Sakaka Project 405 MW

Block NO. : Checklist - Electrical Installation of ACCB

Refrence drawing: 18002-EA-EVD-012-04/18002-ED-ECD-005-05 Checklist No. : 18002-PVB-FQE-CL-ACB-001-1

ACCB

ACCB

ACCB

ACCB

ACCB

ACCB

ACCB

ACCB

ACCB

ACCB
ACCB No.

Items to be checked

Cable glands are installed


The AC cable is connected to the correct
Inverter
The correct heat shrink is used, heat is
AC 400mm2

applied uniformly

L1
The correct torque is
applied(30 N.P) & bolts L2
are marked
L3

cables are labled

Cable glands are installed


The AC cable is connected to the correct
Inverter
AC 50mm2

The correct heat shrink is used, heat is


applied uniformly
L1
The correct torque is
applied(15 N.P) & bolts L2
are marked
L3
cables are labled
Ground cable is connected and torqued
(8N.P)
ACCB are labled
Remarks:

Sub-contractor EPC QC EPC Client