PROGRESS SCHEDULE
PROJECT RELIABILITY IMPROVEMENT P
TAHUN 2022 - 2023
SC
IMPROVEMENT ITEM PIC Budget
Jul-22 Aug-22
MASTER Running
Extruder (DiePlate CAPEX/PCE/2022/003)
Granule PCR-2
c. LIQUID PEROXIDE
- Pump P 5070 A ( Use Ex P 804 A) Anton
- Pump P 5070 B ( Use Ex P 804 A) Anton
- New FT - 5080 THD 6,300
- Dumper Anton
- Sparger System MRM
7. SOLID - GAS CLASSIFIER CAPEX/PCE/2022/003
a. Process Calculation MRM
b. Detail Design & Drawing SMD/AMN
c. PID & MOC SMD/AMN
d. Hazop YSH
e. Isometric Drawing SMD/AMN
f. Pengadaan peralatan
f. 1 Gas-Solid Clasifier AMN
f. 2 Blower AMN
f. 3 Bag Filter AMN
f. 4 Rotary Feeder AMN
g. Piping & Installation FTA
h.Commisioning MSM
8. RECYCLE FACILITY CAPEX/PCE/2022/003
a. PID & MOC YSH
b. Hazop YSH
c. Isometric Drawing YSH
d. Pengadaan peralatan
d.1 Screw Conveyor Anton
d.2 Rotary Feeder Anton
b. Konstruksi FTA
9. BAGGING HOPPER CAPEX/PCE/2022/003 -
a. Install LSH & LSL THD/FTA
b. Heat Seal bagging granule THD/FTA
Engineering Divison
PROGRESS SCHEDULE
PROJECT WATER RECOVERY & OLIGOMER STOR
SC
IMPROVEMENT ITEM PIC Budget
Jul-22 Aug-22
MASTER Tender
Water Recovery
Cleaning Water Pond 1 & 2
Oligomer Stroring system
Sejak saat ini EX 801 bisa di feed ANOX 100% dan Oil 100%
P 804 A/B (Anox) dan P 812 A/B (white Oil)
LOB EX801, Granule 2 dan EX 5001, masing -masing 1 pompa
Paket Tender ke -3
Piping installation
HEDULE
LIGOMER STORING SYSTEM
SCHEDULE
Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23
Install New Screw Install New Gear Box