Students can find their own practical place and apply to find the practical
placement. Students are encouraged to undergo the practical training in related
areas of study in order to adapt work environment. The purpose of doing practical
is to provide exposure to the students about the real working environment before
graduating from the university and also giving opportunities for students to match
the theories and applications. Expose the BBAEC students to the real operation
and human resources system institutions in Malaysia.
1
COMPANY BACKGROUND
2
1.2 MISSION AND VISION
1.2.1 Vision
Our food products are consumed in every household in Malaysia. We are a
company deeply committed to nourish the nation better. We do this by
providing quality food products that create value for our company, our
partners and our consumers.
1.2.2 Mission
Value creation by increasing market shares, introducing new products and
acquiring complementary products. It is our goal to be a market leader in
Malaysia. We will be market driven focusing on the brand building,
product performance and customer service. We will gain competitive
advantage by leveraging existing strengths, resources and developing new
competencies. We will be the best-cost producer and distributor.
3
The Company’s obligations under the privatization Agreement also
include the maintenance of the stockpile, the distribution of paddy price
subsidies to farmers on behalf of the Government, the management of the
Bumiputra Rice Millers Scheme and acting as a buyer of last resort at the
Guaranteed Minimum Price of paddy. The principal activities of the Group
are those of the procurement, importing, buying, processing and selling of
rice, rice by-products and paddy.
Paddy Procurement
Rice Importation
The import volume depends on the production of local rice. To fully meet
the rice requirement of the country, BERNAS imports about 30% to 40%
of Malaysia’s domestic rice demand annually. To protect the local rice
farmers, BERNAS’s import volume merely covers the shortfalls of
demand after ensuring the local rice production finds its way to the
market.
4
Rice Processing
There are more than 400 commercial rice mills in the country, out of
which 31 are owned and operated by BERNAS. BERNAS rice mills are
located mainly in major granary areas of Kedah, Perlis, Kelantan,
Seberang Perak and Kuala Selangor. BERNAS mills around 400,000
metric tonnes paddy annually which gives a total rice output of 270,000
metric tonnes of the total rice produced by all mills in the country. This
makes BERNAS the largest rice miller in Malaysia and a major marketing
outlet for the farmers’ produce.
Rice Distribution
5
1.4 MANAGEMENT TEAM AND ORGANIZATIONAL STRUCTURE
OPERATION SUPPORT
MANAGEMENT
6
Table 2.1 : Rice Process
PADDY
Paddy, sometimes known as rough rice is an
un-milled rice with the hulls still attached to
the kernels. Paddy therefore will have to go
through the necessary milling process before
fully milled rice is produced for human
consumption.
7
RICE HUSK
Rice husk is the inedible outermost layer of
the paddy grain which will be removed during
the milling process. Rice husks can be reused
as fuel source in power plants, heat generator
for boilers and for other non-energy purposes
in farming sector, animal feed stuff and the
like.
WHITE RICE
White rice is also referred to as fully milled
rice simply because the outer layer namely
husks and bran has been completely removed
from the kernel during the milling process.
White rice is the most common type of rice
being consumed among people around the
world.
RICE BRAN
8
BROWN RICE Brown rice also known as ‘hulled’ or
‘unmilled’ rice which is produced simply by
removing the outermost layer of the grain
(husk). The bran layer and germ of the grain
remains intact giving the rice a mild, nutty
flavor and chewier. It is also claimed as more
nutritious than white rice. When cooked, the
rice appears fluffy, light and stays separate.
Brown rice is great for making fried rice or it
can also be served plain with any kind of
healthy side dishes. However, the rice
requires longer cooking time because the bran
layer forms a barrier for water absorption.
9
noodles, pet food and to process other
ferment products.
10
TABLE 2.3 Drying and Milling Process
11
2.4 HARVESTING CALENDAR
12
13
1st WEEK (22th MAY 2017 – 25th MAY 2017)
14
2nd WEEK (28th MAY 2017 – 1st JUNE 2017)
This week, I was involved with 3 important meetings. First is the meeting
with the head of the support and operations department. All staff in the
department attended the meeting. The objective of this meeting is the program in
the eastern zone of Kelantan, Pahang and Terengganu.
On Thursday, all employees attend training aerobics for an hour and one
hour thus provides clarification on health entitled "the right time for consumption
by individual. This program gives more advantages and awareness about health
for the staff.
15
3rd WEEK (4th JUNE 2017 – 8th JUNE 2017
This week I was assigned to fill the form of sales of rice and rice. Before
filling out the form, I need to identify the form as needed. A sale of rice and rice
takes 24 hours and must be recorded prior to the process. The form shall be
recorded for sales data found in Peninsular Malaysia. After that, the form must be
given to my supervisor for verification and sent by e-mail to factories that buy
rice. Data should be up to the buyer. This form also needs to have a record of
vehicle purchase to delivery process for company buyers. Further the form
reproduced to the point recorded. After that, I took the initiative to the financial
department to learn new things. I placed the financial department. Financial
management is really important in all types of business, either profit organization
or non-profit organization. According to Dr. S.N. Maheshwari, financial
management is concerned with raising financial resources and their effective
utilization towards achieving the organizational goals.
