POWERGRID offers different options for leasing out its Towers to Telcos
for installation of mobile equipments. SMART
TELECOM
POWERGRID TELCOs
TOWER
Scheme-1 SPACE 220 V AC Supply 48 V DC Supply BTS & Antennas
"A move towards
Scheme-2 SPACE 220 V AC Supply / 48 V DC Supply BTS & Antennas Green Energy"
Scheme-3 SPACE 220 V AC Supply / 48 V DC Supply Active Infra. Sharing BTS
Mobile operators need to incur cost towards Platforms are placed at height of 7-8 Mtrs on PT
land leasing, towers installation etc. and existing Transmission Tower and therefore, BTS
also have to face local ROW issues. will not get affected from flood etc.
Platform
Site outage during flood and
Reduce effective cost
other natural calamities 7-8 mtrs
Fiber Connectivity for 4G Data OPGW Fiber connectivity Actual Site Photographs – Pilot
Non-availability of Fiber in rural area.
at Jhatikara Sub-Station (Delhi)
Provides fiber connectivity on towers in
rural areas giving additional benefits which
otherwise not feasible for Telecom
infrastructure providers.
Coercive
actions by Authorities
Multiple Policies/ such as shutting down
Multiple NOCs of operational site,
required from frequent fibre cuts,
various authorities unavailability of
Electricity etc.
Lack of Single
window clearance/ Retrospective
Challenges
Time-Consuming Implementation of
cumbersome
Faced by IP
State Tower Policies ONE STOP SOLUTION
procedure
Restriction on
High incidence
Location of
on Taxes such as
Cell Tower / Difficulty in
Entry Tax,
New Site Acquisition/
Property Tax
Problems in Row
etc.
Clearance