FDPS BTG PANEL 1 LOOP 3 PM(Area:- Cable Vault 8.5 Mtr.,AHU Unit at 8.5
Mtr.,220 VDC Charger & Main Plant UPS & ACDB & Battery Room, TG
30-Nov-20 Building El.8.5 Mtr. outside area Unit-1,Boiler MCC at El 27.5 Mtr.) 1
FDPS CHP PANEL 1 LOOP 7 PM(Bunker House Cable Vault & MCC Room,PLC
30-Nov-20 Room,JNT-5 & 6 DVLCP,BCN-8A & 8B) 1
30-Nov-20 Boiler FD FAN-B with LOS Instruments 1
30-Nov-20 TURBINE Portable Oil Centrifuse 1 1 1
30-Nov-20 BOP Field Instruments installed at Field Hostel 1
30-Nov-20 TURBINE TG BULDING POTEBLE WATER TANK 1
30-Nov-20 CHP SAC – Drive pinion and gear segment inspection 1
Wagon Tipler SAC- Hydraulic system arm cylinder and coupler cylinder inspection 1
30-Nov-20 and cleaning.
30-Nov-20 Wagon Tipler SAC- Hydraulic system arm Electrical motor inspection 1
30-Nov-20 Wagon Tipler SAC- Hydraulic system arm C&I instruments inspection 1