16
4th WEEK (11 JUNE 2017 – 15 JUNE 2017)
This week I took the initiative to organize the files in my unit. I also get
instructions for arranging all the paper according to the file provided. For three
days I took the time to compile paperwork d units I. Then I label files to be more
neat and organized. During the compilation of files, I get to learn a bit of e-
mailing. I also get instructions for arranging all the paper according to the file
provided. For three days I took the time to compile the papers in the store. Then I
label files to be more neat and organized.
17
5th WEEK (18th JUNE 2017 – 22 JUNE 2017)
This week I was assigned to store any data in DOA System. DOA is one
of the main systems that have been use by BERNAS. I have been taught by my
supervisor to use this system. I need to save payment via direct banking which are
from Bank Simpanan Nasional, Bank Islam and Bank Pertanian. I also need to
save payment via agent and bank instruction which from Bank Islam only. Then, I
need to transfer agent and bank instruction payment from Bernas Domestic
Operation Application system and finalize the payment by using excel then
making payment (KBB PADDY PAYMENT) via e-banker. I recorded all the data
as instructed by my supervisor.
The rice data to be made to facilitate data updated and referenced monthly
to the company. The second is the vehicle data, this data is used as a reference for
a claim to be made by the company to the buyer. The data is from January to
March. The third is internship student data in Jitra and Glenmarie, Shah Alam,
This data takes a week to complete and handed over to my supervisor. During
this week, Charity work is made for three days in the village of Pahang. I am only
involved in providing equipment before they go to the village to provide
assistance. He does not have the opportunity to participate in this program
because this program only specific employees only.
18
6th WEEK (25th JUNE 2017 – 29th JUNE2017
This week Mrs. Azah Idris as a practical practitioner in a practical unit has
come to visit practical students who are at Jitra. She also briefed on the details of
discipline and terms within the company. She also constantly monitors daily
reports and student attendance throughout the practice. For two days we were
given the task of being a practical student to understand the objectives of this
company and after two days we had to briefly present the task. On Wednesday, I
was given the opportunity to join the "FLEX PROGRAM" program. This program
is to train new staff who will work at BERNAS. I also attended a seminar on
human resource management about self-confidence, trusting leaders and others.
Furthermore, this seminar is also held during the three days of the seminar. This
Thursday, all employees involved in the health program. Today, it is a week of
exercise for 20 minutes and the motivation this time is the increase in metabolism
in the body. The trainer share knowledge about how to achieve high metabolism
in the body.
19
8th WEEK (9th JULY 2017 – 13th JULY 2017
This week I got the job of my colleague about the tender of transportation.
I examine and understand all the conditions in the tender. I also make memos and
preparation for the meeting the next day. Besides, I also joined my colleague in a
program called "zero stock" at Bernas Jerlun rice factory. This zero stock is a
program for the clearance of the old rice in the refined factory before entering the
month of August. Each factory needs to calculate the old stock to be recorded. We
checked all the rice that we called 'jumbo' (1000 kg) then we checked the
surrounding of the factory. I also prepared a zero stock report for my supervisor to
review and picture the image as a reference.
20
9th WEEK (16th JULY 2017 – 20th JULY2017
On Sunday, i started my work with key in the data into Microsoft Excel.
Then i helped the staff to prepare "JAMUAN HARI RAYA" next week. After
that, i met the staff Cik Syamimie and Puan Hasliza karia about the program
tomorrow. They give some brief about program and i need to prepare the
document. On Monday, the program is headed by Mr kamal, Mrs. Hasliza and Cik
Syamimie. Firstly, we went to the rice factory of the zone 1. (Kodiang, Pering,
Megat Dewa) the program we called "5s". "5s" is
21
10th WEEK (23rd JULY 2017 – 27th JULY 2017)
This week, I started did a report about the program ‘5S’ last week. This
report must have an objective, safety, and the details of report of the factory. Then
the report must be compiling and gave the report to Mr. Kamal to be check. On
Monday, i got a task about preparing tender and understand all the term and
condition. Then, i attend the meeting and discuss retender of the transportation. I
am a secretary to record all the detail of the tender. Then i make the report and
must give to the other department to be check about financial.
On Tuesday, I am involved with the flex program. For that day, FLEX
program have a study case. I also participated in the case studies and after that we
had to present to the underprivileged staff under the operating department. The
study of the case I can learn about dispose rice and solid waste of paddy in private
company. On Wednesday, I continued my work to fill out the form as buying and
sell paddy every day. The form must be given to my supervisor. Then I got a task
to key in data about transportation from Kelantan, Pahang and Terengganu. On
Thursday, as usual all staff joined the exercise like Tabatha and fitness test and
the coach brief about healthy life. Then I continued my routine work to fill out the
form and give to my supervisor.
