No.: 05. 20. 23U2. GAIL. LRFPL. LRB. 001, Dated: 13.04.2021

8} Following Inspection Reports of the Production Bends:

A) Bending Parameters Report {Temperature & Speed Monitoring Report}.


B) Visual & Dimensional Inspection Report {Bend Angle, Inside Diameter, Thickness at Extrados,
Ovality, Nominal Bend Radius, Actual Outer Arc Length, Tangent Lengths including Pig Test & Visual
Inspection}.
C} Surface Hardness Test Report.

SUB-CONTRACTOR/ PURCHASER / CLIENT'S


CONTRACTOR MECON
MANUFACTURER REPRESENTATIVE

Signature : Signature : Signature : Signature :

Name & Designation : Name & Designation : Name & Designation : Name & Desig : Harpreet
Singh, General Manager
(Project), Inspection & QA,

Note: 1.Acceptance of above equipment does in no way absolve the responsibilities of the contractor to supply and install the plant and equipment as
per T.S/Contract.
2.The issue of this Certificate by MECON or its authorised representative shall not bind Purchaser/MECON to accept the product should it on
further check /test before/during/after erection, be found not comply with the requirements of the contract.

Website: http://www.meconlimited.co.in; Email : inspranchi@meconlimited.co.in


Form No. 11.20(DQM)F-19 Rev.01

IC No. : 05.20.23U2.00387.IC.01
Regd. office : Doranda, Ranchi -834002; Jharkhand, India. Tel : +91 651 2482183; Fax : +91 651 2482214 Date : 22-Apr-2021
CIN No. INSPECTION CERTIFICATE Page 3 of 3
U74140JH1973GOI001199
D} Ultrasonic Examination Report.
E} Magnetic Particle Inspection Report.
F} Painting & Marking Report.

SUB-CONTRACTOR/ PURCHASER / CLIENT'S


CONTRACTOR MECON
MANUFACTURER REPRESENTATIVE

Signature : Signature : Signature : Signature :

Name & Designation : Name & Designation : Name & Designation : Name & Desig : Harpreet
Singh, General Manager
(Project), Inspection & QA,

Note: 1.Acceptance of above equipment does in no way absolve the responsibilities of the contractor to supply and install the plant and equipment as
per T.S/Contract.
2.The issue of this Certificate by MECON or its authorised representative shall not bind Purchaser/MECON to accept the product should it on
further check /test before/during/after erection, be found not comply with the requirements of the contract.