You are on page 1of 1

JHABUA POWER LIMITED

CPU PM COMPLIANCE OCTOBER-2020

Doc No. JPL/MTP/PM/07/17


S.NO Date PTW No Remarks
Area Equipment CPU

1 CPU Regeneration Building - CAUSTIC TRANSFER CUM 1


RECIRCULATION PUMP- "A" 2-Oct-20
Regeneration Building - CAUSTIC TRANSFER CUM
2 CPU RECIRCULATION PUMP -"B" 1
2-Oct-20
3 CPU 1
Regeneration Building- CAUSTIC PREPARATIN TANK AGITATOR 4-Oct-20
4 CPU 1
Regeneration Building- CAUSTIC MEASURING TANK AGITATOR 5-Oct-20
5 CPU DM Plant - DM WATER REGENERATION & TRANSFER PUMP - 1
"A" 6-Oct-20
6 CPU DM Plant - DM WATER REGENERATION & TRANSFER PUMP - 1
"B" 6-Oct-20
7 CPU 1
Regeneration Building - REGENERATION AIR BLOWER- "A" 7-Oct-20
8 CPU 1
Regeneration Building - REGENERATION AIR BLOWER- "B" 7-Oct-20
9 CPU CPU TG 0 METER - CPU AIR BLOWER- "A" 1 8-Oct-20
10 CPU CPU TG 0 METER - CPU AIR BLOWER- "B" 1 8-Oct-20
11 CPU Regeneration Building - ACID UNLOADING PUMP-"A" 1 9-Oct-20
12 CPU Regeneration Building - ACID UNLOADING PUMP-"B" 1 9-Oct-20
13 CPU Regeneration Building - CAUSTIC UNLOADING PUMP-"A" 1 10-Oct-20
14 CPU Regeneration Building - CAUSTIC UNLOADING PUMP-"B" 1 10-Oct-20
15 CPU Regeneration Building - DILUTION HOT WATER TANK HEATER 1 1
&2 12-Oct-20
16 CPU Regeneration Building - ALL EXHUST FAN 1 23-Oct-20
17 CPU CPU Bulk hydrochloric acid Tank No.01 1 24-Oct-20
18 CPU CPU Bulk Caustic Tank No.01 1 25-Oct-20
19 CPU Regeneration Building-ACID DOSING PUMP - "A" 1 28-Oct-20
20 CPU Regeneration Building-ACID DOSING PUMP - "B" 1 28-Oct-20
21 CPU Regeneration Building - CAUSTIC DOSING PUMP - "A" 1 30-Oct-20
22 CPU Regeneration Building - CAUSTIC DOSING PUMP - "B" 1 30-Oct-20
Total Submission
Total 22
Balance

PMPL Engineer Verified by JPL