22
11th WEEK (30th JULY 2017 – 3rd AUGUST 2017)
Other than that, I’m making bank reconciliation which the steps is need to
approve and post payment at Microsoft Dynamic AX by transferring all the data
payment for a certain date from e-banker to Microsoft Excel. Then, calculate the
amount for every batch number. Check amount and make sure the amount was
tally in e-banker and Microsoft Dynamics AX. Next, update the payment
reference at Microsoft Dynamics AX for every payment made by copying the
payment batch number from e-banker. By using Microsoft AX is very helpful and
easy to work. However, this server is very difficult to use because I am still
amateur but I am trying to learn all this week. On Thursday, I attended the
meeting about wellness program. This meeting is about “Sport Day” will be held
on September. The main objective of the program is to strengthen the relationship
between all staff Bernas in Malaysia. The second object is to provide health
awareness.
23
12th WEEK (6th AUGUST 2017 – 10th AUGUST 2017
24
13th WEEK (13th AUGUST 2017 – 17th AUGUST 2017
This week on the first day I need to understand the laws related to rice and
rice. Then I was briefed on paddy, rice type, rice type, and other insect species.
Then, I need to read before making an analysis on paddy and rice. I spend with
reading books on paddy and rice for the first day
I have spent a lot of knowledge about the paddy and rice and after that I
can know the best quality of rice that we needed in our daily life. This analysis is
made three times a year.
25
14th WEEK (20th AUGUST 2017 – 24th AUGUST 2017
This week, we had an invitation for annual grand meeting For KELAB
BERNAS MALAYSIA (KBM) and Koperasi Kakitangan Bernas Berhad.
Basically KBM is the Group’s sports and recreation club which has its affiliates in
every region where BERNAS operated. Programs organized by KBM include
futsal matches, inter-club bowling and badminton tournaments and subsidized
company trips to foreign destinations. Koperasi Kakitangan Bernas Berhad has
been established to create a form of cooperation and mutual support for business
capital purposes to improve socio-economic standards while establishing a form
of financial facility to help members to solve financial problems. This Annual
Grand Meeting is held in order to choose new president, vice president, secretary
and other position among committee members. While, practicum students have
been assigned to in charge for registration part and need to calculate and record
the number of votes. The meeting was held at JPAM Hall, Anak Bukit, Alor
Setar. Being in the meeting surely was a great and valuable experience for me.
Furthermore, I have done my daily routine like update data from Microsoft
Excel. Then, doing file label, scanning document, rename it and also helping my
colleague in doing indices for file and print out some important document for
tender.
This week is my last day as a practical student here. So, I have to spend all
my work perfectly before practicing ends. For the last day, staff from my
department made farewell party for me for the past three months. In addition I get
a lot of knowledge and experience in work.
26
WORKING EXPERIENCE
The second project is program “5S”. This project is important and i need
to prepare the document. The program is headed by Mr kamal, Mrs. Hasliza and
Cik Syamimie. "5s" is to sustain. It maintains establish standard and procedure.
Secondly is sort. It keeps only necessary item in the work place. Thirdly is
stabilizing. It arranges items to promote efficient work. Fourthly is shine. It keeps
the work place and equipment clean. Fifthly is standardizing. It creates standard
for a consistently organized. I learn a lot of knowledge especially when I have an
opportunity for checks the all factory.
27
PROBLEMS ENCOUNTERED AND SOLVED
I need to be wise in order to handle the situation if there are lots of tasks at
the same time which make the important task first and only then make the rest
tasks. Be wise and efficient to well-presented in working environment rechecking
the number and amount before entering the data. For example, if making vendor
payment or making claims payment, I will make sure that the account number for
receiver is correct.
For the 2nd project is program ‘5S’. This program requires a high
commitment between the factories in the Kedah Zone. I am practical student I do
not have the opportunity to participate in this program in the Kedah Zone 2. This
was due to the safety factor for practical students who did not have insurance as
long as practical. However, my supervisor gives me to join this program in only at
Kedah Zone 1 and I took the opportunity to gain experience in recognizing the
machines in the factory.
28
RECOMMENDATION
For university, I suggest that the duration of training may can be longer as it will
be more beneficial, giving more exposure to the trainers to allow them to learn
and gain more knowledge. Besides that, I also want to suggest BERNAS to give
more challenging task to practical student since we have limitation to do some
work given. If we have more tasks to do, then it would be benefit to us in gaining
working experience.
29
CONCLUSION
During industrial training, I have gained new experience and learn something new
especially in operation job scope and I found that several thing are important
which critical and analytical thinking, time management, goal management and
colleague interactions. Besides that, I also have to face with problem which like
overloads task for a certain time and mistake entering data into system. However,
within this four months of internship, I manage to overcome it with successful and
it would be meaningful for me. Moreover, industrial training give chance to
students to learn in order to improve performance, gain knowledge, measuring the
ability of self and been exposed about the real working life which can be apply in
the future.
30
REFERENCES
31
APPENDIXES
32