2.Refer To Calculation Sheet Of Pressure Loss In Duct (FCU Nos - F-T1/B0-02) 2 900x500 MASONRY DUCT FOR FIRE LIFT LOBBY 6 CHWS & SHWR RISER, PIPE SIZE TO BE SHOWN ON
PRESSURIZATION SCHEMATIC DRAWING
3.Refer To Calculation Sheet Of Pressure Loss In Duct (FCU Nos - F-T1/B0-03)
3 EXHAUST AIR DUCT T/A, DUCT SIZE TO BE SHOWN ON 7 PRESSURIZATION AIR DUCT FOR SMOKE STOP LOBBY,
SCHEMATIC DRAWING DUCT SIZE TO BE SHOWN ON SCHEMATIC DRAWING
4.Refer To Calculation Sheet Of Pressure Loss In Duct (FCU Nos - F-T1/B0-04)
4 600x400 SUPPLY AIR GRILLE FOR PRESSURIZATION 8 CONDENSATE DRAIN PIPE TO BE CONNECTED TO
NEAREST DRAIN
2
3 1
T1.A
1200x250
C O/A
ST 1.01
20l/s DN20- CD
4 16.0kWR S/A
9.0kWR
FCU-T1/B0-01 STANDBY
B 500x250
VD 5 400x400 RAG 1 VD 3.5kWR 500x250 2Nos 500x300 EAG
Principal Architect
CORRIDOR
700x300 EAL
2Nos S2 2Nos S3 350l/s
W/ISS PRD MFD
125l/s 125l/s
S3 2 (BY NOVEC
CAR WASH BAY 170l/s DN20- CHWS CONTRACTOR)
FCU-T1/B0-04
TECHNICAL ROOM
U FD
1200x250
DN20- CHWR FD S/A
1
150x100
A 3 EF-T1/B0-07 9.0kWR
7 DN32- CHWR
8
150x150 EAGROOM
ELECTRICAL EA 700L/S
F-T1/B0-01 C/W OBD 6 DN32- CHWS
CDU-T1/B0-01
EF-T1/B0-03 150x150 PAG 800x200 RAG
4.0kWR TOILET
3.5kWR
VD
800x200 RAG
25L/S W/ OBD
5 FD DN20- CHWS
FCU-T1/B0-03
DN20- CHWR VD
1200x250
250x200 3 FD 200x100
PRD
S/A
Local Architect
9.0kWR
DN32- CD DN25- CD C 1 2 3 250x200
4
150x150
1200x250
DN20- CD PRD DN20-PLENUM
CD 250x200
VD 2Nos 1200mm
DN20- CHWS
DN25- CHWR
5 6 7 8 F-T1-B0-04 S/A
9.0kWR
6 7 DN25- CHWS 100l/s VD
DN20- CHWR 4.0kWR 8 7 800x400 OAL Executive Architect
150x100
MFD
8
150x100
150x100 3
1200mm LS2
2
ST 1.02
1 3 VD
VD Project Management
OBD
1
150x150 EAG
20l/s O/A A/P C
4
VD
T1.D B
20L/S
F-T1/B0-03
3.3kWR STORAGE Quantity Surveyor
3
Civil & Structural Engineer : Principle Mep Engineer : Traffic Engineer
T1.E
CARL GAY
Project Title
MECHANICAL SERVICES
TOWER 1
GENERAL NOTES BASEMENT 0 PLAN
- DO NOT SCALE. VERIFY ALL DIMENSIONS BY SITE MEASUREMENT
- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
DRAWINGS AND SPECIFICATIONS.
Drawing No. Rev.
- SHALL BE PROVIDED THERMOSTAT FOR EACH FCU, FINAL LOCATION LMK-FC-LB1-B00-ICE-M -MEC-202-C C
BY TENANT/ID
Date Scale
27/05/18 1 : 100 @ A1
C Indochine Engineering Vietnam Drawn By Designed By Approved By
XUYEN LE KIET PHAN ROSS
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 When reproduced at correct scale this line measures 150mm