You are on page 1of 10

UNIT 71 RAW WATER SYSTEM

SULPHURIC ACID SOL.


CHEMICAL DOSING PACKAGE
-SULPHURIC ACID
-ASU TRAIN 1&2 (UNIT10)
-CAUSTIC SODA
-HEAVY ENDS RECOVERY (UNIT 35)
-PHOSPHATE
-WATER TREATMENT (UNIT 40) CAUSTIC SODA SOL.
-AIR COMP. PACKAGE (UNIT 75)

N2
-STEAM TURBINE GEN. A/B
-ATR TRAIN 1&2
-ATR COMMON (UNIT 20)
DEMIN PACKAGE DEMIN PACKAGE -FT TRAIN 1&2 (UNIT 30)
-WATER TREATMENT (UNIT 45)
71-XP-002 71-XP-002 -PRODUCT WORK-UP (UNIT 50)
-H2 PRODUCTION (UNIT 60)

RAW WATER
FROM 71-TK-001 -UNIT-72
RAW WATER NEUTRALISATION -72-XP-006/007
RLIC BASIN -72-TK-001
TANK -72-PC-002 A/B
71-TK-005

RAW WATER POTABLE WATER SUPPLY


TO MINERALIZATION 71-TK-003
74-TK-001 PACKAGE POTABLE WATER
71-XP-003 TANK RETURN

FIRE WATER

CALCIUM CHLORIDE SOL.


CHLORINE DOSING SOL.

MAGNESIUM SULPHATE SOL.

SODIUM BICARBONATE SOL.


To
To ATR To
To PWU Common ASU
Vent Equip
UNIT 72 HP STEAM SYSTEM
Super
Heated HP
Steam Header

From
HP To MP From Sat. HP Sat. HPS
ATR
Let down HPU Steam to FT

HP
Polished Combined Steam
Condensate Cold condensate
Sat. HP Steam
Header

SUPER HEATER
BOILERS
DEAERATOR 172-HF-001
A/B/C.
172-XP-001

Chemical LP BFW Blow


dosing steam Down
To ETP Natural
Natural Gas From
Chemical Liquid Fuel
BFW Gas RLIC
Dosing From Unit 40
Header Tail
LP Gas
Steam From Sat. MP
Unit 35 Steam
Super heated
Super MP Steam O/L Inlet
Heater HPU ATR
UNIT-73BLOCK DIAGRAM
HP-MP
U-30 LETDOWN 6 NO PSVS 4NO PSVS

759T/H 88T/H
173-PV-0001

SAT MP

11barg
U-10 ASU 11T/H
188OC
U-20 ATR 16T/H
MP STEAM CONDENSER
U-40 WTU 64T/H

U-30 FTU 64T/H

U-50 PWU 2T/H


COLD COND
U-81 FLARE 3T/H

U-83 2T/H
493 T/H
SUPER HEATER

SUPER HEATED MP

10barg
209OC 285 T/H U-20 ATR 82T/H

U-30 FTU 91T/H

STEM
OWN
POWER GEN U-50 PWU 34T/H
TURBINE
BLOWD
BOILER
ATR FTU
173-PV-004 A/B
PWU
COLD COND 10T/H 6 NO PSVS
H
10T/H H
0.8T/
0.4T/
LP STEAM 76T/H

3.5 barg U-20 ATR


148OC 46T/H COLD COND
57T/H
U-30 FTU
COMINED
COND U-60 HPU

U-50 PWU
172-VC-001
U-35 HER
173-VC-001 U-81 FLARE
BFW PUMPS
U-83
UNIT 74 - COOLING WATER SYSTEM

WATER LOSS DUE TO


EVAPORATION

TREATED PROCESS WATER


MAKE-UP FROM
77-TK-008
COOLING TOWER
74-EC-001 COOLING WATER BLOWDOWN
TO 77-TK-003A/B

RAW WATER MAKE-UP


FROM RLIC
(During start-up)

