Process Responsibility
ME21N
MM Section
Goods Receipt of Material
In the Item details, Valuation Tab enter the unit price of an item and press Enter
Give G/L account as ‘40130028’ and cost centre as ‘2090000000’ as shown below
Click on and save the PR. System will generate PR no as shown below.
Select PO document type as ‘ZCON’ and enter PO date and select vendor whom you want to send the
purchase order.
For Stock Overview Use T code MMBE and enter the material no. System will show the on –order stock
which is nothing but Purchase order quantity and existing stock in Unrestricted Use Category if any.
Enter the Document Date, Posting Date, Delivery Note no, Header Text
Go to Where Tab and enter Storage Location as ‘A002’, Name of Goods Recipient, Unloading Point and
press Enter
The stock is now updated. Thus moves from ‘On order’ Stock to ‘Unrestricted Use’ stock.
4.0 Reservation
Enter Date of Reservation, Movement Type as 201 and Plant as 0109 and press enter.
Then select Material you want to reserve, quantity, Storage location where it actually exists and
cost centre of the material indenting department. In this case Civil Engg department wants
material. Then save. System will post the document and will generate reservation no.
Enter Invoice Date and PO no and press enter. System will fetch all the data from PO. Select the appropriate
tax code and click on Calculate Tax buttion.