CMEMICAL DOSING PACKAGE

SULPHURIC ACID
CORROSION INHIBITOR
DISPERSANT
OXIDIZING BIOCIDE
ANTI FOAM AGENT
UNIT 75 BACK-UP AIR COMPRESSOR

AIR AIR DRYER


COMPRESSOR PACKAGE
PACKAGE 75-XP-002
75-XP-001

ORYX-GTL USERS
ASU – UNIT 10
AIR RECEIVER
75-VD-001
INSTRUMENT AIR

PLANT AIR

HP NITROGEN

LP NITROGEN

LIQUID N2 STORAGE

-72-XP-001 A/B/C
-72-HF-001
FLAME -20-HF-101/201
SCANNERS -60-HF-001
AIR FANS
75-CB-001 A/B
UNIT 77- EFFLUENT TREATMENT SYSTEM

77-TK-010 77-TK-011 77-XP-020 77-TK-014


OILY STORMWATER SUMP OILY STORMWATER BASIN CPI PACKAGE SLOP OIL TANK

Chemical Dosing Package,77-XP-021


LP Nitrogen UNIT 83
INTERMEDIATE
TANKAGE

CW Blowdown fr. Unit 74 NC OIL DRUMS


77-TK-001
Off-spec. HP Steam fr. Unit 20/72 REWORK TANK

NC

NO

Unit 60 process condensate


Unit 71 regen waste 77-VD-001 77-EP-002A/B 77-TK-002 77-TK-003A/B 77-TK-006A/B
Steam systems blowdowns BLOWDOWN DRUM BIOTREATMENT NO EQUALIZATION BASIN AERATION BASINS CLARIFIERS
FEED COOLERS

77-TK-018 77-TK-034A/B 77-TK-035A/B 77-TK-008


CLARIFIED WATER/ DAF TANKS SAND FILTER TREATED WATER
SCUM SUMP TANKS SUMP

77-XP-007 77-TK-OO7 77-TK-040


BELT THICKENER SLUDGE HOLDING INJECTION TANKER
PACKAGE TANK

77-TK-019
BELT THICKENER
SUMP
UNIT 78 FUEL SYSTEM

BOILERS
HP FLARE

SUPERHEATER
NATURAL GAS
NATURAL GAS K.O. DRUM
FROM RLIC 78-VD-004
UNIT-20

OILY SEWER
UNIT-50

VENT TO LP FLARE
UNIT-40

LIQUID FUEL
LIQUID FUEL SURGE DRUM SUPERHEATER
FROM UNIT-40 78-VD-003

AQUEOUS WASTE
LP N2 TO UNIT-40
FROM UNIT-75

SUPERHEATER

TAIL GAS
FROM
UNIT-35
UNIT-20
UNIT 81 FLARE SYSTEM

TO ATMOSPHERE

LOW PRESSURE
HYDROCARBONS HEADER
RELEASE UNIT 81
FROM UNITS
20,30,35 FLARE & VENT GAS SYSTEM
40,50,60
72,73,78
83 . HIGH PRESSURE
. HEADER

VENT GASES FROM

130-VD-013
130-TP-015
183-TK-004
183-TK-005
140-VD-001
140-VD-003
140-VD-006
145-XP-003
ATMOSPHERE

NATURAL GAS

AIR
UNIT 81
MP STEAM
& VENT GAS SYSTEM
FLARE SLOPS
TO 83-TK-002

FLARE SEAL WATER


TO 77-XP-020

FLARE SEAL WATER


FROM 77-TK-008
UNIT 82 FIRE WATER SYSTEM

FIRE WATER
FROM RLIC FINAL TANKAGE
(SEAWATER) UNIT 84

FIRE WATER BACK-UP


FROM RLIC
(SEAWATER)
FIRE WATER MAIN RING
RAW WATER GTL FACILITY
FROM RLIC
(Desalinated)

FIRE WATER PUMPS


RAW WATER TANK 82-PC-002A/B/C
STORAGE
71 TK-001

FIRE WATER
JOCKEY PUMPS
82-PC-001A/B

FIRE WATER
SPRINKLER PUMPS BUILDINGS
82-PC-003A/B